EP4071565 - OPTIMIZATION METHOD FOR THE OPERATION OF SYSTEMS IN THE RAW MATERIALS INDUSTRY [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 08.09.2023 Database last updated on 06.07.2024 | |
Former | The application has been published Status updated on 09.09.2022 | Most recent event Tooltip | 08.09.2023 | Application deemed to be withdrawn | published on 11.10.2023 [2023/41] | Applicant(s) | For all designated states Primetals Technologies Austria GmbH Turmstrasse 44 4031 Linz / AT | [2022/41] | Inventor(s) | 01 /
Sattler, Manuel 4600 Wels / AT | 02 /
Hohenbichler, Gerald 4484 Kronstorf / AT | 03 /
Kradel, Benjamin 66914 Waldmohr / DE | 04 /
Strasser, Sonja 4451 Garsten / AT | [2022/41] | Representative(s) | Metals@Linz Primetals Technologies Austria GmbH Intellectual Property Upstream IP UP Turmstraße 44 4031 Linz / AT | [2022/41] | Application number, filing date | 21167621.8 | 09.04.2021 | [2022/41] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP4071565 | Date: | 12.10.2022 | Language: | DE | [2022/41] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.09.2021 | Classification | IPC: | G05B17/02, G06N3/08 | [2022/41] | CPC: |
G05B13/04 (EP);
G05B19/41835 (US);
G05B17/02 (EP);
G05B2219/31449 (US);
G05B2219/45234 (US);
G06N5/01 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | OPTIMIERUNGSVERSFAHREN FÜR DEN BETRIEB VON ANLAGEN DER GRUNDSTOFFINDUSTRIE | [2022/41] | English: | OPTIMIZATION METHOD FOR THE OPERATION OF SYSTEMS IN THE RAW MATERIALS INDUSTRY | [2022/41] | French: | PROCÉDÉ D'OPTIMISATION POUR LE FONCTIONNEMENT DES INSTALLATIONS DE L'INDUSTRIE DE BASE | [2022/41] | Examination procedure | 13.04.2023 | Application deemed to be withdrawn, date of legal effect [2023/41] | 23.05.2023 | Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time [2023/41] | Fees paid | Penalty fee | Additional fee for renewal fee | 30.04.2023 | 03   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. |