blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3983669

EP3983669 - WIND TURBINE AND ENERGY CONVERSION FACILITY COMPRISING SUCH A WIND TURBINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.05.2024
Database last updated on 22.08.2024
FormerThe patent has been granted
Status updated on  09.06.2023
FormerGrant of patent is intended
Status updated on  05.02.2023
FormerRequest for examination was made
Status updated on  18.03.2022
FormerThe international publication has been made
Status updated on  18.12.2020
Formerunknown
Status updated on  20.06.2020
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): CZ, RO, SK
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Alizen Energie Durable
La Romavique Lieudit Jurieux
42800 Sainte-Croix-en-Jarez / FR
[2022/16]
Inventor(s)01 / CHAVEROT, Pierre
La Romavique Lieudit Jurieux
42800 Sainte Croix en Jarez / FR
 [2022/16]
Representative(s)Lavoix
62, rue de Bonnel
69448 Lyon Cedex 03 / FR
[2022/16]
Application number, filing date20732215.712.06.2020
[2022/16]
WO2020EP66257
Priority number, dateFR2019000630813.06.2019         Original published format: FR 1906308
[2022/16]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2020249709
Date:17.12.2020
Language:FR
[2020/51]
Type: A1 Application with search report 
No.:EP3983669
Date:20.04.2022
Language:FR
The application published by WIPO in one of the EPO official languages on 17.12.2020 takes the place of the publication of the European patent application.
[2022/16]
Type: B1 Patent specification 
No.:EP3983669
Date:12.07.2023
Language:FR
[2023/28]
Search report(s)International search report - published on:EP17.12.2020
ClassificationIPC:F03D3/06
[2022/16]
CPC:
F03D3/062 (EP); F05B2240/211 (EP); Y02B10/30 (EP);
Y02E10/74 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/16]  
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:WINDTURBINE UND ENERGIEUMWANDLUNGSANLAGE MIT EINER SOLCHEN WINDENERGIEANLAGE[2022/16]
English:WIND TURBINE AND ENERGY CONVERSION FACILITY COMPRISING SUCH A WIND TURBINE[2022/16]
French:ÉOLIENNE ET INSTALLATION DE CONVERSION D'ÉNERGIE COMPRENANT UNE TELLE ÉOLIENNE[2022/16]
Entry into regional phase10.12.2021National basic fee paid 
10.12.2021Designation fee(s) paid 
10.12.2021Examination fee paid 
Examination procedure10.12.2021Examination requested  [2022/16]
10.12.2021Date on which the examining division has become responsible
06.02.2023Communication of intention to grant the patent
01.06.2023Fee for grant paid
01.06.2023Fee for publishing/printing paid
01.06.2023Receipt of the translation of the claim(s)
Opposition(s)15.04.2024No opposition filed within time limit [2024/25]
Fees paidRenewal fee
13.05.2022Renewal fee patent year 03
10.05.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ12.07.2023
ES12.07.2023
HR12.07.2023
PL12.07.2023
RO12.07.2023
RS12.07.2023
SK12.07.2023
SM12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
[2024/23]
Former [2024/20]ES12.07.2023
HR12.07.2023
PL12.07.2023
RS12.07.2023
SM12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
Former [2024/10]ES12.07.2023
HR12.07.2023
PL12.07.2023
RS12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
Former [2024/09]ES12.07.2023
NO12.10.2023
GR13.10.2023
IS12.11.2023
Former [2024/08]NO12.10.2023
GR13.10.2023
Cited inInternational search[A]US372148  (G. HENDERSON) [A] 1,4,5,7 * figures 1,2 * * page 2, lines 13-24 * * page 1, lines 90-98 *;
 [A]US2011156392  (THACKER II ANDREW CARLTON [US]) [A] 1 * figures 4,5,7A * * paragraphs [0052] , [0053] *;
 [A]US2012306205  (COSBY MARK RYDELL [US], et al) [A] 1 * figures 5,6 ** paragraph [0042] *;
 [A]EP2775140  (NAKAMURA TAKUJU [JP]) [A] 1 * figures 1,2 * * paragraphs [0019] , [0074] , [0076] *;
 [A]US2015211482  (RADISEK THEODORE [US]) [A] 1-10 * figures 3-7 * * paragraph [0046] *
by applicantUS4630996
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.