EP4027579 - SPATIAL WEB OF TRUST KEY INITIALIZATION METHOD FOR SENSOR PLATFORM ARRAY USING DIRECTED CLOSE-FIELD COMMUNICATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.05.2024 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 09.06.2023 | ||
Former | Grant of patent is intended Status updated on 19.02.2023 | ||
Former | Request for examination was made Status updated on 06.01.2023 | ||
Former | The application has been published Status updated on 10.06.2022 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states The Boeing Company 929 Long Bridge Drive Arlington, VA 22202 / US | [2023/12] |
Former [2022/28] | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-1596 / US | Inventor(s) | 01 /
Kimberly, Gregory A. Chicago 60606-1596 / US | [2023/28] |
Former [2022/28] | 01 /
Kimberly, Gregory A. Chicago, 60606-1596 / US | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Postfach 10 54 62 70047 Stuttgart / DE | [2022/28] | Application number, filing date | 21208400.8 | 16.11.2021 | [2022/28] | Priority number, date | US202163136012P | 11.01.2021 Original published format: US 202163136012 P | [2022/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4027579 | Date: | 13.07.2022 | Language: | EN | [2022/28] | Type: | B1 Patent specification | No.: | EP4027579 | Date: | 12.07.2023 | Language: | EN | [2023/28] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.04.2022 | Classification | IPC: | H04L9/40, // B64C39/02 | [2022/28] | CPC: |
H04L63/061 (EP);
H04W12/009 (CN);
H04W12/66 (US);
G05D1/104 (US);
G05D1/695 (US);
H04W12/03 (CN);
H04W12/0471 (CN);
H04W12/65 (US);
H04W12/71 (US);
H04W4/38 (US);
H04W76/14 (US);
H04W76/15 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/06] |
Former [2022/28] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR INITIALISIERUNG EINES RÄUMLICHEN VERTRAUENSSCHLÜSSELNETZES FÜR EINE SENSORPLATTFORMANORDNUNG UNTER VERWENDUNG VON GERICHTETER NAHFELDKOMMUNIKATION | [2022/28] | English: | SPATIAL WEB OF TRUST KEY INITIALIZATION METHOD FOR SENSOR PLATFORM ARRAY USING DIRECTED CLOSE-FIELD COMMUNICATION | [2022/28] | French: | PROCÉDÉ D'INITIALISATION DE LA CLÉ D'UN RÉSEAU SPATIAL DE CONFIANCE POUR UN RÉSEAU DE PLATES-FORMES DE CAPTEURS UTILISANT LA COMMUNICATION DIRIGÉE EN CHAMP PROCHE | [2022/28] | Examination procedure | 05.01.2023 | Amendment by applicant (claims and/or description) | 05.01.2023 | Examination requested [2023/06] | 05.01.2023 | Date on which the examining division has become responsible | 20.02.2023 | Communication of intention to grant the patent | 05.06.2023 | Fee for grant paid | 05.06.2023 | Fee for publishing/printing paid | 05.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 15.04.2024 | No opposition filed within time limit [2024/25] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 12.07.2023 | BG | 12.07.2023 | CZ | 12.07.2023 | DK | 12.07.2023 | EE | 12.07.2023 | ES | 12.07.2023 | FI | 12.07.2023 | HR | 12.07.2023 | IT | 12.07.2023 | LT | 12.07.2023 | LV | 12.07.2023 | MC | 12.07.2023 | NL | 12.07.2023 | PL | 12.07.2023 | RO | 12.07.2023 | RS | 12.07.2023 | SE | 12.07.2023 | SI | 12.07.2023 | SK | 12.07.2023 | SM | 12.07.2023 | NO | 12.10.2023 | GR | 13.10.2023 | IS | 12.11.2023 | PT | 13.11.2023 | IE | 16.11.2023 | LU | 16.11.2023 | BE | 30.11.2023 | [2024/51] |
Former [2024/47] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
IT | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
MC | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SI | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
IE | 16.11.2023 | ||
LU | 16.11.2023 | ||
BE | 30.11.2023 | ||
Former [2024/36] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
IT | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
MC | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SI | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
LU | 16.11.2023 | ||
Former [2024/35] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
IT | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
MC | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
LU | 16.11.2023 | ||
Former [2024/32] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
IT | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
MC | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/27] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
IT | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/23] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/22] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/20] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/10] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
NL | 12.07.2023 | ||
PL | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/09] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
LT | 12.07.2023 | ||
NL | 12.07.2023 | ||
SE | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
Former [2024/08] | LT | 12.07.2023 | |
NL | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
Former [2024/05] | NL | 12.07.2023 | Documents cited: | Search | [A]US9646502 (GENTRY NICHOLAS KRISTOFER [US]) [A] 1-15 * columns 2, 7, 8 *; | [A] - Gatewood Hunter C, "Scalable Key Management for Tactical Swarms", (20190524), URL: https://dspace.mit.edu/bitstream/handle/1721.1/123141/1128823189-MIT.pdf?sequence=1&isAllowed=y, (20220415), XP055913137 [A] 1-15 * Chapters 5, 8, and 9. * |