EP3995482 - DIESTER-BASED MATERIAL PRODUCTION UNIT AND DIESTER-BASED MATERIAL PRODUCTION SYSTEM INCLUDING THE SAME [Right-click to bookmark this link] | |||
Former [2022/19] | UNIT FOR PREPARING DIESTER-BASED MATERIAL, AND SYSTEM FOR PREPARING DIESTER-BASED MATERIAL, COMPRISING SAME | ||
[2023/09] | Status | No opposition filed within time limit Status updated on 23.02.2024 Database last updated on 28.06.2024 | |
Former | The patent has been granted Status updated on 17.03.2023 | ||
Former | Grant of patent is intended Status updated on 15.02.2023 | ||
Former | Request for examination was made Status updated on 08.04.2022 | ||
Former | The international publication has been made Status updated on 15.01.2021 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): BE, CH, IT, SI | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states LG CHEM, LTD. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2022/19] | Inventor(s) | 01 /
JEONG, Jae Hun LG Chem Research Park, 188, Munji-ro Yuseong-gu Daejeon 34122 / KR | 02 /
LEE, Sung Kyu LG Chem Research Park, 188, Munji-ro Yuseong-gu Daejeon 34122 / KR | 03 /
CHOO, Yeon Uk LG Chem Research Park, 188, Munji-ro Yuseong-gu Daejeon 34122 / KR | 04 /
LEE, Seok Goo LG Chem Research Park, 188, Munji-ro Yuseong-gu Daejeon 34122 / KR | [2022/19] | Representative(s) | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2022/19] | Application number, filing date | 20834700.5 | 02.07.2020 | [2022/19] | WO2020KR08674 | Priority number, date | KR20190080462 | 04.07.2019 Original published format: KR 20190080462 | [2022/19] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2021002705 | Date: | 07.01.2021 | Language: | KO | [2021/01] | Type: | A1 Application with search report | No.: | EP3995482 | Date: | 11.05.2022 | Language: | EN | [2022/19] | Type: | B1 Patent specification | No.: | EP3995482 | Date: | 19.04.2023 | Language: | EN | [2023/16] | Search report(s) | International search report - published on: | KR | 07.01.2021 | (Supplementary) European search report - dispatched on: | EP | 08.08.2022 | Classification | IPC: | C07C67/08, C07C67/52, C07C67/03, C07C69/82, B01D3/00, B01D3/06 | [2022/36] | CPC: |
C07C67/08 (EP,CN,KR,US);
C07C67/03 (CN,KR);
B01D17/0214 (US);
B01D19/0036 (US);
B01D3/009 (EP);
B01D3/06 (EP);
B01J19/0013 (US);
B01J19/245 (US);
B01J19/2465 (US);
C07C67/475 (US);
C07C67/48 (CN);
C07C67/52 (EP,CN,KR,US);
C07C67/58 (CN);
C07C69/82 (KR,US);
B01J2219/00033 (KR,US);
B01J2219/0004 (KR);
B01J2219/00087 (US);
B01J2219/00108 (US);
B01J2219/00306 (KR);
B01J2219/00495 (KR);
C07C2601/14 (CN);
| C-Set: |
C07C67/03, C07C69/75 (CN);
C07C67/03, C07C69/80 (CN);
C07C67/08, C07C69/75 (CN);
C07C67/08, C07C69/80 (CN);
C07C67/08, C07C69/82 (US,EP);
C07C67/48, C07C69/75 (CN);
C07C67/48, C07C69/80 (CN);
C07C67/52, C07C69/75 (CN);
C07C67/52, C07C69/80 (CN);
C07C67/52, C07C69/82 (EP); |
Former IPC [2022/19] | C07C67/08, C07C67/52, C07C67/03, C07C69/82 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | PRODUKTIONSEINHEIT FÜR DIESTERBASIERTE MATERIALIEN UND PRODUKTIONSSYSTEM FÜR DIESTERBASIERTE MATERIALIEN EINSCHLIESSLICH DERSELBEN | [2023/09] | English: | DIESTER-BASED MATERIAL PRODUCTION UNIT AND DIESTER-BASED MATERIAL PRODUCTION SYSTEM INCLUDING THE SAME | [2023/09] | French: | UNITÉ DE PRODUCTION DE MATÉRIAUX À BASE DE DIESTER ET SYSTÈME DE PRODUCTION DE MATÉRIAUX À BASE DE DIESTER LE COMPRENANT | [2023/09] |
Former [2022/19] | EINHEIT ZUR HERSTELLUNG VON DIESTERBASIERTEM MATERIAL UND SYSTEM ZUR HERSTELLUNG VON DIESTERBASIERTEM MATERIAL DAMIT | ||
Former [2022/19] | UNIT FOR PREPARING DIESTER-BASED MATERIAL, AND SYSTEM FOR PREPARING DIESTER-BASED MATERIAL, COMPRISING SAME | ||
Former [2022/19] | UNITÉ DE PRÉPARATION D'UN MATÉRIAU À BASE DE DIESTER, ET SYSTÈME DE PRÉPARATION D'UN MATÉRIAU À BASE DE DIESTER LA COMPRENANT | Entry into regional phase | 13.10.2021 | Translation filed | 13.10.2021 | National basic fee paid | 13.10.2021 | Search fee paid | 13.10.2021 | Designation fee(s) paid | 13.10.2021 | Examination fee paid | Examination procedure | 13.10.2021 | Examination requested [2022/19] | 12.09.2022 | Date on which the examining division has become responsible | 16.02.2023 | Communication of intention to grant the patent | 09.03.2023 | Fee for grant paid | 09.03.2023 | Fee for publishing/printing paid | 09.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 22.01.2024 | No opposition filed within time limit [2024/13] | Fees paid | Renewal fee | 25.07.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 19.04.2023 | AT | 19.04.2023 | CZ | 19.04.2023 | DK | 19.04.2023 | EE | 19.04.2023 | ES | 19.04.2023 | FI | 19.04.2023 | HR | 19.04.2023 | IT | 19.04.2023 | LT | 19.04.2023 | LV | 19.04.2023 | MC | 19.04.2023 | NL | 19.04.2023 | PL | 19.04.2023 | RO | 19.04.2023 | RS | 19.04.2023 | SE | 19.04.2023 | SI | 19.04.2023 | SK | 19.04.2023 | SM | 19.04.2023 | LU | 02.07.2023 | NO | 19.07.2023 | GR | 20.07.2023 | BE | 31.07.2023 | CH | 31.07.2023 | IS | 19.08.2023 | PT | 21.08.2023 | [2024/27] |
Former [2024/18] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
MC | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
LU | 02.07.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/14] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
MC | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/10] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RO | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/08] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/03] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/01] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/51] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
HR | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/50] | AL | 19.04.2023 | |
AT | 19.04.2023 | ||
ES | 19.04.2023 | ||
NL | 19.04.2023 | ||
PL | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
GR | 20.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/48] | AT | 19.04.2023 | |
ES | 19.04.2023 | ||
NL | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
PT | 21.08.2023 | ||
Former [2023/46] | ES | 19.04.2023 | |
NL | 19.04.2023 | ||
PT | 21.08.2023 | ||
Former [2023/43] | NL | 19.04.2023 | Documents cited: | Search | [A]KR950005797 ; | [A]US2017297998 (SCHRAUT ARMIN [DE], et al) | International search | [Y]KR0122429B (LG CHEMICAL LTD [KR]); | [A]JPH09295958 (TOAGOSEI CO LTD); | [A]JP2002088020 (NIPPON CATALYTIC CHEM IND); | [A]KR100443389B ; | [Y]KR100806353B ; | [A]KR20180074984 (ENERBIO [KR]); | [DY]KR20190027623 (LG CHEMICAL LTD [KR]) | by applicant | KR101663586B | KR20190027622 | KR20190027623 |