EP3896463 - METHOD AND DEVICE FOR MONITORING THE DISCONNECTION OF A POWER GENERATOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.08.2023 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 02.09.2022 | ||
Former | Grant of patent is intended Status updated on 01.05.2022 | ||
Former | Request for examination was made Status updated on 26.11.2021 | ||
Former | The application has been published Status updated on 17.09.2021 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Bender GmbH & Co. KG Londorfer Strasse 65 35305 Grünberg / DE | [2021/42] | Inventor(s) | 01 /
HACKL, Dieter Gartenstraße 8 35463 Fernwald / DE | [2021/42] | Representative(s) | advotec. Patent- und Rechtsanwaltspartnerschaft Tappe mbB Georg-Schlosser-Straße 6 35390 Gießen / DE | [2021/42] | Application number, filing date | 21161910.1 | 11.03.2021 | [2021/42] | Priority number, date | DE202010109000 | 01.04.2020 Original published format: DE102020109000 | [2021/42] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3896463 | Date: | 20.10.2021 | Language: | DE | [2021/42] | Type: | B1 Patent specification | No.: | EP3896463 | Date: | 05.10.2022 | Language: | DE | [2022/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.09.2021 | Classification | IPC: | G01R1/20, G01R31/52, H02H1/00, H02H3/26 | [2021/42] | CPC: |
G01R31/52 (EP);
G01R1/203 (EP);
H02H5/12 (EP);
H02H3/044 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/52] |
Former [2021/42] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND VORRICHTUNG ZUR ÜBERWACHUNG DER SCHUTZTRENNUNG BEI EINEM STROMERZEUGER | [2021/42] | English: | METHOD AND DEVICE FOR MONITORING THE DISCONNECTION OF A POWER GENERATOR | [2021/42] | French: | PROCÉDÉ ET DISPOSITIF DE SURVEILLANCE DE LA SÉPARATION DE PROTECTION DANS UN GÉNÉRATEUR | [2021/42] | Examination procedure | 18.11.2021 | Examination requested [2021/52] | 18.11.2021 | Date on which the examining division has become responsible | 02.05.2022 | Communication of intention to grant the patent | 26.08.2022 | Fee for grant paid | 26.08.2022 | Fee for publishing/printing paid | 26.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 06.07.2023 | No opposition filed within time limit [2023/37] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 05.10.2022 | BG | 05.10.2022 | CZ | 05.10.2022 | DK | 05.10.2022 | EE | 05.10.2022 | ES | 05.10.2022 | FI | 05.10.2022 | HR | 05.10.2022 | IT | 05.10.2022 | LT | 05.10.2022 | LV | 05.10.2022 | MC | 05.10.2022 | NL | 05.10.2022 | PL | 05.10.2022 | RO | 05.10.2022 | RS | 05.10.2022 | SE | 05.10.2022 | SI | 05.10.2022 | SK | 05.10.2022 | SM | 05.10.2022 | NO | 05.01.2023 | GR | 06.01.2023 | IS | 05.02.2023 | PT | 06.02.2023 | IE | 11.03.2023 | LU | 11.03.2023 | BE | 31.03.2023 | [2024/51] |
Former [2024/27] | AL | 05.10.2022 | |
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
IT | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SI | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
IE | 11.03.2023 | ||
LU | 11.03.2023 | ||
BE | 31.03.2023 | ||
Former [2024/12] | AL | 05.10.2022 | |
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SI | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
IE | 11.03.2023 | ||
LU | 11.03.2023 | ||
BE | 31.03.2023 | ||
Former [2024/08] | AL | 05.10.2022 | |
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SI | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
IE | 11.03.2023 | ||
LU | 11.03.2023 | ||
Former [2024/02] | AL | 05.10.2022 | |
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SI | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
LU | 11.03.2023 | ||
Former [2023/51] | AL | 05.10.2022 | |
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SI | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/48] | AL | 05.10.2022 | |
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/38] | AL | 05.10.2022 | |
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/37] | AL | 05.10.2022 | |
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/35] | CZ | 05.10.2022 | |
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/34] | DK | 05.10.2022 | |
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/33] | DK | 05.10.2022 | |
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/25] | ES | 05.10.2022 | |
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/23] | ES | 05.10.2022 | |
FI | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
SE | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
PT | 06.02.2023 | ||
Former [2023/22] | ES | 05.10.2022 | |
FI | 05.10.2022 | ||
LT | 05.10.2022 | ||
NL | 05.10.2022 | ||
SE | 05.10.2022 | ||
NO | 05.01.2023 | ||
PT | 06.02.2023 | ||
Former [2023/20] | LT | 05.10.2022 | |
NL | 05.10.2022 | ||
NO | 05.01.2023 | ||
Former [2023/17] | NL | 05.10.2022 | Documents cited: | Search | [A]DE19826410 (WALTHER BENDER GMBH & CO KG DI [DE]) [A] 1-8 * column 3, line 31 - column 3, line 47; figures 1,5; claim 1 *; | [A]US8072103 (ECKERT RAINER [DE], et al) [A] 1-8 * column 1, line 40 - column 2, line 23; figure 1 *; | [A]US2018334047 (WISCHNACK THOMAS [DE], et al) [A] 1-8 * paragraph [0030]; figure 1 *; | [A] - Anonymous, "Earthing system - Wikipedia, the free encyclopedia", (20140308), URL: http://en.wikipedia.org/w/index.php?title=Earthing_system&oldid=598736606, (20150513), XP055189068 [A] 1-8 * the whole document * |