blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3950175

EP3950175 - BONDING MATERIAL AND BONDED STRUCTURE [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  18.08.2023
Database last updated on 13.09.2024
FormerRequest for examination was made
Status updated on  07.01.2022
FormerThe international publication has been made
Status updated on  09.10.2020
Most recent event   Tooltip15.07.2024New entry: Reply to examination report 
Applicant(s)For all designated states
Mitsui Mining & Smelting Co., Ltd.
1-11-1, Osaki
Shinagawa-ku
Tokyo 141-8584 / JP
[2022/06]
Inventor(s)01 / ANAI, Kei
c/o Mitsui Mining & Smelting Co., Ltd.,
1333-2, Haraichi
Ageo-shi, Saitama 362-0021 / JP
02 / JO, Jung-Lae
c/o Mitsui Mining & Smelting Co., Ltd.,
1333-2, Haraichi
Ageo-shi, Saitama 362-0021 / JP
[N/P]
Former [2022/06]01 / ANAI, Kei
Ageo-shi, Saitama 362-0021 / JP
02 / JO, Jung-Lae
Ageo-shi, Saitama 362-0021 / JP
Representative(s)Novagraaf Technologies
Bâtiment O2
2, rue Sarah Bernhardt
CS90017
92665 Asnières-sur-Seine Cedex / FR
[2022/06]
Application number, filing date20783002.702.03.2020
[2022/06]
WO2020JP08654
Priority number, dateJP2019006828929.03.2019         Original published format: JP 2019068289
[2022/06]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020202971
Date:08.10.2020
Language:JA
[2020/41]
Type: A1 Application with search report 
No.:EP3950175
Date:09.02.2022
Language:EN
[2022/06]
Search report(s)International search report - published on:JP08.10.2020
(Supplementary) European search report - dispatched on:EP08.12.2021
ClassificationIPC:B22F1/00, B22F7/08, B22F7/00, B22F7/06
[2022/06]
CPC:
B22F7/08 (EP,KR,US); B22F1/052 (EP,KR,US); B22F1/054 (EP,KR,US);
B22F1/0551 (EP,KR,US); B22F1/056 (EP,KR,US); B22F1/068 (EP,KR,US);
B22F1/107 (EP,KR,US); B22F1/147 (EP,KR,US); B22F7/008 (EP);
B22F7/064 (EP); B23K35/0238 (US); B23K35/302 (US);
B32B15/01 (US); C22C1/0425 (KR); H01L23/14 (KR);
H01L24/29 (US); H01L24/45 (US); H01R4/02 (KR);
B22F2007/042 (KR); B22F2301/10 (US); B22F2999/00 (EP);
H01L2224/29124 (US); H01L2224/29139 (US); H01L2224/29144 (US);
H01L2224/29147 (US); H01L2224/29155 (US); H01L2224/45147 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/06]
TitleGerman:VERBINDUNGSMATERIAL UND VERBUNDENE STRUKTUR[2022/06]
English:BONDING MATERIAL AND BONDED STRUCTURE[2022/06]
French:MATÉRIAU DE LIAISON, ET STRUCTURE DE LIAISON[2022/06]
Entry into regional phase08.09.2021Translation filed 
08.09.2021National basic fee paid 
08.09.2021Search fee paid 
08.09.2021Designation fee(s) paid 
08.09.2021Examination fee paid 
Examination procedure08.09.2021Examination requested  [2022/06]
27.06.2022Amendment by applicant (claims and/or description)
18.08.2023Invitation to indicate the basis for amendments (Time limit: M01)
13.09.2023Reply to an invitation to indicate the basis for amendments
03.01.2024Despatch of a communication from the examining division (Time limit: M04)
12.04.2024Reply to a communication from the examining division
25.04.2024Despatch of a communication from the examining division (Time limit: M04)
11.07.2024Reply to a communication from the examining division
Fees paidRenewal fee
23.03.2022Renewal fee patent year 03
22.03.2023Renewal fee patent year 04
22.03.2024Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]JP2015076232  (TOYO BOSEKI);
 [X]JP2015090900  (FURUKAWA ELECTRIC CO LTD);
 [XI]US2018269074  (KAMIKORIYAMA YOICHI [JP], et al);
 [E]EP3834965  (MITSUI MINING & SMELTING CO [JP])
International search[X]JP2013209720  (FURUKAWA ELECTRIC CO LTD);
 [X]JP2015090900  (FURUKAWA ELECTRIC CO LTD);
 [A]WO2015068853  (NIPPON STEEL & SUMITOMO METAL CORP [JP], et al);
 [A]WO2017221613  (NITTO DENKO CORP [JP]);
 [X]JP2018501657
by applicantUS2014225247
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.