EP3934106 - METHOD FOR TRANSMISSION ON AN EXTENDED BAND BETWEEN TWO NEIGHBOURING DEVICES OF A NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.09.2024 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 20.10.2023 | ||
Former | Grant of patent is intended Status updated on 21.06.2023 | ||
Former | Examination is in progress Status updated on 23.12.2022 | ||
Former | Request for examination was made Status updated on 03.12.2021 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states Sagemcom Energy & Telecom SAS 4 Allée des Messageries 92270 Bois-Colombes / FR | [2024/11] |
Former [2022/01] | For all designated states Sagemcom Energy & Telecom SAS 250 Route de l'Empereur 92500 Rueil-Malmaison / FR | Inventor(s) | 01 /
BAROIS, Jérôme 92500 RUEIL MALMAISON / FR | 02 /
BARTHES, Julien 92500 RUEIL MALMAISON / FR | 03 /
TERRIEN, Clément 92500 RUEIL MALMAISON / FR | [2022/01] | Representative(s) | Cabinet Le Guen Maillet 3, impasse de la Vigie CS 71840 35418 Saint-Malo Cedex / FR | [2022/01] | Application number, filing date | 21181332.4 | 24.06.2021 | [2022/01] | Priority number, date | FR20200006945 | 01.07.2020 Original published format: FR 2006945 | [2022/01] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3934106 | Date: | 05.01.2022 | Language: | FR | [2022/01] | Type: | B1 Patent specification | No.: | EP3934106 | Date: | 22.11.2023 | Language: | FR | [2023/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.10.2021 | Classification | IPC: | H04B3/54 | [2022/01] | CPC: |
H04B3/54 (EP,US);
H04L5/0007 (US);
H04B3/542 (EP);
H04L1/0071 (US);
H04B2203/5408 (EP);
H04B2203/5433 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/29] |
Former [2022/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR BREITBANDÜBERTRAGUNG ZWISCHEN ZWEI BENACHBARTEN VORRICHTUNGEN IN EINEM NETZWERK | [2022/01] | English: | METHOD FOR TRANSMISSION ON AN EXTENDED BAND BETWEEN TWO NEIGHBOURING DEVICES OF A NETWORK | [2022/01] | French: | PROCÉDÉ DE TRANSMISSION EN BANDE ÉTENDUE ENTRE DEUX DISPOSITIFS VOISINS D'UN RÉSEAU | [2022/01] | Examination procedure | 24.06.2021 | Examination requested [2022/01] | 10.06.2022 | Amendment by applicant (claims and/or description) | 02.01.2023 | Despatch of a communication from the examining division (Time limit: M04) | 17.04.2023 | Reply to a communication from the examining division | 22.06.2023 | Communication of intention to grant the patent | 13.10.2023 | Fee for grant paid | 13.10.2023 | Fee for publishing/printing paid | 13.10.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 23.08.2024 | No opposition filed within time limit [2024/44] | Fees paid | Renewal fee | 20.06.2023 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 22.11.2023 | CZ | 22.11.2023 | DK | 22.11.2023 | EE | 22.11.2023 | ES | 22.11.2023 | HR | 22.11.2023 | IT | 22.11.2023 | LT | 22.11.2023 | LV | 22.11.2023 | NL | 22.11.2023 | PL | 22.11.2023 | RO | 22.11.2023 | RS | 22.11.2023 | SE | 22.11.2023 | SI | 22.11.2023 | SK | 22.11.2023 | SM | 22.11.2023 | BG | 22.02.2024 | NO | 22.02.2024 | GR | 23.02.2024 | IS | 22.03.2024 | PT | 22.03.2024 | [2024/49] |
Former [2024/36] | AT | 22.11.2023 | |
CZ | 22.11.2023 | ||
DK | 22.11.2023 | ||
EE | 22.11.2023 | ||
ES | 22.11.2023 | ||
HR | 22.11.2023 | ||
IT | 22.11.2023 | ||
LT | 22.11.2023 | ||
LV | 22.11.2023 | ||
NL | 22.11.2023 | ||
PL | 22.11.2023 | ||
RO | 22.11.2023 | ||
RS | 22.11.2023 | ||
SE | 22.11.2023 | ||
SK | 22.11.2023 | ||
SM | 22.11.2023 | ||
BG | 22.02.2024 | ||
NO | 22.02.2024 | ||
GR | 23.02.2024 | ||
IS | 22.03.2024 | ||
PT | 22.03.2024 | ||
Former [2024/35] | AT | 22.11.2023 | |
CZ | 22.11.2023 | ||
DK | 22.11.2023 | ||
EE | 22.11.2023 | ||
ES | 22.11.2023 | ||
HR | 22.11.2023 | ||
LT | 22.11.2023 | ||
LV | 22.11.2023 | ||
NL | 22.11.2023 | ||
PL | 22.11.2023 | ||
RO | 22.11.2023 | ||
RS | 22.11.2023 | ||
SE | 22.11.2023 | ||
SM | 22.11.2023 | ||
BG | 22.02.2024 | ||
NO | 22.02.2024 | ||
GR | 23.02.2024 | ||
IS | 22.03.2024 | ||
PT | 22.03.2024 | ||
Former [2024/33] | AT | 22.11.2023 | |
DK | 22.11.2023 | ||
ES | 22.11.2023 | ||
HR | 22.11.2023 | ||
LT | 22.11.2023 | ||
LV | 22.11.2023 | ||
NL | 22.11.2023 | ||
PL | 22.11.2023 | ||
RS | 22.11.2023 | ||
SE | 22.11.2023 | ||
SM | 22.11.2023 | ||
BG | 22.02.2024 | ||
NO | 22.02.2024 | ||
GR | 23.02.2024 | ||
IS | 22.03.2024 | ||
PT | 22.03.2024 | ||
Former [2024/27] | AT | 22.11.2023 | |
ES | 22.11.2023 | ||
HR | 22.11.2023 | ||
LT | 22.11.2023 | ||
LV | 22.11.2023 | ||
NL | 22.11.2023 | ||
PL | 22.11.2023 | ||
RS | 22.11.2023 | ||
SE | 22.11.2023 | ||
BG | 22.02.2024 | ||
NO | 22.02.2024 | ||
GR | 23.02.2024 | ||
IS | 22.03.2024 | ||
PT | 22.03.2024 | ||
Former [2024/23] | AT | 22.11.2023 | |
ES | 22.11.2023 | ||
LT | 22.11.2023 | ||
NL | 22.11.2023 | ||
BG | 22.02.2024 | ||
GR | 23.02.2024 | ||
IS | 22.03.2024 | ||
PT | 22.03.2024 | ||
Former [2024/21] | LT | 22.11.2023 | |
NL | 22.11.2023 | ||
BG | 22.02.2024 | ||
GR | 23.02.2024 | ||
IS | 22.03.2024 | ||
Former [2024/20] | GR | 23.02.2024 | |
IS | 22.03.2024 | Documents cited: | Search | [I]US2012134395 (VARADARAJAN BADRI N [US], et al) [I] 1,2,6,9,10 * paragraphs [0034] , [0055] - [0057]; figures 9,10 *; | [A]US2014105313 (KIM IL HAN [US], et al) [A] 1-10 * paragraphs [0070] - [0076] *; | [A]EP3104569 (SAGEMCOM ENERGY & TELECOM SAS [FR]) [A] 1-10 * paragraphs [0024] , [0028]; figure 1e *; | [A]CN109039378 (JIANGSU LINYANG ENERGY CO LTD) [A] 1-10* abstract * | Examination | - Warranties No ET AL, "HomePlug AV Specification Contents", IN NO EVENT SHALL THE AUTHORS, DISTRIBUTORS, OR ANY COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR ANY LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SPECIFICATION OR THE USE OR O, (20140221), pages 1 - 858, URL: https://docbox.etsi.org/Reference/homeplug_av21/homeplug_av21_specification_final_public.pdf, (20220105), XP055876383 |