EP4018070 - SUBSEA UMBILICALS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.08.2024 Database last updated on 18.01.2025 | |
Former | The patent has been granted Status updated on 01.09.2023 | ||
Former | Grant of patent is intended Status updated on 08.06.2023 | ||
Former | Request for examination was made Status updated on 02.05.2023 | ||
Former | Grant of patent is intended Status updated on 20.12.2022 | ||
Former | Request for examination was made Status updated on 27.05.2022 | ||
Former | The international publication has been made Status updated on 26.02.2021 | ||
Former | unknown Status updated on 12.10.2020 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states Subsea 7 Limited 40 Brighton Road Sutton, Surrey SM2 5BN / GB | [2022/26] | Inventor(s) | 01 /
PLENDERLEITH, Andrew Campbell 10 Summer Brae Newmachar Aberdeen AB21 0PQ / GB | [2022/26] | Representative(s) | Keltie LLP No. 1 London Bridge London SE1 9BA / GB | [2022/26] | Application number, filing date | 20785555.2 | 19.08.2020 | [2022/26] | WO2020GB51985 | Priority number, date | GB20190012019 | 21.08.2019 Original published format: GB 201912019 | [2022/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2021032976 | Date: | 25.02.2021 | Language: | EN | [2021/08] | Type: | A1 Application with search report | No.: | EP4018070 | Date: | 29.06.2022 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.02.2021 takes the place of the publication of the European patent application. | [2022/26] | Type: | B1 Patent specification | No.: | EP4018070 | Date: | 04.10.2023 | Language: | EN | [2023/40] | Search report(s) | International search report - published on: | EP | 25.02.2021 | Classification | IPC: | E21B17/18, E21B17/20, F16L3/23, F16L11/22, H02G3/22, E21B41/00, E21B43/013 | [2022/26] | CPC: |
E21B17/18 (EP,US);
E21B17/20 (GB);
E21B17/203 (EP);
E21B41/0007 (EP);
E21B43/01 (GB);
E21B43/013 (EP,US);
F16L11/22 (EP,GB);
F16L3/22 (US);
F16L3/2235 (EP);
H01B7/14 (GB);
H02G1/10 (EP);
H02G3/32 (EP);
H02G9/12 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | UNTERWASSERVERSORGUNSKABEL | [2022/26] | English: | SUBSEA UMBILICALS | [2022/26] | French: | CÂBLES OMBILICAUX SOUS-MARINS | [2022/26] | Entry into regional phase | 18.03.2022 | National basic fee paid | 18.03.2022 | Designation fee(s) paid | 18.03.2022 | Examination fee paid | Examination procedure | 21.06.2021 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 18.03.2022 | Examination requested [2022/26] | 18.03.2022 | Date on which the examining division has become responsible | 05.10.2022 | Amendment by applicant (claims and/or description) | 21.12.2022 | Communication of intention to grant the patent | 28.04.2023 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 09.06.2023 | Communication of intention to grant the patent | 21.08.2023 | Fee for grant paid | 21.08.2023 | Fee for publishing/printing paid | 21.08.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 05.07.2024 | No opposition filed within time limit [2024/37] | Fees paid | Renewal fee | 31.08.2022 | Renewal fee patent year 03 | 29.08.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 04.10.2023 | CZ | 04.10.2023 | DK | 04.10.2023 | EE | 04.10.2023 | ES | 04.10.2023 | HR | 04.10.2023 | LT | 04.10.2023 | LV | 04.10.2023 | NL | 04.10.2023 | PL | 04.10.2023 | RO | 04.10.2023 | RS | 04.10.2023 | SE | 04.10.2023 | SI | 04.10.2023 | SK | 04.10.2023 | SM | 04.10.2023 | BG | 04.01.2024 | GR | 05.01.2024 | IS | 04.02.2024 | PT | 05.02.2024 | [2024/49] |
Former [2024/36] | AT | 04.10.2023 | |
CZ | 04.10.2023 | ||
DK | 04.10.2023 | ||
EE | 04.10.2023 | ||
ES | 04.10.2023 | ||
HR | 04.10.2023 | ||
LT | 04.10.2023 | ||
LV | 04.10.2023 | ||
NL | 04.10.2023 | ||
PL | 04.10.2023 | ||
RO | 04.10.2023 | ||
RS | 04.10.2023 | ||
SE | 04.10.2023 | ||
SK | 04.10.2023 | ||
SM | 04.10.2023 | ||
BG | 04.01.2024 | ||
GR | 05.01.2024 | ||
IS | 04.02.2024 | ||
PT | 05.02.2024 | ||
Former [2024/35] | AT | 04.10.2023 | |
CZ | 04.10.2023 | ||
DK | 04.10.2023 | ||
EE | 04.10.2023 | ||
ES | 04.10.2023 | ||
HR | 04.10.2023 | ||
LT | 04.10.2023 | ||
LV | 04.10.2023 | ||
NL | 04.10.2023 | ||
PL | 04.10.2023 | ||
RO | 04.10.2023 | ||
RS | 04.10.2023 | ||
SE | 04.10.2023 | ||
SM | 04.10.2023 | ||
BG | 04.01.2024 | ||
GR | 05.01.2024 | ||
IS | 04.02.2024 | ||
PT | 05.02.2024 | ||
Former [2024/34] | AT | 04.10.2023 | |
DK | 04.10.2023 | ||
EE | 04.10.2023 | ||
ES | 04.10.2023 | ||
HR | 04.10.2023 | ||
LT | 04.10.2023 | ||
LV | 04.10.2023 | ||
NL | 04.10.2023 | ||
PL | 04.10.2023 | ||
RS | 04.10.2023 | ||
SE | 04.10.2023 | ||
SM | 04.10.2023 | ||
BG | 04.01.2024 | ||
GR | 05.01.2024 | ||
IS | 04.02.2024 | ||
PT | 05.02.2024 | ||
Former [2024/33] | AT | 04.10.2023 | |
DK | 04.10.2023 | ||
ES | 04.10.2023 | ||
HR | 04.10.2023 | ||
LT | 04.10.2023 | ||
LV | 04.10.2023 | ||
NL | 04.10.2023 | ||
PL | 04.10.2023 | ||
RS | 04.10.2023 | ||
SE | 04.10.2023 | ||
SM | 04.10.2023 | ||
BG | 04.01.2024 | ||
GR | 05.01.2024 | ||
IS | 04.02.2024 | ||
PT | 05.02.2024 | ||
Former [2024/26] | AT | 04.10.2023 | |
ES | 04.10.2023 | ||
HR | 04.10.2023 | ||
LT | 04.10.2023 | ||
LV | 04.10.2023 | ||
NL | 04.10.2023 | ||
PL | 04.10.2023 | ||
RS | 04.10.2023 | ||
SE | 04.10.2023 | ||
BG | 04.01.2024 | ||
GR | 05.01.2024 | ||
IS | 04.02.2024 | ||
PT | 05.02.2024 | ||
Former [2024/23] | AT | 04.10.2023 | |
ES | 04.10.2023 | ||
LT | 04.10.2023 | ||
NL | 04.10.2023 | ||
BG | 04.01.2024 | ||
GR | 05.01.2024 | ||
IS | 04.02.2024 | ||
PT | 05.02.2024 | ||
Former [2024/21] | LT | 04.10.2023 | |
NL | 04.10.2023 | ||
BG | 04.01.2024 | ||
GR | 05.01.2024 | ||
IS | 04.02.2024 | ||
Former [2024/20] | NL | 04.10.2023 | |
GR | 05.01.2024 | ||
IS | 04.02.2024 | ||
Former [2024/17] | NL | 04.10.2023 | Cited in | International search | [X]JPS4971489 (-) [X] 1,9,17,21,22* the whole document *; | [X]US2008279635 (MCCOY DONALD P [US]) [X] 1,9,17,21,22 * paragraph [0028]; figures 5,6,7 *; | [Y]CA2895371 (SUBSEA 7 NORWAY AS [NO]) [Y] 4,5 * figure 7; claim 1 *; | [XYI]GB2531601 (SUBSEA 7 LTD [GB]) [X] 1,6,9-11,17-31 * page 9, line 18 - page 13, line 6; figures 1-6 * [Y] 4,5 [I] 2,3,7,8,12-16; | [X]WO2017209617 (LOS ELEKTRO AS [NO]) [X] 1,9,17,21,22 * page 5, line 14 - page 7, line 22; figures 1,3,4 *; | [X]GB2554873 (BALFOUR BEATTY PLC [GB]) [X] 1,9,17,21,22 * page 7, line 1 - page 8, line 20; figures 1a,1b * | by applicant | US6901968 | US7239781 | WO2008132416 | WO2011045582 | WO2013128279 | WO2016116333 |