| EP3890380 - METHOD, BASE STATION, TERMINAL AND COMMUNICATION SYSTEM FOR SELECTING A COMPONENT CARRIER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.10.2023 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 18.11.2022 | ||
| Former | Grant of patent is intended Status updated on 18.07.2022 | ||
| Former | Request for examination was made Status updated on 03.09.2021 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Sony Group Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2021/40] | Inventor(s) | 01 /
WEI, Yuxin Room 701 North Building Raycom Infotech Park Tower C No.2 Kexueyuan South Road, Zhongguancun Haidian District, Beijing 100190 / CN | [2021/40] | Representative(s) | D Young & Co LLP 3 Noble Street London EC2V 7BQ / GB | [N/P] |
| Former [2021/40] | D Young & Co LLP 120 Holborn London EC1N 2DY / GB | Application number, filing date | 21173208.6 | 02.04.2011 | [2021/40] | Priority number, date | CN201010162513 | 30.04.2010 Original published format: CN201010162513 | [2021/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3890380 | Date: | 06.10.2021 | Language: | EN | [2021/40] | Type: | B1 Patent specification | No.: | EP3890380 | Date: | 21.12.2022 | Language: | EN | [2022/51] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 01.09.2021 | Classification | IPC: | H04W8/24 | [2021/40] | CPC: |
H04W72/0453 (EP,BR,CN,RU,US);
H04L5/001 (EP,BR,CN,RU,US);
H04W72/00 (KR);
H04W8/02 (KR);
H04L5/0098 (EP,BR,CN,US);
H04W74/0833 (EP,BR,CN,KR,RU,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/40] | Title | German: | METHODE, BASISSTATION, TERMINAL- UND KOMMUNIKATIONSSYSTEM ZUR AUSWAHL EINES KOMPONENTENTRÄGERS | [2021/40] | English: | METHOD, BASE STATION, TERMINAL AND COMMUNICATION SYSTEM FOR SELECTING A COMPONENT CARRIER | [2021/40] | French: | PROCEDE, STATION DE BASE, TERMINAL ET SYSTEME DE COMMUNICATION POUR SÉLECTIONNER UNE PORTEUSE | [2021/40] | Examination procedure | 28.05.2021 | Examination requested [2021/40] | 10.03.2022 | Amendment by applicant (claims and/or description) | 19.07.2022 | Communication of intention to grant the patent | 08.11.2022 | Fee for grant paid | 08.11.2022 | Fee for publishing/printing paid | 08.11.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP11774329.4 / EP2566202 | EP18151475.3 / EP3337207 | EP19186012.1 / EP3598785 | Divisional application(s) | EP22206152.5 / EP4161115 | Opposition(s) | 22.09.2023 | No opposition filed within time limit [2023/48] | Fees paid | Renewal fee | 28.05.2021 | Renewal fee patent year 03 | 28.05.2021 | Renewal fee patent year 04 | 28.05.2021 | Renewal fee patent year 05 | 28.05.2021 | Renewal fee patent year 06 | 28.05.2021 | Renewal fee patent year 07 | 28.05.2021 | Renewal fee patent year 08 | 28.05.2021 | Renewal fee patent year 09 | 28.05.2021 | Renewal fee patent year 10 | 28.05.2021 | Renewal fee patent year 11 | 20.04.2022 | Renewal fee patent year 12 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 02.04.2011 | HU | 02.04.2011 | AL | 21.12.2022 | AT | 21.12.2022 | BG | 21.12.2022 | CZ | 21.12.2022 | DK | 21.12.2022 | EE | 21.12.2022 | ES | 21.12.2022 | FI | 21.12.2022 | HR | 21.12.2022 | IT | 21.12.2022 | LT | 21.12.2022 | LV | 21.12.2022 | MC | 21.12.2022 | NL | 21.12.2022 | PL | 21.12.2022 | RO | 21.12.2022 | RS | 21.12.2022 | SE | 21.12.2022 | SI | 21.12.2022 | SK | 21.12.2022 | SM | 21.12.2022 | TR | 21.12.2022 | NO | 21.03.2023 | GR | 22.03.2023 | IE | 02.04.2023 | LU | 02.04.2023 | IS | 21.04.2023 | PT | 21.04.2023 | BE | 30.04.2023 | CH | 30.04.2023 | FR | 30.04.2023 | LI | 30.04.2023 | [2026/05] |
| Former [2025/39] | CY | 02.04.2011 | |
| HU | 02.04.2011 | ||
| AL | 21.12.2022 | ||
| AT | 21.12.2022 | ||
| BG | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| IT | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| MC | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SI | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| IE | 02.04.2023 | ||
| LU | 02.04.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| BE | 30.04.2023 | ||
| CH | 30.04.2023 | ||
| FR | 30.04.2023 | ||
| LI | 30.04.2023 | ||
| Former [2025/36] | CY | 02.04.2011 | |
| AL | 21.12.2022 | ||
| AT | 21.12.2022 | ||
| BG | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| IT | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| MC | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SI | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| IE | 02.04.2023 | ||
| LU | 02.04.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| BE | 30.04.2023 | ||
| CH | 30.04.2023 | ||
| FR | 30.04.2023 | ||
| LI | 30.04.2023 | ||
| Former [2024/51] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| BG | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| IT | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| MC | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SI | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| IE | 02.04.2023 | ||
| LU | 02.04.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| BE | 30.04.2023 | ||
| CH | 30.04.2023 | ||
| FR | 30.04.2023 | ||
| LI | 30.04.2023 | ||
| Former [2024/27] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| IT | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| MC | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SI | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| IE | 02.04.2023 | ||
| LU | 02.04.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| BE | 30.04.2023 | ||
| CH | 30.04.2023 | ||
| FR | 30.04.2023 | ||
| LI | 30.04.2023 | ||
| Former [2024/21] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| MC | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SI | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| IE | 02.04.2023 | ||
| LU | 02.04.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| BE | 30.04.2023 | ||
| CH | 30.04.2023 | ||
| FR | 30.04.2023 | ||
| LI | 30.04.2023 | ||
| Former [2024/11] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| MC | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SI | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| LU | 02.04.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| BE | 30.04.2023 | ||
| CH | 30.04.2023 | ||
| FR | 30.04.2023 | ||
| LI | 30.04.2023 | ||
| Former [2024/09] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| MC | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| LU | 02.04.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| CH | 30.04.2023 | ||
| LI | 30.04.2023 | ||
| Former [2024/08] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| MC | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| LU | 02.04.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| Former [2024/04] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| LU | 02.04.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| Former [2023/46] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| DK | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| Former [2023/39] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| IS | 21.04.2023 | ||
| PT | 21.04.2023 | ||
| Former [2023/38] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| PL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SK | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| PT | 21.04.2023 | ||
| Former [2023/37] | AL | 21.12.2022 | |
| AT | 21.12.2022 | ||
| CZ | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| PT | 21.04.2023 | ||
| Former [2023/35] | AT | 21.12.2022 | |
| CZ | 21.12.2022 | ||
| EE | 21.12.2022 | ||
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| RO | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| PT | 21.04.2023 | ||
| Former [2023/34] | EE | 21.12.2022 | |
| ES | 21.12.2022 | ||
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| PT | 21.04.2023 | ||
| Former [2023/33] | ES | 21.12.2022 | |
| FI | 21.12.2022 | ||
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| SM | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| Former [2023/29] | FI | 21.12.2022 | |
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| NL | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| Former [2023/25] | FI | 21.12.2022 | |
| HR | 21.12.2022 | ||
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| RS | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| Former [2023/23] | FI | 21.12.2022 | |
| LT | 21.12.2022 | ||
| LV | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| GR | 22.03.2023 | ||
| Former [2023/22] | FI | 21.12.2022 | |
| LT | 21.12.2022 | ||
| SE | 21.12.2022 | ||
| NO | 21.03.2023 | ||
| Former [2023/20] | LT | 21.12.2022 | |
| NO | 21.03.2023 | Documents cited: | Search | [Y] WO2009120286 (ALCATEL LUCENT USA INC et al.) [Y] 1-15 * figures 1-4B * | [Y] NOKIA CORPORATION ET AL: "Measurement Events in Carrier Aggregation", 3GPP DRAFT; R2-102098 MEASUREMENTS IN CARRIER AGGREGATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Beijing, china; 20100412, 6 April 2010 (2010-04-06), XP050422561 [Y] 1-15 * paragraph [03.2]; figure 4A * |