EP3896909 - PACKET PROCESSING METHOD AND NETWORK DEVICE IN HYBRID ACCESS NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.05.2024 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 23.06.2023 | ||
Former | Grant of patent is intended Status updated on 08.03.2023 | ||
Former | Request for examination was made Status updated on 02.04.2022 | ||
Former | The application has been published Status updated on 17.09.2021 | Most recent event Tooltip | 02.08.2024 | Lapse of the patent in a contracting state New state(s): BE, SI | published on 04.09.2024 [2024/36] | Applicant(s) | For all designated states HUAWEI TECHNOLOGIES CO., LTD. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129, P.R. / CN | [2021/42] | Inventor(s) | 01 /
ZHANG, Mingui Huawei Administration Building, Bantian, Longgang District Shenzhen, Guangdong 518129, P.R. / CN | 02 /
ZHENG, Lianshu Huawei Administration Building, Bantian, Longgang District Shenzhen, Guangdong 518129, P.R. / CN | [2021/42] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2021/42] | Application number, filing date | 21160792.4 | 28.08.2017 | [2021/42] | Priority number, date | CN201610977391 | 04.11.2016 Original published format: CN201610977391 | [2021/42] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3896909 | Date: | 20.10.2021 | Language: | EN | [2021/42] | Type: | B1 Patent specification | No.: | EP3896909 | Date: | 26.07.2023 | Language: | EN | [2023/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.09.2021 | Classification | IPC: | H04L47/125, H04L12/46, H04L47/26, H04L47/41, H04L47/27, H04L47/34, H04L41/0896 | [2023/13] | CPC: |
H04L47/125 (EP,CN,US);
H04L12/4633 (CN,US);
H04L12/6418 (US);
H04L1/1642 (US);
H04L1/187 (US);
H04L12/46 (EP,US);
H04L41/0896 (EP,CN,US);
H04L43/0876 (CN);
H04L47/26 (EP,CN,US);
H04L47/27 (EP);
H04L47/34 (EP);
H04L47/41 (EP,US);
H04L47/76 (CN,US);
H04L2012/6421 (US);
H04L2012/6427 (US);
H04L2012/6464 (US);
H04L2012/6489 (US);
H04L2012/6497 (US);
H04L2212/00 (US)
(-)
|
Former IPC [2021/42] | H04L12/24, H04L12/891, H04L12/46, H04L12/803, // H04L12/825, H04L12/917 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/18] |
Former [2021/42] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PAKETVERARBEITUNGSVERFAHREN UND NETZWERKVORRICHTUNG IN HYBRIDEM ZUGANGSNETZWERK | [2021/42] | English: | PACKET PROCESSING METHOD AND NETWORK DEVICE IN HYBRID ACCESS NETWORK | [2021/42] | French: | PROCÉDÉ DE TRAITEMENT DE PAQUETS ET DISPOSITIF DE RÉSEAU DANS UN RÉSEAU D'ACCÈS HYBRIDE | [2021/42] | Examination procedure | 31.03.2022 | Examination requested [2022/18] | 31.03.2022 | Date on which the examining division has become responsible | 08.04.2022 | Amendment by applicant (claims and/or description) | 09.03.2023 | Communication of intention to grant the patent | 20.06.2023 | Fee for grant paid | 20.06.2023 | Fee for publishing/printing paid | 20.06.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP17868190.4 / EP3531620 | Opposition(s) | 29.04.2024 | No opposition filed within time limit [2024/27] | Fees paid | Renewal fee | 04.03.2021 | Renewal fee patent year 03 | 04.03.2021 | Renewal fee patent year 04 | 31.08.2021 | Renewal fee patent year 05 | 31.08.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 26.07.2023 | CZ | 26.07.2023 | DK | 26.07.2023 | EE | 26.07.2023 | ES | 26.07.2023 | FI | 26.07.2023 | HR | 26.07.2023 | IT | 26.07.2023 | LT | 26.07.2023 | LV | 26.07.2023 | MC | 26.07.2023 | NL | 26.07.2023 | PL | 26.07.2023 | RO | 26.07.2023 | RS | 26.07.2023 | SE | 26.07.2023 | SI | 26.07.2023 | SK | 26.07.2023 | SM | 26.07.2023 | IE | 28.08.2023 | LU | 28.08.2023 | BE | 31.08.2023 | CH | 31.08.2023 | FR | 26.09.2023 | GB | 26.10.2023 | NO | 26.10.2023 | GR | 27.10.2023 | IS | 26.11.2023 | PT | 27.11.2023 | [2024/36] |
Former [2024/35] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
ES | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
IT | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
IE | 28.08.2023 | ||
LU | 28.08.2023 | ||
CH | 31.08.2023 | ||
FR | 26.09.2023 | ||
GB | 26.10.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/33] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
ES | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
IT | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
IE | 28.08.2023 | ||
LU | 28.08.2023 | ||
CH | 31.08.2023 | ||
GB | 26.10.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/27] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
ES | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
IT | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 28.08.2023 | ||
CH | 31.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/23] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
ES | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 28.08.2023 | ||
CH | 31.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/22] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 28.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/21] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 28.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/20] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SM | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/10] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/09] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
LT | 26.07.2023 | ||
NL | 26.07.2023 | ||
SE | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
Former [2024/08] | LT | 26.07.2023 | |
NL | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
Former [2024/05] | NL | 26.07.2023 | Documents cited: | Search | [Y]US2005254420 (WAGER STEFAN [FI], et al) [Y] 2,3,7,13,14 * paragraph [0001] - paragraph [0002] * * paragraph [0016] * * paragraph [0020] * * paragraph [0024] - paragraph [0026] * * paragraph [0029] * * paragraph [0045] * * paragraph [0048] - paragraph [0049] ** paragraph [0055] *; | [Y]US2007076626 (WISE SIMON [CA], et al) [Y] 1-15 * paragraph [0003] * * paragraph [0014] - paragraph [0016] * * paragraph [0021] - paragraph [0022] * * paragraph [0030] * * paragraph [0036] *; | [Y]US2009316719 (BARON STEPHANE [FR], et al) [Y] 1-15 * paragraph [0359] - paragraph [0366] * * paragraph [0368] - paragraph [0372] *; | [XY] - ZHANG HUAWEI N LEYMANN C HEIDEMANN DEUTSCHE TELEKOM AG M CULLEN PAINLESS SECURITY M, "Flow Control for Bonding Tunnels; draft-zhang-banana-tcp-in-bonding-tunnels-00.txt", FLOW CONTROL FOR BONDING TUNNELS; DRAFT-ZHANG-BANANA-TCP-IN-BONDING-TUNNELS-00.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARDWORKINGDRAFT, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20160321), pages 1 - 6, XP015112262 [X] 1,4-6,9-12,15 * 1.Introduction; 2. Acronyms and Terminology; 3. A Network Based Sliding Window; 4.Bonding De-Activation * [Y] 2,3,7,13,14 |