blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3854924

EP3854924 - METHOD OF MANUFACTURING A COMPOSITE STRUCTURE [Right-click to bookmark this link]
Former [2021/30]FIBER-MODIFIED INTERLAYER FOR A COMPOSITE STRUCTURE AND METHOD OF MANUFACTURE
[2023/07]
StatusThe patent has been granted
Status updated on  22.09.2023
Database last updated on 06.07.2024
FormerGrant of patent is intended
Status updated on  22.05.2023
FormerExamination is in progress
Status updated on  24.04.2023
FormerGrant of patent is intended
Status updated on  22.01.2023
FormerExamination is in progress
Status updated on  01.07.2022
FormerRequest for examination was made
Status updated on  24.12.2021
FormerThe application has been published
Status updated on  25.06.2021
Most recent event   Tooltip31.05.2024Lapse of the patent in a contracting state
New state(s): HR, LV, NO, PL, RS, SE
published on 03.07.2024  [2024/27]
Applicant(s)For all designated states
The Boeing Company
929 Long Bridge Drive
Arlington, VA 22202 / US
[2023/12]
Former [2021/30]For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
Inventor(s)01 / TSOTSIS, Thomas K
C/o The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
02 / SPRENGARD, Joseph E
C/o The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
 [2021/30]
Representative(s)Boult Wade Tennant LLP
Salisbury Square House
8 Salisbury Square
London EC4Y 8AP / GB
[2021/30]
Application number, filing date21155190.830.11.2017
[2021/30]
Priority number, dateUS20161537376909.12.2016         Original published format: US201615373769
[2021/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3854924
Date:28.07.2021
Language:EN
[2021/30]
Type: B1 Patent specification 
No.:EP3854924
Date:25.10.2023
Language:EN
[2023/43]
Search report(s)(Supplementary) European search report - dispatched on:EP14.04.2021
ClassificationIPC:D04H5/08, D04H5/02, B29C70/08, B29C70/50, // B29C70/34, B29K301/12, B29K307/04, B29L31/30
[2021/30]
CPC:
B29C70/081 (EP,KR,US); B29C70/16 (BR); B32B5/022 (CN,KR,US);
B29C70/30 (EP,BR,CN,US); B29C70/34 (EP,BR,KR,US); B29C70/50 (EP,KR,US);
B32B33/00 (CN); B32B37/04 (KR,US); B32B37/06 (CN);
B32B37/10 (BR,CN); B32B37/203 (KR,US); B32B38/08 (KR,US);
B32B38/1808 (KR,US); B32B5/06 (CN,KR); B32B5/08 (KR,US);
B32B5/10 (KR); B32B5/12 (KR,US); B32B5/26 (CN,KR,US);
D04H1/4242 (KR,US); D04H1/4374 (KR,US); D04H3/00 (CN);
D04H3/14 (KR,US); D04H5/02 (EP,US); D04H5/08 (EP,KR,US);
D06B3/10 (KR,US); B29K2301/12 (EP,KR,US); B29K2307/04 (EP,KR,US);
B29K2995/0005 (EP,KR,US); B29K2995/0089 (EP,KR,US); B29K2995/0091 (EP,KR,US);
B29L2031/30 (EP,US); B29L2031/3076 (EP,KR,US); B32B2038/0076 (KR,US);
B32B2038/008 (KR,US); B32B2255/02 (CN); B32B2255/10 (CN);
B32B2255/20 (CN); B32B2255/26 (CN); B32B2260/023 (KR,US);
B32B2260/046 (BR); B32B2262/02 (US); B32B2262/0215 (KR);
B32B2262/0253 (CN); B32B2262/0261 (CN); B32B2262/0269 (CN);
B32B2262/0276 (CN); B32B2262/0284 (CN); B32B2262/0292 (CN);
B32B2262/101 (CN); B32B2262/106 (CN,KR,US); B32B2262/14 (KR,US);
B32B2305/08 (KR,US); B32B2305/20 (KR,US); B32B2305/72 (KR,US);
B32B2307/202 (CN,KR,US); B32B2307/558 (CN,KR,US); B32B2307/56 (KR,US);
B32B2313/04 (KR,US); B32B2398/20 (KR,US); B32B2605/00 (US);
B32B2605/18 (KR,US); Y02T50/40 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/04]
Former [2021/30]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON EINER VERBUNDSTRUKTUR[2023/07]
English:METHOD OF MANUFACTURING A COMPOSITE STRUCTURE[2023/07]
French:PROCÉDÉ POUR LA FABRICATION D'UNE STRUCTURE COMPOSITE[2023/07]
Former [2021/30]FASERMODIFIZIERTE ZWISCHENSCHICHT FÜR EINE VERBUNDSTRUKTUR UND VERFAHREN ZUR HERSTELLUNG
Former [2021/30]FIBER-MODIFIED INTERLAYER FOR A COMPOSITE STRUCTURE AND METHOD OF MANUFACTURE
Former [2021/30]COUCHE INTERCALAIRE MODIFIÉE PAR DES FIBRES POUR UNE STRUCTURE COMPOSITE ET PROCÉDÉ DE FABRICATION
Examination procedure20.12.2021Amendment by applicant (claims and/or description)
20.12.2021Examination requested  [2022/04]
20.12.2021Date on which the examining division has become responsible
30.06.2022Despatch of a communication from the examining division (Time limit: M04)
25.10.2022Reply to a communication from the examining division
23.01.2023Communication of intention to grant the patent
21.04.2023Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
23.05.2023Communication of intention to grant the patent
19.09.2023Fee for grant paid
19.09.2023Fee for publishing/printing paid
19.09.2023Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP17204797.9  / EP3333293
Fees paidRenewal fee
04.02.2021Renewal fee patent year 03
04.02.2021Renewal fee patent year 04
29.11.2021Renewal fee patent year 05
28.11.2022Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT25.10.2023
ES25.10.2023
HR25.10.2023
LT25.10.2023
LV25.10.2023
NL25.10.2023
PL25.10.2023
RS25.10.2023
SE25.10.2023
BG25.01.2024
NO25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
[2024/27]
Former [2024/23]AT25.10.2023
ES25.10.2023
LT25.10.2023
NL25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
PT26.02.2024
Former [2024/21]LT25.10.2023
NL25.10.2023
BG25.01.2024
GR26.01.2024
IS25.02.2024
Former [2024/20]NL25.10.2023
GR26.01.2024
IS25.02.2024
Former [2024/17]NL25.10.2023
Documents cited:Search[A]US5286553  (HARAGUCHI KEIICHI [JP], et al) [A] 1-15 * example 1 *;
 [A]JPH07173754  (MITSUI PETROCHEMICAL IND) [A] 1-15* paragraphs [0001] , [0003]; figure 1; example 1 *;
 [A]WO9922059  (SCA HYGIENE PROD AB [SE], et al) [A] 1-15 * figures 1, 3, 4; claim 1 *;
 [A]US2005059309  (TSOTSIS THOMAS KARL [US]) [A] 1-15 * figure -; claim - *;
 [XAI]CN105200539  (NAT UNIV DONG HWA) [X] 1,4-6,8-11 * claims 5,6 * [A] 15 [I] 2,3,7,12-14;
 [A]EP3002355  (BOEING CO [US]) [A] 1-15 * paragraphs [0030] , [0108] , [0109]; figure 6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.