EP4088309 - METHOD OF JOINING TWO SEMI-CONDUCTOR SUBSTRATES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.09.2024 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 29.09.2023 | ||
Former | Grant of patent is intended Status updated on 12.07.2023 | ||
Former | Request for examination was made Status updated on 14.10.2022 | ||
Former | The international publication has been made Status updated on 16.07.2021 | ||
Former | unknown Status updated on 02.02.2021 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states SOITEC Parc Technologique des Fontaines Chemin des Franques 38190 Bernin / FR | [2022/46] | Inventor(s) | 01 /
GAUDIN, Gweltaz 77 rue de la Ruchère CROLLES 38920 / FR | 02 /
FUTIN, Céline 6 rue Doyen Gosse 38400 SAINT MARTIN D'HERES / FR | [2022/46] | Representative(s) | IP Trust 2, rue de Clichy 75009 Paris / FR | [2022/46] | Application number, filing date | 20845202.9 | 15.12.2020 | [2022/46] | WO2020FR52439 | Priority number, date | FR20200000140 | 09.01.2020 Original published format: FR 2000140 | [2022/46] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2021140285 | Date: | 15.07.2021 | Language: | FR | [2021/28] | Type: | A1 Application with search report | No.: | EP4088309 | Date: | 16.11.2022 | Language: | FR | The application published by WIPO in one of the EPO official languages on 15.07.2021 takes the place of the publication of the European patent application. | [2022/46] | Type: | B1 Patent specification | No.: | EP4088309 | Date: | 01.11.2023 | Language: | FR | [2023/44] | Search report(s) | International search report - published on: | EP | 15.07.2021 | Classification | IPC: | H01L21/18, H01L21/02, H01L21/762 | [2022/46] | CPC: |
H01L21/187 (EP,KR,US);
H01L21/02002 (EP,KR);
H01L21/324 (US);
H01L21/76254 (EP,KR)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUM VERBINDEN ZWEIER HALBLEITERSUBSTRATE | [2022/46] | English: | METHOD OF JOINING TWO SEMI-CONDUCTOR SUBSTRATES | [2022/46] | French: | PROCEDE D'ASSEMBLAGE DE DEUX SUBSTRATS SEMI-CONDUCTEURS | [2022/46] | Entry into regional phase | 25.05.2022 | National basic fee paid | 25.05.2022 | Designation fee(s) paid | 25.05.2022 | Examination fee paid | Examination procedure | 25.05.2022 | Examination requested [2022/46] | 25.05.2022 | Date on which the examining division has become responsible | 13.07.2023 | Communication of intention to grant the patent | 19.09.2023 | Fee for grant paid | 19.09.2023 | Fee for publishing/printing paid | 19.09.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 02.08.2024 | No opposition filed within time limit [2024/41] | Fees paid | Renewal fee | 14.11.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 01.11.2023 | DK | 01.11.2023 | EE | 01.11.2023 | ES | 01.11.2023 | HR | 01.11.2023 | LT | 01.11.2023 | LV | 01.11.2023 | MC | 01.11.2023 | NL | 01.11.2023 | PL | 01.11.2023 | RS | 01.11.2023 | SE | 01.11.2023 | SI | 01.11.2023 | SK | 01.11.2023 | SM | 01.11.2023 | IE | 15.12.2023 | IT | 15.12.2023 | LU | 15.12.2023 | BE | 31.12.2023 | CH | 31.12.2023 | BG | 01.02.2024 | NO | 01.02.2024 | GR | 02.02.2024 | IS | 01.03.2024 | PT | 01.03.2024 | [2024/49] |
Former [2024/48] | CZ | 01.11.2023 | |
DK | 01.11.2023 | ||
EE | 01.11.2023 | ||
ES | 01.11.2023 | ||
HR | 01.11.2023 | ||
LT | 01.11.2023 | ||
LV | 01.11.2023 | ||
MC | 01.11.2023 | ||
NL | 01.11.2023 | ||
PL | 01.11.2023 | ||
RS | 01.11.2023 | ||
SE | 01.11.2023 | ||
SK | 01.11.2023 | ||
SM | 01.11.2023 | ||
IE | 15.12.2023 | ||
IT | 15.12.2023 | ||
LU | 15.12.2023 | ||
BE | 31.12.2023 | ||
CH | 31.12.2023 | ||
BG | 01.02.2024 | ||
NO | 01.02.2024 | ||
GR | 02.02.2024 | ||
IS | 01.03.2024 | ||
PT | 01.03.2024 | ||
Former [2024/47] | CZ | 01.11.2023 | |
DK | 01.11.2023 | ||
EE | 01.11.2023 | ||
ES | 01.11.2023 | ||
HR | 01.11.2023 | ||
LT | 01.11.2023 | ||
LV | 01.11.2023 | ||
MC | 01.11.2023 | ||
NL | 01.11.2023 | ||
PL | 01.11.2023 | ||
RS | 01.11.2023 | ||
SE | 01.11.2023 | ||
SK | 01.11.2023 | ||
SM | 01.11.2023 | ||
IE | 15.12.2023 | ||
IT | 15.12.2023 | ||
LU | 15.12.2023 | ||
BE | 31.12.2023 | ||
BG | 01.02.2024 | ||
NO | 01.02.2024 | ||
GR | 02.02.2024 | ||
IS | 01.03.2024 | ||
PT | 01.03.2024 | ||
Former [2024/40] | CZ | 01.11.2023 | |
DK | 01.11.2023 | ||
EE | 01.11.2023 | ||
ES | 01.11.2023 | ||
HR | 01.11.2023 | ||
LT | 01.11.2023 | ||
LV | 01.11.2023 | ||
MC | 01.11.2023 | ||
NL | 01.11.2023 | ||
PL | 01.11.2023 | ||
RS | 01.11.2023 | ||
SE | 01.11.2023 | ||
SK | 01.11.2023 | ||
SM | 01.11.2023 | ||
IT | 15.12.2023 | ||
LU | 15.12.2023 | ||
BG | 01.02.2024 | ||
NO | 01.02.2024 | ||
GR | 02.02.2024 | ||
IS | 01.03.2024 | ||
PT | 01.03.2024 | ||
Former [2024/36] | CZ | 01.11.2023 | |
DK | 01.11.2023 | ||
EE | 01.11.2023 | ||
ES | 01.11.2023 | ||
HR | 01.11.2023 | ||
LT | 01.11.2023 | ||
LV | 01.11.2023 | ||
NL | 01.11.2023 | ||
PL | 01.11.2023 | ||
RS | 01.11.2023 | ||
SE | 01.11.2023 | ||
SK | 01.11.2023 | ||
SM | 01.11.2023 | ||
IT | 15.12.2023 | ||
BG | 01.02.2024 | ||
NO | 01.02.2024 | ||
GR | 02.02.2024 | ||
IS | 01.03.2024 | ||
PT | 01.03.2024 | ||
Former [2024/35] | CZ | 01.11.2023 | |
DK | 01.11.2023 | ||
EE | 01.11.2023 | ||
ES | 01.11.2023 | ||
HR | 01.11.2023 | ||
LT | 01.11.2023 | ||
LV | 01.11.2023 | ||
NL | 01.11.2023 | ||
PL | 01.11.2023 | ||
RS | 01.11.2023 | ||
SE | 01.11.2023 | ||
SM | 01.11.2023 | ||
BG | 01.02.2024 | ||
NO | 01.02.2024 | ||
GR | 02.02.2024 | ||
IS | 01.03.2024 | ||
PT | 01.03.2024 | ||
Former [2024/33] | DK | 01.11.2023 | |
ES | 01.11.2023 | ||
HR | 01.11.2023 | ||
LT | 01.11.2023 | ||
LV | 01.11.2023 | ||
NL | 01.11.2023 | ||
PL | 01.11.2023 | ||
RS | 01.11.2023 | ||
SE | 01.11.2023 | ||
SM | 01.11.2023 | ||
BG | 01.02.2024 | ||
NO | 01.02.2024 | ||
GR | 02.02.2024 | ||
IS | 01.03.2024 | ||
PT | 01.03.2024 | ||
Former [2024/27] | ES | 01.11.2023 | |
HR | 01.11.2023 | ||
LT | 01.11.2023 | ||
LV | 01.11.2023 | ||
NL | 01.11.2023 | ||
PL | 01.11.2023 | ||
RS | 01.11.2023 | ||
SE | 01.11.2023 | ||
BG | 01.02.2024 | ||
NO | 01.02.2024 | ||
GR | 02.02.2024 | ||
IS | 01.03.2024 | ||
PT | 01.03.2024 | ||
Former [2024/21] | LT | 01.11.2023 | |
NL | 01.11.2023 | ||
BG | 01.02.2024 | ||
GR | 02.02.2024 | ||
IS | 01.03.2024 | ||
Former [2024/20] | GR | 02.02.2024 | |
IS | 01.03.2024 | Cited in | International search | [A]US4818323 (D ARAGONA FRANK S [US], et al); | [A]US4939101 (BLACK ROBERT D [US], et al); | [A]US6010591 (GOESELE ULRICH [DE]); | [A]CN110098140 (ICLEAGUE TECH CO LTD) |