EP4000863 - TREATMENT PLANT FOR A FLEXIBLE MATERIAL SHEET WHICH CAN BE PASSED THROUGH A TREATMENT FURNACE, ESPECIALLY A PLASTIC FILM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.11.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 16.12.2022 | ||
Former | Grant of patent is intended Status updated on 01.08.2022 | ||
Former | Request for examination was made Status updated on 13.05.2022 | ||
Former | The application has been published Status updated on 22.04.2022 | Most recent event Tooltip | 05.07.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 07.08.2024 [2024/32] | Applicant(s) | For all designated states Brückner Maschinenbau GmbH Königsberger Strasse 5-7 83313 Siegsdorf / DE | [2023/28] |
Former [2022/21] | For all designated states Brückner Maschinenbau GmbH & Co. KG Königsberger Strasse 5-7 83313 Siegsdorf / DE | Inventor(s) | 01 /
Höglauer, Christoph 83329 Waging am See / DE | [2022/21] | Representative(s) | Flach Bauer & Partner Patentanwälte mbB Adlzreiterstraße 11 83022 Rosenheim / DE | [2023/03] |
Former [2022/21] | Flach Bauer Stahl Patentanwälte Partnerschaft mbB Adlzreiterstraße 11 83022 Rosenheim / DE | Application number, filing date | 21207178.1 | 09.11.2021 | [2022/21] | Priority number, date | DE202010130631 | 19.11.2020 Original published format: DE102020130631 | [2022/21] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP4000863 | Date: | 25.05.2022 | Language: | DE | [2022/21] | Type: | B1 Patent specification | No.: | EP4000863 | Date: | 18.01.2023 | Language: | DE | [2023/03] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.04.2022 | Classification | IPC: | B29C55/08, B29C55/10 | [2022/21] | CPC: |
B29C55/08 (EP,KR);
B29C55/02 (KR);
B29C35/0277 (CN);
B29C35/06 (US);
B05B13/0278 (US);
B29C31/008 (KR);
B29C35/045 (US);
B29C35/16 (KR);
B29C55/10 (EP);
B29C55/165 (US);
B29C55/20 (KR);
B29C71/02 (KR);
F27B9/028 (US);
F27B9/28 (US);
B29C2035/1666 (KR);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/24] |
Former [2022/21] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BEHANDLUNGSANLAGE FÜR EINE DURCH EINEN BEHANDLUNGSOFEN HINDURCHFÜHRBARE FLEXIBLE MATERIALBAHN, INSBESONDERE KUNSTSTOFFFOLIE | [2022/21] | English: | TREATMENT PLANT FOR A FLEXIBLE MATERIAL SHEET WHICH CAN BE PASSED THROUGH A TREATMENT FURNACE, ESPECIALLY A PLASTIC FILM | [2022/21] | French: | INSTALLATION DE TRAITEMENT POUR UNE BANDE DE MATIÈRE FLEXIBLE POUVANT ÊTRE GUIDÉE VERS UN FOUR DE TRAITEMENT, EN PARTICULIER FEUILLE EN MATIÈRE PLASTIQUE | [2022/21] | Examination procedure | 05.05.2022 | Examination requested [2022/24] | 05.05.2022 | Date on which the examining division has become responsible | 02.08.2022 | Communication of intention to grant the patent | 08.11.2022 | Fee for grant paid | 08.11.2022 | Fee for publishing/printing paid | 08.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 19.10.2023 | No opposition filed within time limit [2023/52] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 18.01.2023 | DK | 18.01.2023 | EE | 18.01.2023 | ES | 18.01.2023 | FI | 18.01.2023 | HR | 18.01.2023 | LT | 18.01.2023 | LV | 18.01.2023 | MC | 18.01.2023 | NL | 18.01.2023 | RO | 18.01.2023 | RS | 18.01.2023 | SE | 18.01.2023 | SI | 18.01.2023 | SK | 18.01.2023 | SM | 18.01.2023 | NO | 18.04.2023 | GR | 19.04.2023 | IS | 18.05.2023 | PT | 18.05.2023 | [2024/32] |
Former [2024/11] | CZ | 18.01.2023 | |
DK | 18.01.2023 | ||
EE | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RO | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SI | 18.01.2023 | ||
SK | 18.01.2023 | ||
SM | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/50] | CZ | 18.01.2023 | |
DK | 18.01.2023 | ||
EE | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RO | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SK | 18.01.2023 | ||
SM | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/49] | CZ | 18.01.2023 | |
DK | 18.01.2023 | ||
EE | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RO | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SM | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/48] | DK | 18.01.2023 | |
EE | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SM | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/46] | DK | 18.01.2023 | |
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SM | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/39] | ES | 18.01.2023 | |
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/37] | ES | 18.01.2023 | |
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
PT | 18.05.2023 | ||
Former [2023/36] | ES | 18.01.2023 | |
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
NO | 18.04.2023 | ||
PT | 18.05.2023 | ||
Former [2023/35] | ES | 18.01.2023 | |
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
NO | 18.04.2023 | ||
PT | 18.05.2023 | ||
Former [2023/34] | ES | 18.01.2023 | |
LT | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
PT | 18.05.2023 | ||
Former [2023/33] | ES | 18.01.2023 | |
LT | 18.01.2023 | ||
NL | 18.01.2023 | ||
Former [2023/31] | NL | 18.01.2023 | Documents cited: | Search | [A]US3181250 (HILMAR VITS); | [AD]EP1616690 (MITSUBISHI HEAVY IND LTD [JP]); | [A]WO2012067573 (ANDRITZ TECH & ASSET MAN GMBH [AT], et al) | by applicant | DE9213802U | EP1616690 |