blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4126532

EP4126532 - SEPARATION SHEET AND USE THEREOF FOR PROVIDING WATERPROOFED STRUCTURES [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  06.01.2023
Database last updated on 07.10.2024
FormerThe international publication has been made
Status updated on  09.10.2021
Most recent event   Tooltip07.09.2024New entry: Decision on request for further processing 
Applicant(s)For all designated states
Sika Technology AG
Zugerstrasse 50
6340 Baar / CH
[2023/06]
Inventor(s)01 / WEI, Qin
ROOM 201, NO. 10, LANE 1058, LIANHUA ROAD,
MINHANG DISTRICT
Shanghai 201100 / CN
02 / WEI, Yizhe
ROOM 302, NO. 14, LANE 1177, MINGHUA ROAD,
SONGJIANG DISTRICT
Shanghai 201612 / CN
 [2023/06]
Representative(s)Sika Patent Attorneys
C/o Sika Technology AG
Corp. IP Dept.
Tüffenwies 16
8048 Zürich / CH
[N/P]
Former [2023/06]Sika Patent Attorneys
c/o Sika Technology AG
Corp. IP Dept.
Tüffenwies 16
Postfach
8048 Zürich / CH
Application number, filing date20928423.102.04.2020
[2023/06]
WO2020CN82885
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021196107
Date:07.10.2021
Language:EN
[2021/40]
Type: A1 Application with search report 
No.:EP4126532
Date:08.02.2023
Language:EN
The application published by WIPO in one of the EPO official languages on 07.10.2021 takes the place of the publication of the European patent application.
[2023/06]
Search report(s)International search report - published on:CN07.10.2021
(Supplementary) European search report - dispatched on:EP24.11.2023
ClassificationIPC:B32B5/18
[2023/06]
CPC:
B32B7/12 (EP); C09J7/26 (EP,US); B32B11/044 (EP);
B32B11/046 (EP); B32B11/048 (EP); B32B25/042 (EP);
B32B25/045 (EP); B32B25/08 (EP); B32B25/14 (EP);
B32B25/16 (EP); B32B25/18 (EP); B32B25/20 (EP);
B32B27/065 (EP); B32B27/08 (EP); B32B27/22 (EP);
B32B27/304 (EP); B32B27/306 (EP); B32B27/32 (EP);
B32B27/40 (EP); B32B5/18 (EP); B32B7/06 (EP);
C09J133/08 (US); C09J7/35 (US); C09J7/38 (EP);
C09J7/385 (US); C09J7/403 (US); B32B2266/0228 (EP);
B32B2266/0235 (EP); B32B2266/025 (EP); B32B2266/0278 (EP);
B32B2266/08 (EP); B32B2274/00 (EP); B32B2307/748 (EP);
B32B2419/06 (EP); C09J2203/346 (EP,US); C09J2301/1242 (EP,US);
C09J2301/302 (US); C09J2301/304 (US); C09J2301/312 (US);
C09J2400/243 (EP); C09J2423/006 (EP); C09J2433/00 (EP);
C09J2495/00 (EP) (-)
C-Set:
C09J2423/006, C09J2431/006 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/06]
TitleGerman:TRENNFOLIE UND VERWENDUNG DAVON ZUR BEREITSTELLUNG WASSERDICHTER STRUKTUREN[2023/06]
English:SEPARATION SHEET AND USE THEREOF FOR PROVIDING WATERPROOFED STRUCTURES[2023/06]
French:FEUILLE DE SÉPARATION ET UTILISATION DE CELLE-CI POUR FOURNIR DES STRUCTURES RENDUES ÉTANCHES À L'EAU[2023/06]
Entry into regional phase02.11.2022National basic fee paid 
02.11.2022Search fee paid 
02.11.2022Designation fee(s) paid 
02.11.2022Examination fee paid 
Examination procedure02.11.2022Examination requested  [2023/06]
16.04.2024Date on which the examining division has become responsible
03.07.2024Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
28.08.2024Amendment by applicant (claims and/or description)
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
28.08.2024Request for further processing filed
28.08.2024Full payment received (date of receipt of payment)
Request granted
06.09.2024Decision despatched
Fees paidRenewal fee
02.11.2022Renewal fee patent year 03
02.05.2023Renewal fee patent year 04
30.04.2024Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]WO2007081325  (POLYGLASS USA INC [US], et al) [A] 1-15 * paragraph [0020] - paragraph [0022] ** abstract *;
 [XAY]DE102010038429  (TESA SE [DE]) [X] 1-7,9,10 * paragraph [0073] * * paragraph [0078] * * paragraph [0081] - paragraph [0082] * * paragraph [0088] * * paragraph [0103] * * paragraph [0129] - paragraph [0131] * * figure 1; examples 1-4; claim 1 * [A] 11-15 [Y] 8;
 [Y]CN110938390  (JIANGSU CANLON BUILDING MAT CO LTD) [Y] 8 * figure 1; claim 1 *
International search[A]WO2009047984  (LINTEC CORP [JP], et al) [A] 1-15 * the whole document *;
 [A]CN103890289  (SAINT GOBAIN ADFORS) [A] 1-15* the whole document *;
 [X]CN101619198B  (TESA SE DE) [X] 1-15 * see claim 1,description from [0019] to [0042]、[0046] to [0099], fig 1 *;
 [A]US2015307749  (HOSHI KENTARO [JP], et al) [A] 1-15 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.