EP3855717 - IMAGE PROCESSING SYSTEM FOR COMPUTERIZING DOCUMENT, CONTROL METHOD THEREOF, AND STORAGE MEDIUM BACKGROUND [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.06.2024 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 14.07.2023 | ||
Former | Grant of patent is intended Status updated on 16.03.2023 | ||
Former | Request for examination was made Status updated on 04.02.2022 | ||
Former | The application has been published Status updated on 25.06.2021 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states CANON KABUSHIKI KAISHA 30-2 SHIMOMARUKO 3-CHOME OHTA-KU Tokyo 146-8501 / JP | [2021/30] | Inventor(s) | 01 /
MORI, Namihiro c/o CANON KABUSHIKI KAISHA 30-2, Shimomaruko 3-chome Ohta-ku, Tokyo 146-8501 / JP | 02 /
MOCHIZUKI, Hirofumi c/o CANON KABUSHIKI KAISHA 30-2, Shimomaruko 3-chome Ohta-ku, Tokyo 146-8501 / JP | [2021/30] | Representative(s) | Canon Europe Limited European Intellectual Property Group 4 Roundwood Avenue Stockley Park Uxbridge UB11 1AF / GB | [2023/33] |
Former [2021/30] | Canon Europe Limited European Intellectual Property Group 3 The Square, Stockley Park Uxbridge UB11 1ET / GB | Application number, filing date | 21152292.5 | 19.01.2021 | [2021/30] | Priority number, date | JP20200007525 | 21.01.2020 Original published format: JP 2020007525 | [2021/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3855717 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Type: | B1 Patent specification | No.: | EP3855717 | Date: | 16.08.2023 | Language: | EN | [2023/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.06.2021 | Classification | IPC: | H04N1/00 | [2023/13] | CPC: |
H04N1/00244 (EP,CN,US);
G06F40/103 (KR);
H04N1/00095 (CN);
G06V10/945 (EP,US);
G06V10/96 (EP,US);
G06V20/62 (EP,US);
G06V30/12 (EP,US);
G06V30/412 (EP,US);
G06V30/413 (EP,US);
G06V30/414 (US);
G06V30/418 (US);
H04N1/00127 (CN);
H04N1/00204 (CN);
H04N1/00331 (EP,KR,US);
H04N1/0035 (CN);
H04N1/00453 (KR);
H04N1/00766 (US);
H04N1/00771 (US);
H04N1/04 (CN);
G06V30/10 (EP,US);
H04N2201/0081 (KR);
|
Former IPC [2021/30] | H04N1/00, G06K9/00, G06K9/03, G06K9/62 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/10] |
Former [2021/30] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BILDVERARBEITUNGSSYSTEM ZUR COMPUTERISIERUNG VON DOKUMENTEN, STEUERUNGSVERFAHREN DAFÜR UND SPEICHERMEDIENHINTERGRUND | [2021/30] | English: | IMAGE PROCESSING SYSTEM FOR COMPUTERIZING DOCUMENT, CONTROL METHOD THEREOF, AND STORAGE MEDIUM BACKGROUND | [2021/30] | French: | SYSTÈME DE TRAITEMENT D'IMAGES POUR L'INFORMATISATION DE DOCUMENTS, PROCÉDÉ DE COMMANDE ASSOCIÉ ET ARRIÈRE-PLAN DE SUPPORT DE STOCKAGE | [2021/30] | Examination procedure | 06.01.2022 | Amendment by applicant (claims and/or description) | 28.01.2022 | Examination requested [2022/10] | 28.01.2022 | Date on which the examining division has become responsible | 17.03.2023 | Communication of intention to grant the patent | 10.07.2023 | Fee for grant paid | 10.07.2023 | Fee for publishing/printing paid | 10.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 17.05.2024 | No opposition filed within time limit [2024/30] | Fees paid | Renewal fee | 31.01.2023 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 16.08.2023 | BG | 16.08.2023 | CZ | 16.08.2023 | DK | 16.08.2023 | EE | 16.08.2023 | ES | 16.08.2023 | FI | 16.08.2023 | HR | 16.08.2023 | IT | 16.08.2023 | LT | 16.08.2023 | LV | 16.08.2023 | MC | 16.08.2023 | NL | 16.08.2023 | PL | 16.08.2023 | RO | 16.08.2023 | RS | 16.08.2023 | SE | 16.08.2023 | SI | 16.08.2023 | SK | 16.08.2023 | SM | 16.08.2023 | NO | 16.11.2023 | GR | 17.11.2023 | IS | 16.12.2023 | PT | 18.12.2023 | LU | 19.01.2024 | BE | 31.01.2024 | CH | 31.01.2024 | FR | 31.01.2024 | [2024/51] |
Former [2024/48] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
MC | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
LU | 19.01.2024 | ||
BE | 31.01.2024 | ||
CH | 31.01.2024 | ||
FR | 31.01.2024 | ||
Former [2024/47] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
MC | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
LU | 19.01.2024 | ||
BE | 31.01.2024 | ||
FR | 31.01.2024 | ||
Former [2024/43] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
MC | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
LU | 19.01.2024 | ||
Former [2024/40] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
MC | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/36] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/23] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/22] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/20] | AT | 16.08.2023 | |
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/10] | AT | 16.08.2023 | |
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/09] | AT | 16.08.2023 | |
FI | 16.08.2023 | ||
LT | 16.08.2023 | ||
NL | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
Former [2024/08] | LT | 16.08.2023 | |
NL | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | Documents cited: | Search | [XI]US2019228220 (MATSUMOTO YOSHITAKA [JP]); | [A]EP3541057 (SEIKO EPSON CORP [JP]) | by applicant | JP2019159629 |