EP3962121 - SYSTEMS AND METHODS FOR ASSOCIATING OPERATORS WITH MACHINERY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.04.2024 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 28.04.2023 | ||
Former | Grant of patent is intended Status updated on 26.02.2023 | ||
Former | Request for examination was made Status updated on 26.08.2022 | ||
Former | The application has been published Status updated on 28.01.2022 | Most recent event Tooltip | 12.07.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 14.08.2024 [2024/33] | Applicant(s) | For all designated states Hyster-Yale Group, Inc. 4000 N.E. Blue Lake Road Fairview, OR 97024 / US | [2022/09] | Inventor(s) | 01 /
DRAAYER, Nicholas M. Fairview, OR 97024 / US | 02 /
MCDERMOTT, Ryan P. Fairview, OR 97024 / US | [2022/09] | Representative(s) | Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2022/09] | Application number, filing date | 21193513.5 | 27.08.2021 | [2022/09] | Priority number, date | US202063071016P | 27.08.2020 Original published format: US 202063071016 P | [2022/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3962121 | Date: | 02.03.2022 | Language: | EN | [2022/09] | Type: | B1 Patent specification | No.: | EP3962121 | Date: | 31.05.2023 | Language: | EN | [2023/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.01.2022 | Classification | IPC: | H04W4/02, G08B21/22, // F16P3/14 | [2022/09] | CPC: |
H04W4/023 (EP,US);
F16P3/141 (EP);
F16P3/142 (EP);
F16P3/144 (EP);
F16P3/147 (EP);
H04W4/06 (US);
H04W4/80 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/39] |
Former [2022/09] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEME UND VERFAHREN ZUM ZUORDNEN VON BEDIENERN ZU MASCHINEN | [2022/09] | English: | SYSTEMS AND METHODS FOR ASSOCIATING OPERATORS WITH MACHINERY | [2022/09] | French: | SYSTÈMES ET PROCÉDÉS PERMETTANT D'ASSOCIER DES OPÉRATEURS AVEC DES MACHINES | [2022/09] | Examination procedure | 18.08.2022 | Amendment by applicant (claims and/or description) | 18.08.2022 | Examination requested [2022/39] | 18.08.2022 | Date on which the examining division has become responsible | 27.02.2023 | Communication of intention to grant the patent | 19.04.2023 | Fee for grant paid | 19.04.2023 | Fee for publishing/printing paid | 19.04.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 01.03.2024 | No opposition filed within time limit [2024/19] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 31.05.2023 | CZ | 31.05.2023 | DK | 31.05.2023 | EE | 31.05.2023 | ES | 31.05.2023 | FI | 31.05.2023 | HR | 31.05.2023 | LT | 31.05.2023 | LV | 31.05.2023 | MC | 31.05.2023 | NL | 31.05.2023 | PL | 31.05.2023 | RO | 31.05.2023 | RS | 31.05.2023 | SE | 31.05.2023 | SI | 31.05.2023 | SK | 31.05.2023 | SM | 31.05.2023 | IE | 27.08.2023 | LU | 27.08.2023 | NO | 31.08.2023 | GR | 01.09.2023 | IS | 30.09.2023 | PT | 02.10.2023 | [2024/33] |
Former [2024/27] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
MC | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
LU | 27.08.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/21] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
MC | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
LU | 27.08.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/16] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
MC | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/10] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/08] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2024/03] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2024/01] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/52] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/51] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/50] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
PL | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/48] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
Former [2023/46] | ES | 31.05.2023 | Documents cited: | Search | [X]US2011279261 (GAUGER DEREK K [CA], et al); | [XAI]JP2015209718 (SUMITOMO CONSTR MACHINERY MFG); | [A]US2016232771 (MENDIOLA MICHAEL J [US], et al) |