blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4024913

EP4024913 - NETWORK SLICE CHARGING METHOD AND DEVICE [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  03.06.2022
Database last updated on 14.09.2024
FormerThe international publication has been made
Status updated on  03.04.2021
Most recent event   Tooltip29.03.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen
Guangdong 518129 / CN
[2022/27]
Inventor(s)01 / ZHU, Lei
Huawei Administration Building, Bantian, Longgang
District
Shenzhen, Guangdong 518129 / CN
 [2022/27]
Representative(s)Gill Jennings & Every LLP
The Broadgate Tower
20 Primrose Street
London EC2A 2ES / GB
[2022/27]
Application number, filing date20868159.324.04.2020
[2022/27]
WO2020CN86880
Priority number, dateCN20191093622129.09.2019         Original published format: CN201910936221
[2022/27]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021057020
Date:01.04.2021
Language:ZH
[2021/13]
Type: A1 Application with search report 
No.:EP4024913
Date:06.07.2022
Language:EN
[2022/27]
Search report(s)International search report - published on:CN01.04.2021
(Supplementary) European search report - dispatched on:EP30.09.2022
ClassificationIPC:H04W4/24, H04L12/14, H04M15/00
[2022/44]
CPC:
H04W4/24 (EP,CN); H04L12/1407 (EP,CN,US); H04L12/14 (EP);
H04L12/1414 (EP,US); H04M15/00 (EP); H04M15/41 (EP);
H04M15/61 (EP); H04M15/66 (EP,CN); H04M15/785 (EP);
H04M15/8016 (EP); H04W28/16 (US) (-)
Former IPC [2022/27]H04W4/24
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/27]
TitleGerman:NETZWERK-SLICE-AUSWAHLVERFAHREN UND -VORRICHTUNG[2022/27]
English:NETWORK SLICE CHARGING METHOD AND DEVICE[2022/27]
French:PROCÉDÉ ET DISPOSITIF DE FACTURATION DE TRANCHE DE RÉSEAU[2022/27]
Entry into regional phase31.03.2022Translation filed 
31.03.2022National basic fee paid 
31.03.2022Search fee paid 
31.03.2022Designation fee(s) paid 
31.03.2022Examination fee paid 
Examination procedure31.03.2022Examination requested  [2022/27]
17.04.2023Amendment by applicant (claims and/or description)
17.04.2023Date on which the examining division has become responsible
Fees paidRenewal fee
31.03.2022Renewal fee patent year 03
22.03.2023Renewal fee patent year 04
28.03.2024Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]WO2019182493  (ERICSSON TELEFON AB L M [SE]) [Y] 1-13 * page 6 * * paragraph [0100] - paragraph [0104] *;
 [Y]  - NOKIA ET AL, "Network Slice Management charging - solution", vol. SA WG5, no. Sapporo, Japan; 20190625 - 20190628, (20190628), 3GPP DRAFT; S5-194347 REL-16 PCR TR 32.845 NETWORK SLICE MANAGEMENT CHARGING - SOLUTION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/SA5/Docs/S5%2D194347%2Ezip, (20190628), XP051749988 [Y] 1-13 * the whole document *
 [Y]  - HUAWEI ET AL, "Addition of a few editorial corrections and many clarifications between NW Slice and NW Slice Instance", vol. SA WG5, no. Taipei,Taiwan; 20190225 - 20190301, (20190228), 3GPP DRAFT; S5-192295 REL-16 PCR 32.845 ADDITION OF A FEW EDITORIAL CORRECTIONS AND MANY CLARIFICATIONS BETWEEN NW SLICE AND NW SLICE INSTANCE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPET, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/SA5/Docs/S5%2D192295%2Ezip, (20190228), XP051597744 [Y] 6-13 * the whole document *
International search[A]US2018316564  (SENARATH NIMAL GAMINI [CA]) [A] 1-12, 15-26, 29-30, 32 * description, paragraphs 77-105 *;
 [A]CN109873730  (HUAWEI TECH CO LTD) [A] 1-32 * entire document *;
 [A]CN110213800  (CHINA UNICOM) [A] 1-32 * entire document *;
 [X]CN110225474  (HUAWEI TECH CO LTD) [X] 13, 27, 31-32 * description, paragraphs 137-162 *;
 [A]CN110225474  (HUAWEI TECH CO LTD) [A] 14, 28 * description, paragraphs 137-162 *;
 [A]WO2019182493  (ERICSSON TELEFON AB L M [SE]) [A] 1-32 * entire document *;
 [A]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on security aspects of 5G network slicing management (Release 15)", 3GPP Standard; Technical Report; 3GPP TR 33.811, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, (20180605), vol. SA WG3, no. V1.0.0, pages 1 - 19, XP051451581 [A] 1-32 * entire document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.