EP4081019 - CONTROL OF A HEADER OF A HARVESTER DURING A NON-HARVESTING MODE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.07.2024 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 11.08.2023 | ||
Former | Grant of patent is intended Status updated on 21.05.2023 | ||
Former | Request for examination was made Status updated on 30.09.2022 | ||
Former | The international publication has been made Status updated on 07.07.2021 | ||
Former | unknown Status updated on 29.01.2021 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states CNH Industrial Belgium NV Leon Claeysstraat 3A 8210 Zedelgem / BE | [2022/44] | Inventor(s) | 01 /
HUNT, Cory Douglas 562 Walnut Hill Road Millersville, Pennsylvania 17551 / US | 02 /
MARTIN, Jethro 565 Cloverbrook Dr. Ephrata, Pennsylvania 17522 / US | [2022/44] | Representative(s) | CNH Industrial IP Department Leon Claeysstraat 3A 8210 Zedelgem / BE | [2022/44] | Application number, filing date | 20842846.6 | 21.12.2020 | [2022/44] | WO2020US66394 | Priority number, date | US201916724918 | 23.12.2019 Original published format: US201916724918 | [2022/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2021133726 | Date: | 01.07.2021 | Language: | EN | [2021/26] | Type: | A1 Application with search report | No.: | EP4081019 | Date: | 02.11.2022 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.07.2021 takes the place of the publication of the European patent application. | [2022/44] | Type: | B1 Patent specification | No.: | EP4081019 | Date: | 13.09.2023 | Language: | EN | [2023/37] | Search report(s) | International search report - published on: | EP | 01.07.2021 | Classification | IPC: | A01D75/28, A01D41/14, A01D75/18 | [2023/23] | CPC: |
A01D41/144 (EP,US);
A01D41/141 (EP,US);
A01D75/185 (EP,US);
A01D75/28 (US);
A01D75/287 (EP)
|
Former IPC [2022/44] | A01D41/14, A01D75/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | STEUERUNG EINES ERNTEVORSATZES EINER ERNTEMASCHINE WÄHREND EINES NICHT-ERNTEMODUS | [2022/44] | English: | CONTROL OF A HEADER OF A HARVESTER DURING A NON-HARVESTING MODE | [2022/44] | French: | COMMANDE D'UN COLLECTEUR DE MOISSONNEUSE-BATTEUSE DURANT UN MODE HORS RÉCOLTE | [2022/44] | Entry into regional phase | 25.07.2022 | National basic fee paid | 25.07.2022 | Designation fee(s) paid | 25.07.2022 | Examination fee paid | Examination procedure | 25.07.2022 | Examination requested [2022/44] | 25.07.2022 | Date on which the examining division has become responsible | 22.05.2023 | Communication of intention to grant the patent | 01.08.2023 | Fee for grant paid | 01.08.2023 | Fee for publishing/printing paid | 01.08.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 14.06.2024 | No opposition filed within time limit [2024/34] | Fees paid | Renewal fee | 02.01.2023 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 13.09.2023 | CZ | 13.09.2023 | DK | 13.09.2023 | EE | 13.09.2023 | ES | 13.09.2023 | FI | 13.09.2023 | HR | 13.09.2023 | LT | 13.09.2023 | LV | 13.09.2023 | MC | 13.09.2023 | NL | 13.09.2023 | PL | 13.09.2023 | RO | 13.09.2023 | RS | 13.09.2023 | SE | 13.09.2023 | SI | 13.09.2023 | SK | 13.09.2023 | SM | 13.09.2023 | NO | 13.12.2023 | GR | 14.12.2023 | IE | 21.12.2023 | IT | 21.12.2023 | LU | 21.12.2023 | BE | 31.12.2023 | CH | 31.12.2023 | IS | 13.01.2024 | PT | 15.01.2024 | [2024/49] |
Former [2024/48] | AT | 13.09.2023 | |
CZ | 13.09.2023 | ||
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
MC | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IE | 21.12.2023 | ||
IT | 21.12.2023 | ||
LU | 21.12.2023 | ||
BE | 31.12.2023 | ||
CH | 31.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/47] | AT | 13.09.2023 | |
CZ | 13.09.2023 | ||
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
MC | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IE | 21.12.2023 | ||
IT | 21.12.2023 | ||
LU | 21.12.2023 | ||
BE | 31.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/40] | AT | 13.09.2023 | |
CZ | 13.09.2023 | ||
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
MC | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IT | 21.12.2023 | ||
LU | 21.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/36] | AT | 13.09.2023 | |
CZ | 13.09.2023 | ||
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IT | 21.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/33] | AT | 13.09.2023 | |
CZ | 13.09.2023 | ||
DK | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/27] | AT | 13.09.2023 | |
CZ | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
PL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/23] | AT | 13.09.2023 | |
CZ | 13.09.2023 | ||
EE | 13.09.2023 | ||
ES | 13.09.2023 | ||
FI | 13.09.2023 | ||
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
RO | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SK | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
PT | 15.01.2024 | ||
Former [2024/20] | FI | 13.09.2023 | |
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
SM | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
IS | 13.01.2024 | ||
Former [2024/14] | FI | 13.09.2023 | |
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
NL | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
Former [2024/10] | FI | 13.09.2023 | |
HR | 13.09.2023 | ||
LT | 13.09.2023 | ||
LV | 13.09.2023 | ||
RS | 13.09.2023 | ||
SE | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
Former [2024/09] | FI | 13.09.2023 | |
LT | 13.09.2023 | ||
SE | 13.09.2023 | ||
NO | 13.12.2023 | ||
GR | 14.12.2023 | ||
Former [2024/08] | LT | 13.09.2023 | |
NO | 13.12.2023 | ||
GR | 14.12.2023 | Cited in | International search | [A]GB1106002 (TEXAS INDUSTRIES INC) [A] 1-20 * figures 1-5, 8 * * page 2, line 8 - page 8, line 26 *; | [A]US7707811 (STROSSER RICHARD P [US]) [A] 1-20 * figures 1-3, 6, 7 * * column 1, line 24 - column 2, line 67 * * column 6, line 61 - column 8, line 67 *; | [A]DK179365B (AGRO INTELLIGENCE APS [DK], et al) [A] 1-20 * figures 1, 2, 4 * * page 2, line 32 - page 3, line 20 ** page 6, lines 4-33 *; | [A]US2019116731 (BERGGREN MICHAEL [US]) [A] 1-20 * figures 1-4 * * paragraph [0021] - paragraph [0029] * |