| EP3996889 - METHOD FOR PRODUCING A PART FROM COMPOSITE MATERIAL BY INJECTING A FILLED SLIP INTO A FIBROUS TEXTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.11.2024 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 08.12.2023 | ||
| Former | Grant of patent is intended Status updated on 07.11.2023 | ||
| Former | Request for examination was made Status updated on 15.04.2022 | ||
| Former | The international publication has been made Status updated on 18.01.2021 | ||
| Former | unknown Status updated on 04.08.2020 | Most recent event Tooltip | 13.03.2026 | Lapse of the patent in a contracting state New state(s): HU | published on 15.04.2026 [2026/16] | Applicant(s) | For all designated states SAFRAN AIRCRAFT ENGINES 2 boulevard du Général Martial Valin 75015 Paris / FR | [2022/19] | Inventor(s) | 01 /
DROZ, Nicolas c/o SAFRAN CEPI Rond-point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | 02 /
IGLESIAS CANO, Célia c/o SAFRAN CEPI Rond-point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | 03 /
LE BIEZ, Philippe Charles Alain c/o SAFRAN CEPI Rond-point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | 04 /
LIAIS, Ludovic Philippe c/o SAFRAN CEPI Rond-point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | [2023/49] |
| Former [2022/19] | 01 /
DROZ, Nicolas c/o SAFRAN CEPI Rond-point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | ||
| 02 /
IGLESIAS CANO, Célia c/o SAFRAN CEPI Rond-point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | |||
| 03 /
LE BIEZ, Philippe, Charles, Alain c/o SAFRAN CEPI Rond-point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | |||
| 04 /
LIAIS, Ludovic, Philippe c/o SAFRAN CEPI Rond-point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | Representative(s) | Cabinet Beau de Loménie 103, rue de Grenelle 75340 Paris Cedex 07 / FR | [N/P] |
| Former [2022/19] | Cabinet Beau de Loménie 158, rue de l'Université 75340 Paris Cedex 07 / FR | Application number, filing date | 20746253.2 | 30.06.2020 | [2022/20] | WO2020FR51139 | Priority number, date | FR20190007815 | 11.07.2019 Original published format: FR 1907815 | FR20190007816 | 11.07.2019 Original published format: FR 1907816 | [2022/19] | Filing language | FR | Procedural language | FR | Publication | Type: | A2 Application without search report | No.: | WO2021005282 | Date: | 14.01.2021 | Language: | FR | [2021/02] | Type: | A2 Application without search report | No.: | EP3996889 | Date: | 18.05.2022 | Language: | FR | The application published by WIPO in one of the EPO official languages on 14.01.2021 takes the place of the publication of the European patent application. | [2022/20] | Type: | B1 Patent specification | No.: | EP3996889 | Date: | 10.01.2024 | Language: | FR | [2024/02] | Search report(s) | International search report - published on: | EP | 25.03.2021 | Classification | IPC: | B28B1/24, B28B1/26, B28B7/34, B28B11/24, B28B23/00, C04B35/80, C04B41/00, C04B35/00 | [2022/19] | CPC: |
B28B1/24 (EP,US);
B28B1/26 (CN);
B28B1/261 (US);
B28B1/262 (EP,CN);
B28B11/243 (EP,CN);
B28B13/06 (CN);
B28B23/0006 (EP);
B28B7/342 (EP);
B28B7/348 (EP);
C04B35/117 (EP);
C04B35/14 (EP);
C04B35/18 (EP);
C04B35/185 (EP);
C04B35/447 (EP);
C04B35/565 (EP);
C04B35/58071 (EP);
C04B35/584 (EP);
C04B35/6263 (EP);
C04B35/62844 (US);
C04B35/62892 (US);
C04B35/638 (EP,CN);
C04B35/64 (CN,US);
C04B35/66 (CN);
C04B35/80 (EP,CN,US);
C04B41/0072 (EP);
C04B2235/5216 (CN);
C04B2235/5224 (EP);
C04B2235/5228 (EP);
C04B2235/5232 (EP);
C04B2235/5244 (EP);
C04B2235/5248 (EP);
C04B2235/5252 (EP,CN,US);
C04B2235/5256 (CN);
C04B2235/6022 (EP,US);
C04B2235/6027 (US);
C04B2235/606 (EP);
C04B2235/616 (EP,US);
C04B2235/6562 (EP,CN,US);
C04B2235/6567 (EP,CN,US);
C04B2235/661 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES TEILS AUS EINEM VERBUNDMATERIAL DURCH INJEKTION EINER GEFÜLLTEN SCHLÄMME IN EINE FASERIGE TEXTUR | [2022/19] | English: | METHOD FOR PRODUCING A PART FROM COMPOSITE MATERIAL BY INJECTING A FILLED SLIP INTO A FIBROUS TEXTURE | [2022/19] | French: | PROCEDE DE FABRICATION D'UNE PIECE EN MATERIAU COMPOSITE PAR INJECTION D'UNE BARBOTINE CHARGEE DANS UNE TEXTURE FIBREUSE | [2022/19] | Entry into regional phase | 03.02.2022 | National basic fee paid | 03.02.2022 | Designation fee(s) paid | 03.02.2022 | Examination fee paid | Examination procedure | 03.02.2022 | Amendment by applicant (claims and/or description) | 03.02.2022 | Examination requested [2022/20] | 03.02.2022 | Date on which the examining division has become responsible | 08.11.2023 | Communication of intention to grant the patent | 01.12.2023 | Fee for grant paid | 01.12.2023 | Fee for publishing/printing paid | 01.12.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 11.10.2024 | No opposition filed within time limit [2024/51] | Fees paid | Renewal fee | 21.06.2022 | Renewal fee patent year 03 | 20.06.2023 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 30.06.2020 | HU | 30.06.2020 | AT | 10.01.2024 | BG | 10.01.2024 | CZ | 10.01.2024 | DK | 10.01.2024 | EE | 10.01.2024 | ES | 10.01.2024 | FI | 10.01.2024 | HR | 10.01.2024 | IT | 10.01.2024 | LT | 10.01.2024 | LV | 10.01.2024 | MC | 10.01.2024 | NL | 10.01.2024 | PL | 10.01.2024 | RO | 10.01.2024 | SE | 10.01.2024 | SI | 10.01.2024 | SK | 10.01.2024 | SM | 10.01.2024 | NO | 10.04.2024 | RS | 10.04.2024 | GR | 11.04.2024 | IS | 10.05.2024 | PT | 10.05.2024 | BE | 30.06.2024 | CH | 30.06.2024 | IE | 30.06.2024 | LU | 30.06.2024 | [2026/16] |
| Former [2025/51] | CY | 30.06.2020 | |
| AT | 10.01.2024 | ||
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| FI | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SI | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| IE | 30.06.2024 | ||
| LU | 30.06.2024 | ||
| Former [2025/45] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| FI | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SI | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| IE | 30.06.2024 | ||
| LU | 30.06.2024 | ||
| Former [2025/22] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SI | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| IE | 30.06.2024 | ||
| LU | 30.06.2024 | ||
| Former [2025/13] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| LU | 30.06.2024 | ||
| Former [2025/11] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2025/02] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/49] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/48] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/47] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/37] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/36] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/35] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| Former [2024/34] | BG | 10.01.2024 | |
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| Former [2024/33] | LT | 10.01.2024 | |
| NL | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| IS | 10.05.2024 | ||
| Former [2024/32] | NL | 10.01.2024 | |
| IS | 10.05.2024 | ||
| Former [2024/31] | NL | 10.01.2024 | Cited in | International search | [XAYI] JPH01210306 (SINTOKOGIO LTD et al.) | [XAYI] WO2017060601 (SAFRAN AIRCRAFT ENGINES et al.) [X] 1,7 * the whole document *[A] 4,9-11 [Y] 2,8 [I] 5,6 | [YD] WO2017187050 (SAFRAN et al.) [YD] 2 * figures 1-3 * * claim 1 * | [Y] FR3041631 (SNECMA et al.) [Y] 8 * page 12, lines 1-29 * * page 17, lines 21-27 * | [A] US2005058541 (LE BIEZ PHILIPPE et al.) [A] 3 * page 3, lines 7-22 * | [A] CN104760118 (NO 725 RES INST CHINA CSIC et al.) [A] 3 * figures 1-5 * * paragraphs [0051] , [0070] * | by applicant | WO2017060601 |