| EP3955116 - MEMORY CONTROLLER, AND MEMORY SYSTEM INCLUDING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.11.2024 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 08.12.2023 | ||
| Former | Grant of patent is intended Status updated on 26.07.2023 | ||
| Former | Examination is in progress Status updated on 09.09.2022 | ||
| Former | Request for examination was made Status updated on 14.01.2022 | Most recent event Tooltip | 13.03.2026 | Lapse of the patent in a contracting state New state(s): HU | published on 15.04.2026 [2026/16] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 16677 / KR | [2022/07] | Inventor(s) | 01 /
JU, Myeongjong 16677 Suwon-si / KR | 02 /
LEE, Seungjae 16677 Suwon-si / KR | 03 /
KIM, Jisoo 16677 Suwon-si / KR | [2022/07] | Representative(s) | Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | [2024/02] |
| Former [2022/07] | Mounteney, Simon James, et al Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | Application number, filing date | 21179883.0 | 16.06.2021 | [2022/07] | Priority number, date | KR20200101191 | 12.08.2020 Original published format: KR 20200101191 | [2022/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3955116 | Date: | 16.02.2022 | Language: | EN | [2022/07] | Type: | B1 Patent specification | No.: | EP3955116 | Date: | 10.01.2024 | Language: | EN | [2024/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.11.2021 | Classification | IPC: | G06F12/02, G06F12/14, G06F21/78 | [2022/07] | CPC: |
G06F12/0246 (EP,KR);
G06F12/1408 (EP,CN,KR);
G06F12/1458 (CN);
G06F3/0623 (US);
G06F12/1416 (KR);
G06F21/78 (EP);
G06F21/79 (KR);
G06F3/062 (KR);
G06F3/064 (KR);
G06F3/0655 (US);
G06F3/0679 (KR,US);
G06F2212/1016 (EP);
G06F2212/1052 (EP);
G06F2212/7205 (EP);
G06F2212/7207 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/07] | Title | German: | SPEICHERSTEUERGERÄT UND SPEICHERSYSTEM DAMIT | [2022/07] | English: | MEMORY CONTROLLER, AND MEMORY SYSTEM INCLUDING THE SAME | [2022/07] | French: | CONTRÔLEUR DE MÉMOIRE ET SYSTÈME DE MÉMOIRE LE COMPRENANT | [2022/07] | Examination procedure | 16.06.2021 | Examination requested [2022/07] | 18.07.2022 | Amendment by applicant (claims and/or description) | 09.09.2022 | Despatch of a communication from the examining division (Time limit: M04) | 08.01.2023 | Reply to a communication from the examining division | 14.03.2023 | Despatch of a communication from the examining division (Time limit: M04) | 30.06.2023 | Reply to a communication from the examining division | 27.07.2023 | Communication of intention to grant the patent | 04.12.2023 | Fee for grant paid | 04.12.2023 | Fee for publishing/printing paid | 04.12.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 11.10.2024 | No opposition filed within time limit [2024/51] | Fees paid | Renewal fee | 31.03.2023 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 16.06.2021 | HU | 16.06.2021 | AT | 10.01.2024 | BG | 10.01.2024 | CZ | 10.01.2024 | DK | 10.01.2024 | EE | 10.01.2024 | ES | 10.01.2024 | FI | 10.01.2024 | HR | 10.01.2024 | IT | 10.01.2024 | LT | 10.01.2024 | LV | 10.01.2024 | MC | 10.01.2024 | NL | 10.01.2024 | PL | 10.01.2024 | RO | 10.01.2024 | SE | 10.01.2024 | SI | 10.01.2024 | SK | 10.01.2024 | SM | 10.01.2024 | NO | 10.04.2024 | RS | 10.04.2024 | GR | 11.04.2024 | IS | 10.05.2024 | PT | 10.05.2024 | IE | 16.06.2024 | LU | 16.06.2024 | CH | 30.06.2024 | FR | 30.06.2024 | [2026/16] |
| Former [2025/51] | CY | 16.06.2021 | |
| AT | 10.01.2024 | ||
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| FI | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SI | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| IE | 16.06.2024 | ||
| LU | 16.06.2024 | ||
| CH | 30.06.2024 | ||
| FR | 30.06.2024 | ||
| Former [2025/45] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| FI | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SI | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| IE | 16.06.2024 | ||
| LU | 16.06.2024 | ||
| CH | 30.06.2024 | ||
| FR | 30.06.2024 | ||
| Former [2025/23] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SI | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| IE | 16.06.2024 | ||
| LU | 16.06.2024 | ||
| CH | 30.06.2024 | ||
| FR | 30.06.2024 | ||
| Former [2025/22] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SI | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| IE | 16.06.2024 | ||
| LU | 16.06.2024 | ||
| CH | 30.06.2024 | ||
| Former [2025/13] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| LU | 16.06.2024 | ||
| Former [2025/11] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| MC | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2025/02] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| IT | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/49] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| RO | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SK | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/48] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| CZ | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| EE | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/47] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| DK | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| SM | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/37] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| SE | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/36] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| LV | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| PL | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| PT | 10.05.2024 | ||
| Former [2024/35] | AT | 10.01.2024 | |
| BG | 10.01.2024 | ||
| ES | 10.01.2024 | ||
| HR | 10.01.2024 | ||
| LT | 10.01.2024 | ||
| NL | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| RS | 10.04.2024 | ||
| GR | 11.04.2024 | ||
| IS | 10.05.2024 | ||
| Former [2024/33] | LT | 10.01.2024 | |
| NL | 10.01.2024 | ||
| NO | 10.04.2024 | ||
| IS | 10.05.2024 | ||
| Former [2024/32] | NL | 10.01.2024 | |
| IS | 10.05.2024 | ||
| Former [2024/31] | NL | 10.01.2024 | Documents cited: | Search | [Y] US2019199520 (KIM SEOKHWAN et al.) | [Y] US2017039397 (FURUHASHI KANA et al.) | [A] US7734043 (JEFFERSON DAVID et al.) | [A] US2019132125 (ARROYO DIANA et al.) | [A] US2017169883 (KWON JOON-SOO et al.) | [Y] US2019362081 (KANNO SHINICHI et al.) [Y] 1-10 * abstract * * paragraph [0035] - paragraph [0062] * * paragraph [0072] - paragraph [0088] * * figures 3, 4, 6, 7, 11 * * paragraph [0005] - paragraph [0006] * | [Y] US9749132 (HAMILTON JAMES R et al.) [Y] 1-10 * abstract * * paragraph [0004] - paragraph [0039] * * figure 4 * | by applicant | US7679133 | US8553466 | US8654587 | US8559235 | US2011233648 |