blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4057722

EP4057722 - METHOD AND DEVICE FOR RETRANSMITTING SIDELINK IN NR V2X [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  12.08.2022
Database last updated on 24.08.2024
FormerThe international publication has been made
Status updated on  14.05.2021
Most recent event   Tooltip05.08.2024The date on which the examining division becomes responsible, has been established 
05.08.2024Amendment by applicant 
Applicant(s)For all designated states
LG Electronics Inc.
128, Yeoui-daero
Yeongdeungpo-gu
SEOUL 07336 / KR
[2022/37]
Inventor(s)01 / LEE, Seungmin
IP Center, LG Electronics Inc.
19, Yangjae-daero
11-gil Seocho-gu
Seoul 06772 / KR
02 / SEO, Hanbyul
IP Center, LG Electronics Inc.
19, Yangjae-daero
11-gil Seocho-gu
Seoul 06772 / KR
 [2022/37]
Representative(s)Mooser, Sebastian Thomas
Wuesthoff & Wuesthoff
Patentanwälte und Rechtsanwalt PartG mbB
Schweigerstraße 2
81541 München / DE
[N/P]
Former [2022/37]Mooser, Sebastian Thomas
Wuesthoff & Wuesthoff
Patentanwälte PartG mbB
Schweigerstraße 2
81541 München / DE
Application number, filing date20886140.109.11.2020
[2022/37]
WO2020KR15629
Priority number, dateUS201962933350P08.11.2019         Original published format: US 201962933350 P
[2022/37]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021091344
Date:14.05.2021
Language:KO
[2021/19]
Type: A1 Application with search report 
No.:EP4057722
Date:14.09.2022
Language:EN
[2022/37]
Search report(s)International search report - published on:KR14.05.2021
(Supplementary) European search report - dispatched on:EP18.01.2024
ClassificationIPC:H04W72/02, H04L1/1829, H04L1/1867, // H04W72/0446, H04W72/40, H04W92/18, H04W4/40
[2024/08]
CPC:
H04L1/1854 (EP); H04W28/26 (KR,US); H04L1/08 (US);
H04L1/1812 (KR); H04L1/1887 (EP); H04W4/40 (EP,KR,US);
H04W72/02 (EP,KR); H04W72/20 (KR); H04W72/23 (KR);
H04W92/18 (EP,KR); H04W72/0446 (EP); H04W72/40 (EP) (-)
Former IPC [2022/37]H04W72/02, H04W72/04, H04W72/12, H04W72/14, H04W28/26, H04L1/18, H04W4/40, H04W92/18
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/37]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR SIDELINK-RÜCKÜBERTRAGUNG IN NR-V2X[2022/37]
English:METHOD AND DEVICE FOR RETRANSMITTING SIDELINK IN NR V2X[2022/37]
French:PROCÉDÉ ET DISPOSITIF POUR RETRANSMETTRE UNE LIAISON LATÉRALE DANS NR V2X[2022/37]
Entry into regional phase30.05.2022Translation filed 
30.05.2022National basic fee paid 
30.05.2022Search fee paid 
30.05.2022Designation fee(s) paid 
30.05.2022Examination fee paid 
Examination procedure30.05.2022Examination requested  [2022/37]
05.08.2024Amendment by applicant (claims and/or description)
05.08.2024Date on which the examining division has become responsible
Fees paidRenewal fee
24.11.2022Renewal fee patent year 03
24.11.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:SearchWO2021002713  [ ] (SAMSUNG ELECTRONICS CO LTD [KR]) [ ] * paragraphs [0114] , [ 206] , [ 222] , [ 288] , [ 311] ** figures 10E, 17 *;
 [E]EP3987863  (SAMSUNG ELECTRONICS CO LTD [KR]) [E] 1-5,12-15 * abstract *;
 [XA]  - INTEL CORPORATION, "Summary#3 for AI 7.2.4.2.2 Mode-2 Resource Allocation", vol. RAN WG1, no. Chongqing, China; 20191014 - 20191020, (20191022), 3GPP DRAFT; R1-1911608 - SUMMARY#3 OF 5G V2X MODE 2, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_98b/Docs/R1-1911608.zip R1-1911608 - Summary#3 of 5G V2X mode 2.docx, (20191022), XP051798863 [X] 1,6-12,15 * section "RAN1.97 on page 18; section "R1-1910650" proposal 8 on page 29; section "R1-1910650" proposal 13 on page 30; section "R1-1910842" proposal 5 on page 32; chapter 3.4 "Proposal for discussion"; section "R1-1910842" proposals 5 and 7; section "R1-1910213" on page 24 proposal 12 * [A] 2-5,13,14
International search[A]US2016219620  (LEE SUNYOUNG [KR], et al) [A] 4-5,8-13;
 [Y]  - Huawei, HiSilicon, "Sidelink resource allocation mode 2 for NR V2X", 3GPP Draft; R1-1910056, Chongqing, China, (20191008), vol. RAN WG1, pages 1 - 12, XP051788863 [Y] 1-3,6-7,14-20 * See section 2.3. *
 [Y]  - National Taiwan University, "Discussion on NR Sidelink Resource Allocation for Mode 2", 3GPP Draft; R1-1912502, Reno, US, (20191107), vol. RAN WG1, pages 1 - 5, XP051816272 [Y] 2,18,20 * See section 3.1. *
 [Y]  - Qualcomm Incorporated, "Sidelink Resource Allocation Mechanism for NR V2X", 3GPP Draft; R1-1911106_Sidelink Resource Allocation Mechanism for NR V2X, Chongqing, China, (20191008), vol. RAN WG1, pages 1 - 10, XP051789883 [Y] 6 * See section 4. *
 [Y]  - MediaTek Inc, "On sidelink mode-2 resource allocation", 3GPP Draft; R1-1911067 On sidelink mode 2 resource allocation, Chongqing, China, (20191008), vol. RAN WG1, pages 1 - 11, XP051789846 [Y] 7 * See section 2.1.1. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.