| EP4206460 - WIND TURBINE PLANT AND POWER CONTROL METHOD AND DEVICE THEREOF [Right-click to bookmark this link] | |||
| Former [2023/27] | WIND POWER GENERATOR SET AND POWER CONTROL METHOD AND DEVICE THEREFOR | ||
| [2024/43] | Status | No opposition filed within time limit Status updated on 29.08.2025 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 19.09.2024 | ||
| Former | Grant of patent is intended Status updated on 01.08.2024 | ||
| Former | Request for examination was made Status updated on 02.06.2023 | ||
| Former | The international publication has been made Status updated on 08.04.2022 | Most recent event Tooltip | 24.10.2025 | Lapse of the patent in a contracting state New state(s): CH, IE | published on 26.11.2025 [2025/48] | Applicant(s) | For all designated states Goldwind Science & Technology Co., Ltd. 107 Shanghai Road Economic & Technological Development Zone Urumqi, Xinjiang 830026 / CN | [2024/16] |
| Former [2023/27] | For all designated states Xinjiang Goldwind Science & Technology Co., Ltd. 107 Shanghai Road Economic & Technological Development Zone Urumqi Xinjiang 830026 / CN | Inventor(s) | 01 /
LIU, Zhongpeng Beijing 100176 / CN | [2023/27] | Representative(s) | Gulde & Partner Patent- und Rechtsanwaltskanzlei mbB Berliner Freiheit 2 10785 Berlin / DE | [N/P] |
| Former [2023/27] | Gulde & Partner Patent- und Rechtsanwaltskanzlei mbB Wallstraße 58/59 10179 Berlin / DE | Application number, filing date | 20956085.3 | 11.12.2020 | [2023/27] | WO2020CN135602 | Priority number, date | CN20201158738 | 30.09.2020 Original published format: CN202011058738 | [2023/27] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2022068068 | Date: | 07.04.2022 | Language: | ZH | [2022/14] | Type: | A1 Application with search report | No.: | EP4206460 | Date: | 05.07.2023 | Language: | EN | [2023/27] | Type: | B1 Patent specification | No.: | EP4206460 | Date: | 23.10.2024 | Language: | EN | [2024/43] | Search report(s) | International search report - published on: | CN | 07.04.2022 | (Supplementary) European search report - dispatched on: | EP | 06.02.2024 | Classification | IPC: | F03D7/00, F03D17/00 | [2023/27] | CPC: |
F03D7/0284 (EP,US);
F03D7/0276 (EP,US);
F05B2270/101 (EP,US);
F05B2270/1032 (EP,US);
Y02E10/72 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/27]
| Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | WINDTURBINENANLAGE UND LEISTUNGSSTEUERUNGSVERFAHREN UND VORRICHTUNG DAFÜR | [2024/43] | English: | WIND TURBINE PLANT AND POWER CONTROL METHOD AND DEVICE THEREOF | [2024/43] | French: | CENTRALE ÉOLIENNE ET PROCÉDÉ DE RÉGULATION DE PUISSANCE ET DISPOSITIF ASSOCIÉ | [2024/43] |
| Former [2023/27] | WINDKRAFTGENERATORSATZ UND LEISTUNGSSTEUERUNGSVERFAHREN UND VORRICHTUNG DAFÜR | ||
| Former [2023/27] | WIND POWER GENERATOR SET AND POWER CONTROL METHOD AND DEVICE THEREFOR | ||
| Former [2023/27] | ENSEMBLE GÉNÉRATEUR ÉOLIEN ET PROCÉDÉ DE RÉGULATION DE PUISSANCE ET DISPOSITIF ASSOCIÉ | Entry into regional phase | 31.03.2023 | Translation filed | 31.03.2023 | National basic fee paid | 31.03.2023 | Search fee paid | 31.03.2023 | Designation fee(s) paid | 31.03.2023 | Examination fee paid | Examination procedure | 31.03.2023 | Examination requested [2023/27] | 30.05.2024 | Amendment by applicant (claims and/or description) | 30.05.2024 | Date on which the examining division has become responsible | 02.08.2024 | Communication of intention to grant the patent | 17.09.2024 | Fee for grant paid | 17.09.2024 | Fee for publishing/printing paid | 17.09.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 24.07.2025 | No opposition filed within time limit [2025/40] | Fees paid | Renewal fee | 31.03.2023 | Renewal fee patent year 03 | 23.11.2023 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 23.10.2024 | HR | 23.10.2024 | MC | 23.10.2024 | PL | 23.10.2024 | SK | 23.10.2024 | SM | 23.10.2024 | IE | 11.12.2024 | CH | 31.12.2024 | GB | 23.01.2025 | NO | 23.01.2025 | RS | 23.01.2025 | GR | 24.01.2025 | IS | 23.02.2025 | [2025/48] |
| Former [2025/47] | CZ | 23.10.2024 | |
| HR | 23.10.2024 | ||
| MC | 23.10.2024 | ||
| PL | 23.10.2024 | ||
| SK | 23.10.2024 | ||
| SM | 23.10.2024 | ||
| GB | 23.01.2025 | ||
| NO | 23.01.2025 | ||
| RS | 23.01.2025 | ||
| GR | 24.01.2025 | ||
| IS | 23.02.2025 | ||
| Former [2025/36] | CZ | 23.10.2024 | |
| HR | 23.10.2024 | ||
| MC | 23.10.2024 | ||
| PL | 23.10.2024 | ||
| SK | 23.10.2024 | ||
| SM | 23.10.2024 | ||
| NO | 23.01.2025 | ||
| RS | 23.01.2025 | ||
| GR | 24.01.2025 | ||
| IS | 23.02.2025 | ||
| Former [2025/33] | HR | 23.10.2024 | |
| MC | 23.10.2024 | ||
| PL | 23.10.2024 | ||
| SM | 23.10.2024 | ||
| NO | 23.01.2025 | ||
| RS | 23.01.2025 | ||
| GR | 24.01.2025 | ||
| IS | 23.02.2025 | ||
| Former [2025/32] | HR | 23.10.2024 | |
| PL | 23.10.2024 | ||
| SM | 23.10.2024 | ||
| NO | 23.01.2025 | ||
| RS | 23.01.2025 | ||
| GR | 24.01.2025 | ||
| IS | 23.02.2025 | ||
| Former [2025/23] | HR | 23.10.2024 | |
| PL | 23.10.2024 | ||
| NO | 23.01.2025 | ||
| RS | 23.01.2025 | ||
| GR | 24.01.2025 | ||
| IS | 23.02.2025 | ||
| Former [2025/22] | HR | 23.10.2024 | |
| NO | 23.01.2025 | ||
| GR | 24.01.2025 | ||
| IS | 23.02.2025 | ||
| Former [2025/21] | HR | 23.10.2024 | |
| IS | 23.02.2025 | Documents cited: | Search | [X] US2007069522 (BARTON WERNER et al.) [X] 1-15 * the whole document * | [X] TAN YINGJIE ET AL: "A Suboptimal Power-Point-Tracking-Based Primary Frequency Response Strategy for DFIGs in Hybrid Remote Area Power Supply Systems", IEEE TRANSACTIONS ON ENERGY CONVERSION, IEEE SERVICE CENTER, PISCATAWAY, NJ, US, vol. 31, no. 1, 1 March 2016 (2016-03-01), pages 93 - 105, XP011599813, ISSN: 0885-8969, [retrieved on 20160217], DOI: 10.1109/TEC.2015.2476827 [X] 1-15 * Section III.B, Fig. 1 (page 95) * DOI: http://dx.doi.org/10.1109/TEC.2015.2476827 | [X] RAMTHARAN G ET AL: "Frequency support from doubly fed induction generator wind turbines", 20070312, vol. 1, no. 1, 12 March 2007 (2007-03-12), pages 3 - 9, XP006028297, DOI: 10.1049/IET-RPG:20060019 [X] 1-15 * section 4.2 - Fig. 11 * DOI: http://dx.doi.org/10.1049/iet-rpg:20060019 |