blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3813146

EP3813146 - PACKAGING HOUSING AND BATTERY PACK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.07.2024
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  11.08.2023
FormerGrant of patent is intended
Status updated on  30.03.2023
FormerRequest for examination was made
Status updated on  26.03.2021
FormerThe international publication has been made
Status updated on  11.09.2020
Most recent event   Tooltip19.07.2024No opposition filed within time limitpublished on 21.08.2024  [2024/34]
Applicant(s)For all designated states
Ningde Amperex Technology Ltd.
No.1 Xingang Road
Zhangwan Town
Jiaocheng District
Ningde, Fujian 350900 / CN
[2021/17]
Inventor(s)01 / JIA, Zhuocheng
No.1 Xingang Road, Zhangwan Town, Jiaocheng
District
Ningde, Fujian 350900 / CN
02 / HUANG, Kanzhu
No.1 Xingang Road, Zhangwan Town, Jiaocheng
District
Ningde, Fujian 350900 / CN
 [2021/17]
Representative(s)Klunker IP Patentanwälte PartG mbB
Destouchesstraße 68
80796 München / DE
[2021/17]
Application number, filing date20766914.428.02.2020
[2021/17]
WO2020CN77289
Priority number, dateCN20191016096704.03.2019         Original published format: CN201910160967
[2021/17]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020177641
Date:10.09.2020
Language:ZH
[2020/37]
Type: A1 Application with search report 
No.:EP3813146
Date:28.04.2021
Language:EN
[2021/17]
Type: B1 Patent specification 
No.:EP3813146
Date:13.09.2023
Language:EN
[2023/37]
Search report(s)International search report - published on:CN10.09.2020
(Supplementary) European search report - dispatched on:EP13.05.2022
ClassificationIPC:H01M50/258, H01M50/264, H01M50/271
[2022/24]
CPC:
H01M10/0525 (EP,US); H01M10/613 (CN); H01M10/04 (EP,US);
H01M10/4207 (US); H01M10/6555 (CN); H01M50/209 (EP,CN,US);
H01M50/258 (EP); H01M50/264 (EP); H01M50/271 (EP);
Y02E60/10 (EP); Y02P70/50 (EP) (-)
Former IPC [2021/17]H01M2/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/17]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERKAPSELUNGSGEHÄUSE UND BATTERIEPACK[2021/17]
English:PACKAGING HOUSING AND BATTERY PACK[2021/17]
French:BOÎTIER DE CONDITIONNEMENT ET BLOC-BATTERIE[2021/17]
Entry into regional phase22.01.2021Translation filed 
22.01.2021National basic fee paid 
22.01.2021Search fee paid 
22.01.2021Designation fee(s) paid 
22.01.2021Examination fee paid 
Examination procedure22.01.2021Examination requested  [2021/17]
04.08.2022Amendment by applicant (claims and/or description)
31.03.2023Communication of intention to grant the patent
07.08.2023Fee for grant paid
07.08.2023Fee for publishing/printing paid
07.08.2023Receipt of the translation of the claim(s)
Opposition(s)14.06.2024No opposition filed within time limit [2024/34]
Fees paidRenewal fee
24.02.2022Renewal fee patent year 03
23.02.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT13.09.2023
CZ13.09.2023
DK13.09.2023
EE13.09.2023
ES13.09.2023
FI13.09.2023
HR13.09.2023
IT13.09.2023
LT13.09.2023
LV13.09.2023
PL13.09.2023
RO13.09.2023
RS13.09.2023
SE13.09.2023
SK13.09.2023
SM13.09.2023
NO13.12.2023
GR14.12.2023
IS13.01.2024
PT15.01.2024
[2024/33]
Former [2024/26]AT13.09.2023
CZ13.09.2023
EE13.09.2023
ES13.09.2023
FI13.09.2023
HR13.09.2023
IT13.09.2023
LT13.09.2023
LV13.09.2023
PL13.09.2023
RO13.09.2023
RS13.09.2023
SE13.09.2023
SK13.09.2023
SM13.09.2023
NO13.12.2023
GR14.12.2023
IS13.01.2024
PT15.01.2024
Former [2024/23]AT13.09.2023
CZ13.09.2023
EE13.09.2023
ES13.09.2023
FI13.09.2023
HR13.09.2023
LT13.09.2023
LV13.09.2023
RO13.09.2023
RS13.09.2023
SE13.09.2023
SK13.09.2023
SM13.09.2023
NO13.12.2023
GR14.12.2023
IS13.01.2024
PT15.01.2024
Former [2024/20]FI13.09.2023
HR13.09.2023
LT13.09.2023
LV13.09.2023
RS13.09.2023
SE13.09.2023
SM13.09.2023
NO13.12.2023
GR14.12.2023
IS13.01.2024
Former [2024/10]FI13.09.2023
HR13.09.2023
LT13.09.2023
LV13.09.2023
RS13.09.2023
SE13.09.2023
NO13.12.2023
GR14.12.2023
Former [2024/09]FI13.09.2023
LT13.09.2023
SE13.09.2023
NO13.12.2023
GR14.12.2023
Former [2024/08]LT13.09.2023
NO13.12.2023
GR14.12.2023
Documents cited:Search[X]KR20170056306  (LG CHEMICAL LTD [KR]) [X] 1,2,4,5,15 * figures 11,12 *;
 [A]US2017214012  (BENEDICT SCOTT [US], et al) [A] 1-15* figures 2,5 *;
 [XA]EP3285311  (LG CHEMICAL LTD [KR]) [X] 1-4,15 * figure 2 * [A] 5-14;
 [A]WO2018042763  (SANYO ELECTRIC CO [JP]) [A] 1-15 * figure 1 *;
 [A]US2018138473  (BESSHO TOSHIHIKO [JP], et al) [A] 1-15 * figure 11 *;
 [A]WO2019039139  (SANYO ELECTRIC CO [JP]) [A] 1-15 * figure 1 *
International search[X]CN206639822U  (SHENZHEN OPTIMUM BATTERY CO) [X] 1-5, 12 * description, paragraphs 0024-0035, and figure 1 *;
 [A]CN206806385U  (DISIDA NEW ENERGY SHANGHAI CO LTD) [A] 1-12 * entire document *;
 [A]WO2018034471  (MPS KOREA CO LTD [KR]) [A] 1-12* entire document *;
 [A]CN107732063  (JIANGSU YINJI ENCARBON ENERGY TECH CO LTD) [A] 1-12 * entire document *;
 [A]CN207743294U  (NINGDE CONTEMPORARY AMPEREX TECH CO LTD) [A] 1-12 * entire document *;
 [A]CN207818694U  (NINGDE CONTEMPORARY AMPEREX TECH CO LTD) [A] 1-12 * entire document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.