blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3955202

EP3955202 - EQUIPMENT, SYSTEM AND METHOD FOR OPTIMALLY MANAGING ENERGY IN A NETWORK FOR DOMESTIC AND INDUSTRIAL USE [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  14.01.2022
Database last updated on 03.09.2024
FormerThe international publication has been made
Status updated on  16.10.2020
Most recent event   Tooltip13.03.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Universidad Adolfo Ibañez
Av. Diagonal Las Torres 2700
Peñalolen
Santiago / CL
[2022/07]
Inventor(s)01 / CARRASCO SCHMIDT, Rodrigo
Hermanos Cabot 7393
Las Condes, Santiago / CL
 [2022/07]
Representative(s)De Vidal Gonzalez, Maria Ester
Bird & Bird International LLP
Paseo de la Castellana 7, 7º Planta
28046 Madrid / ES
[2022/07]
Application number, filing date20788010.526.03.2020
[2022/07]
WO2020CL50029
Priority number, dateCL20192019093808.04.2019         Original published format: CL 20190938
[2022/07]
Filing languageES
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020206565
Date:15.10.2020
Language:ES
[2020/42]
Type: A1 Application with search report 
No.:EP3955202
Date:16.02.2022
Language:EN
[2022/07]
Search report(s)International search report - published on:CL15.10.2020
(Supplementary) European search report - dispatched on:EP16.05.2023
ClassificationIPC:G06Q50/06, H02J13/00, H02J3/00, H02J3/32, H02J3/38
[2023/24]
CPC:
H02J3/32 (EP); G05B19/042 (US); H02J13/00002 (EP);
H02J3/003 (EP); H02J3/004 (EP); H02J3/381 (EP);
G05B2219/2639 (US); H02J2203/20 (EP); H02J2300/24 (EP);
H02J2310/12 (EP); Y02B10/10 (EP); Y02E60/00 (EP);
Y02P80/20 (EP); Y04S40/20 (EP) (-)
Former IPC [2022/07]G06Q50/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/07]
TitleGerman:VORRICHTUNG, SYSTEM UND VERFAHREN ZUR OPTIMALEN ENERGIEVERWALTUNG IN EINEM NETZWERK FÜR HEIM- UND INDUSTRIEANWENDUNGEN[2022/07]
English:EQUIPMENT, SYSTEM AND METHOD FOR OPTIMALLY MANAGING ENERGY IN A NETWORK FOR DOMESTIC AND INDUSTRIAL USE[2022/07]
French:ÉQUIPEMENT, SYSTÈME ET PROCÉDÉ POUR FOURNIR DE MANIÈRE OPTIMALE DE L'ÉNERGIE DANS UN RÉSEAU À USAGE À DOMICILE ET INDUSTRIEL[2022/07]
Entry into regional phase25.10.2021Translation filed 
25.10.2021National basic fee paid 
25.10.2021Search fee paid 
25.10.2021Designation fee(s) paid 
25.10.2021Examination fee paid 
Examination procedure25.10.2021Examination requested  [2022/07]
05.12.2023Amendment by applicant (claims and/or description)
Fees paidRenewal fee
18.03.2022Renewal fee patent year 03
04.01.2023Renewal fee patent year 04
13.03.2024Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]WO2018055594  (ABB SCHWEIZ AG [CH]) [X] 1* paragraphs [0013] , [0031] , [0042] *;
 [X]US2018226800  (BHATTARAI BISHNU P [US], et al) [X] 1-20 * paragraphs [0004] , [0014] , [0028] , [0039] - [0041] - [0043] - [0046] - [0053]; figure 1 *
International search[Y]JP5278462B  (PANASONIC CORP) [Y] 6 * . Parrafos [003], [018], [032]-[034], [039], [040], [043], [061]; cláusula 1. *;
 JP5278462B  [ ];
 [Y]US9772643  (STEVEN ALAIN P [US], et al) [Y] 12-21 * . Col. 5, 7, 8, 25, 26, 28, 31-36, 41, 42, 47, 52-56, 57, 61; figs. 11, 12; cláusulas 1, 7, 22; ec. 17. *;
 [Y]US2018054070  (KRISHNAMOORTHY SUDARSHAN [US], et al) [Y] 6 * . Parrafos [053], [075], [076], [090], [091]; figs. 2, 3, 9. *;
 [A]WO2019005412  (MERIT SI LLC [US]) [A] * 03 ENERO 2019 [028], [031], [034], [042], [043], [047]; fig. 6; cláusula 1. *;
 [XY]US10223656  (KOPP PHILLIP [US]) [X] 1-5, 7, 8, 10 * . Col. 2, 6, 8, 9, 11, 12-14, 16, 19-24; fig. 2. * [Y] 6, 12-21
by applicantUS2006027638
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.