EP4006308 - DEVICE AND METHOD FOR CONTROLLING THE SECTORS FOR THE DISTRIBUTOR ASSEMBLY OF A TURBINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.07.2024 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 28.07.2023 | ||
Former | Grant of patent is intended Status updated on 10.05.2023 | ||
Former | Request for examination was made Status updated on 29.04.2022 | Most recent event Tooltip | 05.07.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 07.08.2024 [2024/32] | 05.07.2024 | No opposition filed within time limit | published on 07.08.2024 [2024/32] | Applicant(s) | For all designated states SAFRAN AIRCRAFT ENGINES 2 boulevard du Général Martial Valin 75015 Paris / FR | [2022/22] | Inventor(s) | 01 /
DE AGOSTINI, Enguerrand Frédéric 77550 MOISSY-CRAMAYEL / FR | 02 /
ALVES DE MATOS, Carlos 77550 MOISSY-CRAMAYEL / FR | 03 /
CHAUVEL, Florian 77550 MOISSY-CRAMAYEL / FR | 04 /
EPARVIER, Baptiste 77550 MOISSY-CRAMAYEL / FR | 05 /
GAGLIARDO, Mathias 77550 MOISSY-CRAMAYEL / FR | 06 /
WYSIDI, Abner 77550 MOISSY-CRAMAYEL / FR | [2022/22] | Representative(s) | Gevers & Orès Immeuble le Palatin 2 3 Cours du Triangle CS 80165 92939 Paris La Défense Cedex / FR | [2022/22] | Application number, filing date | 21210809.6 | 26.11.2021 | [2022/22] | Priority number, date | FR20200012269 | 27.11.2020 Original published format: FR 2012269 | [2022/22] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP4006308 | Date: | 01.06.2022 | Language: | FR | [2022/22] | Type: | B1 Patent specification | No.: | EP4006308 | Date: | 30.08.2023 | Language: | FR | [2023/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.04.2022 | Classification | IPC: | F01D9/04, F01D25/24 | [2022/22] | CPC: |
F01D9/04 (EP);
F01D25/28 (CN);
G06T7/001 (US);
F01D11/122 (US);
F01D25/24 (US);
F01D25/246 (EP);
F01D9/041 (CN);
F01D9/042 (EP,CN,US);
F05D2230/50 (EP);
F05D2230/51 (EP);
F05D2230/60 (EP,CN,US);
F05D2230/68 (EP);
F05D2240/14 (US);
F05D2250/283 (US);
F05D2260/30 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/22] | Title | German: | SEKTORKONTROLLVORRICHTUNG UND -VERFAHREN FÜR DEN ZUSAMMENBAU VON TURBINENLEITSCHAUFELN | [2022/22] | English: | DEVICE AND METHOD FOR CONTROLLING THE SECTORS FOR THE DISTRIBUTOR ASSEMBLY OF A TURBINE | [2022/22] | French: | DISPOSITIF ET PROCÉDÉ DE CONTRÔLE DES SECTEURS POUR L'ASSEMBLAGE DE DISTRIBUTEURS D'UNE TURBINE | [2023/23] |
Former [2022/22] | DISPOSITIF ET PROCEDE DE CONTROLE DES SECTEURS POUR L ASSEMBLAGE DE DISTRIBUTEURS D'UNE TURBINE | Examination procedure | 26.11.2021 | Examination requested [2022/22] | 30.11.2022 | Date on which the examining division has become responsible | 11.05.2023 | Communication of intention to grant the patent | 21.07.2023 | Fee for grant paid | 21.07.2023 | Fee for publishing/printing paid | 21.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2024 | No opposition filed within time limit [2024/32] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 30.08.2023 | CZ | 30.08.2023 | DK | 30.08.2023 | EE | 30.08.2023 | ES | 30.08.2023 | FI | 30.08.2023 | HR | 30.08.2023 | IT | 30.08.2023 | LT | 30.08.2023 | LV | 30.08.2023 | MC | 30.08.2023 | NL | 30.08.2023 | PL | 30.08.2023 | RO | 30.08.2023 | RS | 30.08.2023 | SE | 30.08.2023 | SK | 30.08.2023 | SM | 30.08.2023 | NO | 30.11.2023 | GR | 01.12.2023 | IS | 30.12.2023 | PT | 02.01.2024 | [2024/32] |
Former [2024/27] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
EE | 30.08.2023 | ||
ES | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
IT | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SK | 30.08.2023 | ||
SM | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
PT | 02.01.2024 | ||
Former [2024/23] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
EE | 30.08.2023 | ||
ES | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SK | 30.08.2023 | ||
SM | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
PT | 02.01.2024 | ||
Former [2024/22] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SM | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/20] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SM | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/14] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/10] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
PL | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/09] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
LT | 30.08.2023 | ||
SE | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/08] | LT | 30.08.2023 | |
NO | 30.11.2023 | ||
GR | 01.12.2023 | Documents cited: | Search | [A]EP2075721 (SNECMA SERVICES [FR]) [A] 1-10 * paragraphs [0005] - [0012] - [0018] - [0002] - [0058] - [0065]; figures 1,2,4 *; | [A]EP3023735 (MITSUBISHI HITACHI POWER SYS [JP]) [A] 1-10* paragraphs [0003] - [0006] - [0009] - [0012] - [0042] - [0044] - [0072] - [0074] - [0082]; figures 1,2 *; | [A]EP3517741 (SIEMENS AG [DE]) [A] 1-10 * paragraphs [0002] , [0004] , [0009] , [0020] , [0024] - [0027] - [0040] - [0042] - [0047] , [0050] , [0053]; figures 2,3 * | by applicant | EP2075721 | FR2938872 | FR3033827 | EP3517741 |