blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4057752

EP4057752 - METHOD AND DEVICE FOR TRANSMITTING AND RECEIVING SIDELINK DATA IN COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  12.08.2022
Database last updated on 02.09.2024
FormerThe international publication has been made
Status updated on  23.07.2021
Most recent event   Tooltip11.06.2024Amendment by applicant 
Applicant(s)For all designated states
HYUNDAI MOTOR COMPANY
12, Heolleung-ro, Seocho-gu
Seoul 06797 / KR
For all designated states
Kia Corporation
12, Heolleung-ro
Seocho-gu
Seoul 06797 / KR
For all designated states
Wonkwang University Center for Industry - Academy Cooperation
460, Iksan-daero
Iksan-si, Jeollabuk-do 54538 / KR
[2022/37]
Inventor(s)01 / HAHN, Gene Back
150, Hyundaiyeonguso-ro, Namyang-eup
Hwaseong-si, Gyeonggi-do 18280 / KR
02 / JUNG, In Yong
150, Hyundaiyeonguso-ro, Namyang-eup
Hwaseong-si, Gyeonggi-do 18280 / KR
03 / SON, Hyuk Min
106-2302, 17, Seonhwa-ro
Iksan-si, Jeollabuk-do 54653 / KR
 [2022/37]
Representative(s)Isarpatent
Patent- und Rechtsanwälte Barth
Charles Hassa Peckmann & Partner mbB
Friedrichstrasse 31
80801 München / DE
[2022/37]
Application number, filing date20914538.224.12.2020
[2022/37]
WO2020KR19150
Priority number, dateUS202062960372P13.01.2020         Original published format: US 202062960372 P
[2022/37]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021145585
Date:22.07.2021
Language:KO
[2021/29]
Type: A1 Application with search report 
No.:EP4057752
Date:14.09.2022
Language:EN
[2022/37]
Search report(s)International search report - published on:KR22.07.2021
(Supplementary) European search report - dispatched on:EP21.11.2023
ClassificationIPC:H04W72/12, H04W72/04, H04L5/00, H04W92/18, H04W88/02, // H04W52/04
[2023/51]
CPC:
H04L5/0048 (EP); H04W72/20 (EP,KR); H04W72/25 (US);
H04L5/0023 (EP); H04L5/0051 (US); H04L5/0091 (KR);
H04W72/1263 (KR); H04W72/51 (KR); H04W88/02 (KR);
H04W92/18 (EP,KR); H04B7/0417 (EP); H04W4/40 (EP);
H04W76/14 (EP) (-)
Former IPC [2022/37]H04W72/12, H04W72/04, H04L5/00, H04W92/18, H04W88/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/37]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM SENDEN UND EMPFANGEN VON SIDELINK-DATEN IN EINEM KOMMUNIKATIONSSYSTEM[2022/37]
English:METHOD AND DEVICE FOR TRANSMITTING AND RECEIVING SIDELINK DATA IN COMMUNICATION SYSTEM[2022/37]
French:PROCÉDÉ ET DISPOSITIF DE TRANSMISSION ET DE RÉCEPTION DE DONNÉES DE LIAISON LATÉRALE DANS UN SYSTÈME DE COMMUNICATION[2022/37]
Entry into regional phase08.06.2022Translation filed 
08.06.2022National basic fee paid 
08.06.2022Search fee paid 
08.06.2022Designation fee(s) paid 
08.06.2022Examination fee paid 
Examination procedure08.06.2022Examination requested  [2022/37]
10.06.2024Amendment by applicant (claims and/or description)
10.06.2024Date on which the examining division has become responsible
Fees paidRenewal fee
30.12.2022Renewal fee patent year 03
29.12.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search   [XAYI] - NOKIA ET AL, "Discussion of physical layer structure for sidelink", vol. RAN WG1, no. Chongqing, China; 20191014 - 20191020, (20191008), 3GPP DRAFT; R1-1910512-NOKIA-5G_V2X_NRSL-DISCUSSION OF PHYSICAL LAYER STRUCTURE FOR SIDELINK, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SO, URL: https://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_98b/Docs/R1-1910512.zip R1-1910512-Nokia-5G_V2X_NRSL-Discussion of physical layer structure for sidelink.docx, (20191008), XP051809140 [X] 1,2,4,8-10,12 * the whole document * [A] 6,7,14 [Y] 3,11 [I] 5,13
 [Y]  - ERICSSON, "Feature lead summary#3 on Resource allocation for NR sidelink Mode 1", vol. RAN WG1, no. Chongqing, China; 20191014 - 20191020, (20191022), 3GPP DRAFT; R1-1911713 - FEATURE LEAD SUMMARY ON RESOURCE ALLOCATION FOR NR SIDELINK MODE 1 V3, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921, URL: https://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_98b/Docs/R1-1911713.zip R1-1911713 - Feature lead summary on Resource allocation for NR sidelink Mode 1 v3.docx, (20191022), XP051798955 [Y] 3,11 * the whole document *
International search[A]KR20190139624  (INNOVATIVE TECH LAB CO LTD [KR]) [A] 1-20 * See paragraphs [0007], [0186]-[0207] and [0240]-[0244] and figure 8. *;
 [XYA]  - Nokia, Nokia Shanghai Bell, "Discussion of physical layer structure for sidelink", 3GPP Draft; R1-1910512-Nokia-5G_V2X_NRSL-Discussion of physical layer structure for sidelink, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, (20191008), pages 1 - 16, XP051789317 [X] 1-2,4-5,8-10,12-13,15-16,18-20 * See pages 1-15. * [Y] 3,11,17 [A] 6-7,14
 [Y]  - Ericsson, "Feature lead summary#3 on Resource allocation for NR sidelink Mode 1", 3GPP Draft; R1-1911713 - Feature lead summary on Resource allocation for NR sidelink Mode 1 v3, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, (20191022), XP051798955 [Y] 3,11,17 * See pages 1-45. *
 [A]  - NEC, "Physical layer structure for NR sidelink", 3GPP Draft; R1-1912615, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, (20191108), XP051820126 [A] 1-20 * See pages 1-9. *
 [A]  - Mitsubishi Electric, "RS design and other physical layer design issues for NR V2X sidelink", 3GPP Draft; R1-1910179 - RAN1#98b-V2X_RS_Mitsubishi, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, (20191004), XP051788986 [A] 1-20 * See pages 1-18. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.