blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3933517

EP3933517 - DYNAMIC MODIFICATION OF PRODUCTION PLANS RESPONSIVE TO MANUFACTURING DEVIATIONS [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  02.08.2024
Database last updated on 13.09.2024
FormerRequest for examination was made
Status updated on  27.05.2022
FormerThe application has been published
Status updated on  03.12.2021
Most recent event   Tooltip07.08.2024New entry: Despatch of examination report + time limit 
Applicant(s)For all designated states
The Boeing Company
929 Long Bridge Drive
Arlington, VA 22202 / US
[2023/12]
Former [2022/01]For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606 / US
Inventor(s)01 / KAPILA, Vivek
Chicago, 60606-1596 / US
02 / DOSTERT, Stephen
Chicago, 60606-1596 / US
 [2022/01]
Representative(s)St Clair Jones, Gregory Arthur Langley
Kilburn & Strode LLP
Lacon London
84 Theobalds Road
London WC1X 8NL / GB
[2022/01]
Application number, filing date21193136.518.06.2018
[2022/01]
Priority number, dateUS20171562711219.06.2017         Original published format: US201715627112
[2022/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3933517
Date:05.01.2022
Language:EN
[2022/01]
Search report(s)(Supplementary) European search report - dispatched on:EP09.11.2021
ClassificationIPC:G05B19/00, G06Q50/04
[2022/01]
CPC:
G05B19/00 (EP,US); G05B19/41865 (KR); G05B19/404 (CN);
G05B19/27 (US); G05B19/41815 (KR); G05B19/4183 (KR);
G06Q50/04 (EP,CN,US); G05B2219/35519 (US); Y02P90/02 (EP);
Y02P90/30 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/26]
Former [2022/01]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:DYNAMISCHE MODIFIKATION VON PRODUKTIONSPLÄNEN IN REAKTION AUF FERTIGUNGSABWEICHUNGEN[2022/01]
English:DYNAMIC MODIFICATION OF PRODUCTION PLANS RESPONSIVE TO MANUFACTURING DEVIATIONS[2022/01]
French:MODIFICATION DYNAMIQUE DE PLANS DE PRODUCTION SENSIBLE AUX ÉCARTS DE FABRICATION[2022/01]
Examination procedure23.05.2022Amendment by applicant (claims and/or description)
23.05.2022Examination requested  [2022/26]
23.05.2022Date on which the examining division has become responsible
06.08.2024Despatch of a communication from the examining division (Time limit: M04)
Parent application(s)   TooltipEP18178211.1  / EP3418823
Fees paidRenewal fee
25.08.2021Renewal fee patent year 03
25.08.2021Renewal fee patent year 04
27.06.2022Renewal fee patent year 05
27.06.2023Renewal fee patent year 06
27.06.2024Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]WO03058532  (KIMBERLY CLARK CO [US]);
 [A]WO2005022281  (BOEING CO [US], et al);
 [A]US7242995  (MORGENSON JAMES E [US], et al);
 [A]EP2019371  (BOEING CO [US]);
 [I]EP2144197  (PALO ALTO RES CT INC [US]);
 [I]EP2161637  (SIEMENS AG [DE]);
 [A]EP2863280  (BOEING CO [US]);
 [A]US2016207202  (LEE TRISTAN E [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.