blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4000863

EP4000863 - TREATMENT PLANT FOR A FLEXIBLE MATERIAL SHEET WHICH CAN BE PASSED THROUGH A TREATMENT FURNACE, ESPECIALLY A PLASTIC FILM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.11.2023
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  16.12.2022
FormerGrant of patent is intended
Status updated on  01.08.2022
FormerRequest for examination was made
Status updated on  13.05.2022
FormerThe application has been published
Status updated on  22.04.2022
Most recent event   Tooltip05.07.2024Lapse of the patent in a contracting state
New state(s): MC
published on 07.08.2024  [2024/32]
Applicant(s)For all designated states
Brückner Maschinenbau GmbH
Königsberger Strasse 5-7
83313 Siegsdorf / DE
[2023/28]
Former [2022/21]For all designated states
Brückner Maschinenbau GmbH & Co. KG
Königsberger Strasse 5-7
83313 Siegsdorf / DE
Inventor(s)01 / Höglauer, Christoph
83329 Waging am See / DE
 [2022/21]
Representative(s)Flach Bauer & Partner Patentanwälte mbB
Adlzreiterstraße 11
83022 Rosenheim / DE
[2023/03]
Former [2022/21]Flach Bauer Stahl Patentanwälte Partnerschaft mbB
Adlzreiterstraße 11
83022 Rosenheim / DE
Application number, filing date21207178.109.11.2021
[2022/21]
Priority number, dateDE20201013063119.11.2020         Original published format: DE102020130631
[2022/21]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP4000863
Date:25.05.2022
Language:DE
[2022/21]
Type: B1 Patent specification 
No.:EP4000863
Date:18.01.2023
Language:DE
[2023/03]
Search report(s)(Supplementary) European search report - dispatched on:EP14.04.2022
ClassificationIPC:B29C55/08, B29C55/10
[2022/21]
CPC:
B29C55/08 (EP,KR); B29C55/02 (KR); B29C35/0277 (CN);
B29C35/06 (US); B05B13/0278 (US); B29C31/008 (KR);
B29C35/045 (US); B29C35/16 (KR); B29C55/10 (EP);
B29C55/165 (US); B29C55/20 (KR); B29C71/02 (KR);
F27B9/028 (US); F27B9/28 (US); B29C2035/1666 (KR);
B29C55/045 (KR); B29L2007/008 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/24]
Former [2022/21]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BEHANDLUNGSANLAGE FÜR EINE DURCH EINEN BEHANDLUNGSOFEN HINDURCHFÜHRBARE FLEXIBLE MATERIALBAHN, INSBESONDERE KUNSTSTOFFFOLIE[2022/21]
English:TREATMENT PLANT FOR A FLEXIBLE MATERIAL SHEET WHICH CAN BE PASSED THROUGH A TREATMENT FURNACE, ESPECIALLY A PLASTIC FILM[2022/21]
French:INSTALLATION DE TRAITEMENT POUR UNE BANDE DE MATIÈRE FLEXIBLE POUVANT ÊTRE GUIDÉE VERS UN FOUR DE TRAITEMENT, EN PARTICULIER FEUILLE EN MATIÈRE PLASTIQUE[2022/21]
Examination procedure05.05.2022Examination requested  [2022/24]
05.05.2022Date on which the examining division has become responsible
02.08.2022Communication of intention to grant the patent
08.11.2022Fee for grant paid
08.11.2022Fee for publishing/printing paid
08.11.2022Receipt of the translation of the claim(s)
Opposition(s)19.10.2023No opposition filed within time limit [2023/52]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ18.01.2023
DK18.01.2023
EE18.01.2023
ES18.01.2023
FI18.01.2023
HR18.01.2023
LT18.01.2023
LV18.01.2023
MC18.01.2023
NL18.01.2023
RO18.01.2023
RS18.01.2023
SE18.01.2023
SI18.01.2023
SK18.01.2023
SM18.01.2023
NO18.04.2023
GR19.04.2023
IS18.05.2023
PT18.05.2023
[2024/32]
Former [2024/11]CZ18.01.2023
DK18.01.2023
EE18.01.2023
ES18.01.2023
FI18.01.2023
HR18.01.2023
LT18.01.2023
LV18.01.2023
NL18.01.2023
RO18.01.2023
RS18.01.2023
SE18.01.2023
SI18.01.2023
SK18.01.2023
SM18.01.2023
NO18.04.2023
GR19.04.2023
IS18.05.2023
PT18.05.2023
Former [2023/50]CZ18.01.2023
DK18.01.2023
EE18.01.2023
ES18.01.2023
FI18.01.2023
HR18.01.2023
LT18.01.2023
LV18.01.2023
NL18.01.2023
RO18.01.2023
RS18.01.2023
SE18.01.2023
SK18.01.2023
SM18.01.2023
NO18.04.2023
GR19.04.2023
IS18.05.2023
PT18.05.2023
Former [2023/49]CZ18.01.2023
DK18.01.2023
EE18.01.2023
ES18.01.2023
FI18.01.2023
HR18.01.2023
LT18.01.2023
LV18.01.2023
NL18.01.2023
RO18.01.2023
RS18.01.2023
SE18.01.2023
SM18.01.2023
NO18.04.2023
GR19.04.2023
IS18.05.2023
PT18.05.2023
Former [2023/48]DK18.01.2023
EE18.01.2023
ES18.01.2023
FI18.01.2023
HR18.01.2023
LT18.01.2023
LV18.01.2023
NL18.01.2023
RS18.01.2023
SE18.01.2023
SM18.01.2023
NO18.04.2023
GR19.04.2023
IS18.05.2023
PT18.05.2023
Former [2023/46]DK18.01.2023
ES18.01.2023
FI18.01.2023
HR18.01.2023
LT18.01.2023
LV18.01.2023
NL18.01.2023
RS18.01.2023
SE18.01.2023
SM18.01.2023
NO18.04.2023
GR19.04.2023
IS18.05.2023
PT18.05.2023
Former [2023/39]ES18.01.2023
FI18.01.2023
HR18.01.2023
LT18.01.2023
LV18.01.2023
NL18.01.2023
RS18.01.2023
SE18.01.2023
NO18.04.2023
GR19.04.2023
IS18.05.2023
PT18.05.2023
Former [2023/37]ES18.01.2023
FI18.01.2023
HR18.01.2023
LT18.01.2023
LV18.01.2023
NL18.01.2023
RS18.01.2023
SE18.01.2023
NO18.04.2023
GR19.04.2023
PT18.05.2023
Former [2023/36]ES18.01.2023
FI18.01.2023
HR18.01.2023
LT18.01.2023
LV18.01.2023
NL18.01.2023
RS18.01.2023
SE18.01.2023
NO18.04.2023
PT18.05.2023
Former [2023/35]ES18.01.2023
HR18.01.2023
LT18.01.2023
NL18.01.2023
RS18.01.2023
NO18.04.2023
PT18.05.2023
Former [2023/34]ES18.01.2023
LT18.01.2023
NL18.01.2023
RS18.01.2023
PT18.05.2023
Former [2023/33]ES18.01.2023
LT18.01.2023
NL18.01.2023
Former [2023/31]NL18.01.2023
Documents cited:Search[A]US3181250  (HILMAR VITS);
 [AD]EP1616690  (MITSUBISHI HEAVY IND LTD [JP]);
 [A]WO2012067573  (ANDRITZ TECH & ASSET MAN GMBH [AT], et al)
by applicantDE9213802U
 EP1616690
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.