blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4012453

EP4012453 - LIDAR IMAGING SYSTEM WITH HETERODYNE DETECTION SUCH AS FMCW COMPRISING A REFERENCE SIGNAL PHASE CORRECTION DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.12.2023
Database last updated on 31.08.2024
FormerThe patent has been granted
Status updated on  30.12.2022
FormerGrant of patent is intended
Status updated on  17.11.2022
FormerRequest for examination was made
Status updated on  13.05.2022
Most recent event   Tooltip31.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 03.07.2024  [2024/27]
Applicant(s)For all designated states
Commissariat à l'énergie atomique et aux énergies alternatives
Bâtiment le Ponant
25, rue Leblanc
75015 Paris / FR
[2022/24]
Inventor(s)01 / DAAMI, Anis
38054 GRENOBLE Cedex 09 / FR
02 / FREY, Laurent
38054 GRENOBLE CEDEX 09 / FR
 [2022/24]
Representative(s)INNOV-GROUP
310, avenue Berthelot
69372 Lyon Cedex 08 / FR
[2022/24]
Application number, filing date21213574.310.12.2021
[2022/24]
Priority number, dateFR2020001312313.12.2020         Original published format: FR 2013123
[2022/24]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP4012453
Date:15.06.2022
Language:FR
[2022/24]
Type: B1 Patent specification 
No.:EP4012453
Date:01.02.2023
Language:FR
[2023/05]
Search report(s)(Supplementary) European search report - dispatched on:EP02.05.2022
ClassificationIPC:G01S17/34, G01S17/36, G01S17/894, G01S7/4912, G01S7/4914, G01S7/481, G01S7/491, G01S7/497
[2022/24]
CPC:
G01S17/34 (EP,US); G01S17/894 (EP,CN); G01S17/36 (EP);
G01S7/4811 (EP); G01S7/4814 (EP); G01S7/4816 (EP);
G01S7/4817 (US); G01S7/4818 (EP); G01S7/491 (EP,CN);
G01S7/4911 (CN,US); G01S7/4914 (EP); G01S7/4917 (EP,US);
G01S7/497 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/24]
TitleGerman:LIDAR-BILDGEBUNGSSYSTEM MIT HETERODYNER DETEKTION VOM TYP FMCW MIT EINER VORRICHTUNG ZUR PHASENKORREKTUR DES REFERENZSIGNALS[2022/24]
English:LIDAR IMAGING SYSTEM WITH HETERODYNE DETECTION SUCH AS FMCW COMPRISING A REFERENCE SIGNAL PHASE CORRECTION DEVICE[2022/24]
French:SYSTÈME IMAGEUR LIDAR À DÉTECTION HÉTÉRODYNE DE TYPE FMCW COMPORTANT UN DISPOSITIF DE CORRECTION DE PHASE DU SIGNAL DE RÉFÉRENCE[2022/50]
Former [2022/24]SYSTEME IMAGEUR LIDAR A DETECTION HETERODYNE DE TYPE FMCW COMPORTANT UN DISPOSITIF DE CORRECTION DE PHASE DU SIGNAL DE REFERENCE
Examination procedure10.12.2021Examination requested  [2022/24]
12.07.2022Date on which the examining division has become responsible
18.11.2022Communication of intention to grant the patent
23.12.2022Fee for grant paid
23.12.2022Fee for publishing/printing paid
23.12.2022Receipt of the translation of the claim(s)
Opposition(s)03.11.2023No opposition filed within time limit [2024/02]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT01.02.2023
CZ01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
IT01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RO01.02.2023
RS01.02.2023
SE01.02.2023
SI01.02.2023
SK01.02.2023
SM01.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
[2024/27]
Former [2024/11]AT01.02.2023
CZ01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RO01.02.2023
RS01.02.2023
SE01.02.2023
SI01.02.2023
SK01.02.2023
SM01.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/50]AT01.02.2023
CZ01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RO01.02.2023
RS01.02.2023
SE01.02.2023
SK01.02.2023
SM01.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/49]AT01.02.2023
CZ01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RO01.02.2023
RS01.02.2023
SE01.02.2023
SM01.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/48]AT01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RS01.02.2023
SE01.02.2023
SM01.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/46]AT01.02.2023
DK01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RS01.02.2023
SE01.02.2023
SM01.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/39]AT01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RS01.02.2023
SE01.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/38]AT01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RS01.02.2023
SE01.02.2023
NO01.05.2023
GR02.05.2023
PT01.06.2023
Former [2023/37]AT01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
RS01.02.2023
SE01.02.2023
NO01.05.2023
GR02.05.2023
PT01.06.2023
Former [2023/36]AT01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
RS01.02.2023
SE01.02.2023
NO01.05.2023
PT01.06.2023
Former [2023/35]AT01.02.2023
ES01.02.2023
HR01.02.2023
LT01.02.2023
NL01.02.2023
RS01.02.2023
NO01.05.2023
PT01.06.2023
Former [2023/34]ES01.02.2023
LT01.02.2023
RS01.02.2023
PT01.06.2023
Former [2023/33]ES01.02.2023
LT01.02.2023
Documents cited:Search[A]FR2677456  (THOMSON CSF [FR]) [A] 1-14* abstract *;
 [A]US2015177380  (SATYAN NARESH [US], et al) [A] 1-14 * abstract * * paragraphs [0028] - [0033] *;
 [A]US2020256995  (INOUE DAISUKE [JP], et al) [A] 1-14 * abstract * * paragraphs [0088] - [0090] *;
 [AD]  - FIROOZ AFLATOUNI ET AL, "Nanophotonic coherent imager", OPTICS EXPRESS, (20150219), vol. 23, no. 4, doi:10.1364/OE.23.005117, page 5117, XP055764834 [AD] 1-14 * the whole document *

DOI:   http://dx.doi.org/10.1364/OE.23.005117
by applicantFR2000408
 US2015177380
 US2020256995
    - AFLATOUNI et al., "Nonophotonic coherent imager", Opt. Express, (20150000), vol. 23, no. 4, pages 5117 - 5125
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.