blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3851658

EP3851658 - GAS DAMPER AND BEARING IN A PROPULSION SYSTEM [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  05.04.2024
Database last updated on 31.08.2024
FormerGrant of patent is intended
Status updated on  28.11.2023
FormerRequest for examination was made
Status updated on  28.01.2022
FormerThe application has been published
Status updated on  18.06.2021
Most recent event   Tooltip05.04.2024(Expected) grantpublished on 08.05.2024  [2024/19]
Applicant(s)For all designated states
RTX Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2023/44]
Former [2021/29]For all designated states
Raytheon Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
Inventor(s)01 / MOUSTAKAKIS, Michael P.
128 Streamside Lane
New Britain, CT Connecticut 06052 / US
02 / BOWERS, Daniel R.
352 Wall Street
Hebron, CT Connecticut 06248 / US
 [2021/29]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2021/29]
Application number, filing date21151932.715.01.2021
[2021/29]
Priority number, dateUS20201674461916.01.2020         Original published format: US202016744619
[2021/29]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3851658
Date:21.07.2021
Language:EN
[2021/29]
Type: B1 Patent specification 
No.:EP3851658
Date:08.05.2024
Language:EN
[2024/19]
Search report(s)(Supplementary) European search report - dispatched on:EP26.05.2021
ClassificationIPC:F02K1/82, F02K1/12, F01D25/16, F02K1/80, F01D25/04
[2023/49]
CPC:
F02K1/80 (EP); F01D25/04 (EP,US); F02K1/12 (EP);
F02K1/822 (EP); F05D2220/323 (US); F05D2240/53 (EP);
F05D2240/54 (EP); F05D2260/20 (US); F05D2260/50 (EP);
F05D2260/96 (EP,US); Y02T50/60 (EP) (-)
Former IPC [2021/29]F02K1/12, F01D25/16, F02K1/80
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/09]
Former [2021/29]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:GASDÄMPFER UND -LAGER IN EINEM ANTRIEBSSYSTEM[2021/29]
English:GAS DAMPER AND BEARING IN A PROPULSION SYSTEM[2021/29]
French:AMORTISSEUR DE GAZ ET PALIER DANS UN SYSTÈME DE PROPULSION[2021/29]
Examination procedure21.01.2022Amendment by applicant (claims and/or description)
21.01.2022Examination requested  [2022/09]
21.01.2022Date on which the examining division has become responsible
29.11.2023Communication of intention to grant the patent
28.03.2024Fee for grant paid
28.03.2024Fee for publishing/printing paid
28.03.2024Receipt of the translation of the claim(s)
Fees paidRenewal fee
19.01.2023Renewal fee patent year 03
23.01.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XA]US4756053  (MADDEN WILLIAM M [US], et al) [X] 1,3,5-10,12,14,15 * figures 1-4 * * column 1, line 5 - column 2, line 56 * * column 3, line 4 - column 4, line 14 * [A] 2,4,11,13;
 [A]US2010278465  (KLUSMAN STEVEN ARLEN [US], et al) [A] 1-15 * figures 1-7 * * paragraphs [0001] - [0023] - [0032] - [0044] *;
 [A]US9746029  (MOOK JOSHUA TYLER [US], et al) [A] 1-15 * figures 1-10 * * column 1, line 5 - column 2, line 23 ** column 3, line 20 - column 11, line 27 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.