| EP4002924 - COMMUNICATION METHOD, APPARATUS, AND SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.10.2025 Database last updated on 30.03.2026 | |
| Former | The patent has been granted Status updated on 01.11.2024 | ||
| Former | Grant of patent is intended Status updated on 27.06.2024 | ||
| Former | Request for examination was made Status updated on 05.06.2024 | ||
| Former | Grant of patent is intended Status updated on 07.02.2024 | ||
| Former | Request for examination was made Status updated on 22.04.2022 | Most recent event Tooltip | 23.01.2026 | Lapse of the patent in a contracting state New state(s): IE | published on 25.02.2026 [2026/09] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | [2022/21] | Inventor(s) | 01 /
Yu, Fang Shenzhen, 518129 / CN | 02 /
Li, Yan Shenzhen, 518129 / CN | [2022/21] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2022/21] | Application number, filing date | 21196497.8 | 21.01.2019 | [2022/21] | Priority number, date | CN201810313059 | 09.04.2018 Original published format: CN201810313059 | CN201810483383 | 18.05.2018 Original published format: CN201810483383 | [2022/21] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4002924 | Date: | 25.05.2022 | Language: | EN | [2022/21] | Type: | B1 Patent specification | No.: | EP4002924 | Date: | 04.12.2024 | Language: | EN | [2024/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.04.2022 | Classification | IPC: | H04W48/16, H04W8/18, H04W8/26, H04W60/00 | [2022/21] | CPC: |
H04W48/18 (EP,CN,KR);
H04W48/16 (EP,KR);
H04W36/0022 (CN,KR);
H04W16/10 (KR,US);
H04W36/14 (CN);
H04W36/1443 (KR);
H04W48/12 (US);
H04W60/00 (US);
H04W60/002 (EP,CN,KR);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/21]
| Title | German: | KOMMUNIKATIONSVERFAHREN, -VORRICHTUNG UND -SYSTEM | [2022/21] | English: | COMMUNICATION METHOD, APPARATUS, AND SYSTEM | [2022/21] | French: | PROCÉDÉ, APPAREIL ET SYSTÈME DE COMMUNICATION | [2022/21] | Examination procedure | 14.09.2021 | Examination requested [2022/21] | 09.06.2022 | Amendment by applicant (claims and/or description) | 09.06.2022 | Date on which the examining division has become responsible | 08.02.2024 | Communication of intention to grant the patent | 05.06.2024 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.06.2024 | Communication of intention to grant the patent | 28.10.2024 | Fee for grant paid | 28.10.2024 | Fee for publishing/printing paid | 28.10.2024 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP19761722.8 / EP3582555 | Opposition(s) | 05.09.2025 | No opposition filed within time limit [2025/46] | Fees paid | Renewal fee | 14.09.2021 | Renewal fee patent year 03 | 26.01.2022 | Renewal fee patent year 04 | 23.01.2023 | Renewal fee patent year 05 | 19.01.2024 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 04.12.2024 | ES | 04.12.2024 | HR | 04.12.2024 | MC | 04.12.2024 | PL | 04.12.2024 | SK | 04.12.2024 | SM | 04.12.2024 | IE | 21.01.2025 | CH | 31.01.2025 | GB | 04.03.2025 | NO | 04.03.2025 | RS | 04.03.2025 | GR | 05.03.2025 | IS | 04.04.2025 | [2026/09] |
| Former [2026/08] | CZ | 04.12.2024 | |
| ES | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| MC | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| CH | 31.01.2025 | ||
| GB | 04.03.2025 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| Former [2025/48] | CZ | 04.12.2024 | |
| ES | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| MC | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| CH | 31.01.2025 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| Former [2025/43] | CZ | 04.12.2024 | |
| ES | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| MC | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| Former [2025/36] | CZ | 04.12.2024 | |
| ES | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| Former [2025/34] | ES | 04.12.2024 | |
| HR | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| Former [2025/33] | ES | 04.12.2024 | |
| HR | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| Former [2025/32] | ES | 04.12.2024 | |
| HR | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| Former [2025/23] | ES | 04.12.2024 | |
| HR | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| Former [2025/22] | ES | 04.12.2024 | |
| HR | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| Former [2025/21] | ES | 04.12.2024 | |
| HR | 04.12.2024 | Documents cited: | Search | [A] WO2018034924 (IDAC HOLDINGS INC et al.) | [A] "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; System Architecture for the 5G System; Stage 2 (Release 15)", 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 23.501, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. SA WG2, no. V15.1.0, 28 March 2018 (2018-03-28), pages 1 - 201, XP051450586 | [A] TELECOM ITALIA ET AL: "Update of UE Network slicing configuration", vol. SA WG2, no. Montreal, Canada; 20180226 - 20180302, 28 February 2018 (2018-02-28), XP051394173, Retrieved from the Internet | [A] ZTE ET AL: "Clarifications of Subscribed and Configured S-NSSAI update", vol. SA WG2, no. Montreal, Canada; 20180226 - 20180302, 19 March 2018 (2018-03-19), XP051412023, Retrieved from the Internet | by applicant | CN201810483383 | CN201810313059 |