Extract from the Register of European Patents

EP About this file: EP3967436

EP3967436 - COMPONENT FEED SYSTEM FOR PRESS WELDERS FOR RESISTANCE WELDING, AND PRESS WELDER COMPRISING SAID SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.08.2024
Database last updated on 28.02.2026
FormerThe patent has been granted
Status updated on  22.09.2023
FormerGrant of patent is intended
Status updated on  17.04.2023
FormerRequest for examination was made
Status updated on  16.09.2022
FormerThe application has been published
Status updated on  11.02.2022
Most recent event   Tooltip30.01.2026Lapse of the patent in a contracting state
New state(s): CY
published on 04.03.2026 [2026/10]
Applicant(s)For all designated states
Bosco Tecnoindustria S.L.
C/ Poniente, 62
Boecillo
47151 Valladolid / ES
[2022/11]
Inventor(s)01 / PITA GÓMEZ, Santiago
47012 Valladolid / ES
 [2022/11]
Representative(s)TRBL Intellectual Property
Glorieta de Quevedo, 8
28015 Madrid / ES
[N/P]
Former [2022/11]Tribalyte Ideas
Gta. Quevedo 8, 6°2
28015 Madrid / ES
Application number, filing date21382816.310.09.2021
[2022/11]
Priority number, dateES2020003092811.09.2020         Original published format: ES 202030928
[2022/11]
Filing languageES
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3967436
Date:16.03.2022
Language:EN
[2022/11]
Type: B1 Patent specification 
No.:EP3967436
Date:25.10.2023
Language:EN
[2023/43]
Search report(s)(Supplementary) European search report - dispatched on:EP10.02.2022
ClassificationIPC:B23K11/00, B23K11/14, B23K11/31, B23K11/36
[2022/11]
CPC:
B23K11/0053 (EP); B23K11/02 (ES); B23K11/004 (ES);
B23K11/14 (EP); B23K11/315 (EP); B23K11/36 (EP);
B23K9/206 (ES) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/42]  
Former [2022/11]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:BAUTEILZUFÜHRUNGSSYSTEM FÜR PRESSSCHWEISSGERÄTE ZUM WIDERSTANDSSCHWEISSEN UND PRESSSCHWEISSGERÄT MIT DIESEM SYSTEM[2022/11]
English:COMPONENT FEED SYSTEM FOR PRESS WELDERS FOR RESISTANCE WELDING, AND PRESS WELDER COMPRISING SAID SYSTEM[2022/11]
French:SYSTÈME D'ALIMENTATION EN COMPOSANTS DE PRESSES À SOUDER POUR LE SOUDAGE PAR RÉSISTANCE ET PRESSE À SOUDER COMPRENANT LEDIT SYSTÈME[2022/11]
Examination procedure08.09.2022Amendment by applicant (claims and/or description)
08.09.2022Examination requested  [2022/42]
08.09.2022Date on which the examining division has become responsible
18.04.2023Communication of intention to grant the patent
07.08.2023Fee for grant paid
07.08.2023Fee for publishing/printing paid
07.08.2023Receipt of the translation of the claim(s)
Opposition(s)26.07.2024No opposition filed within time limit [2024/40]
Fees paidRenewal fee
18.09.2023Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY10.09.2021
CZ25.10.2023
ES25.10.2023
HR25.10.2023
MC25.10.2023
RO25.10.2023
RS25.10.2023
SK25.10.2023
SM25.10.2023
NO25.01.2024
GR26.01.2024
IS25.02.2024
[2026/10]
Former [2025/22]CZ25.10.2023
ES25.10.2023
HR25.10.2023
MC25.10.2023
RO25.10.2023
RS25.10.2023
SK25.10.2023
SM25.10.2023
NO25.01.2024
GR26.01.2024
IS25.02.2024
Former [2024/36]CZ25.10.2023
ES25.10.2023
HR25.10.2023
RO25.10.2023
RS25.10.2023
SK25.10.2023
SM25.10.2023
NO25.01.2024
GR26.01.2024
IS25.02.2024
Former [2024/35]CZ25.10.2023
ES25.10.2023
HR25.10.2023
RO25.10.2023
RS25.10.2023
SM25.10.2023
NO25.01.2024
GR26.01.2024
IS25.02.2024
Former [2024/33]ES25.10.2023
HR25.10.2023
RS25.10.2023
SM25.10.2023
NO25.01.2024
GR26.01.2024
IS25.02.2024
Former [2024/27]ES25.10.2023
HR25.10.2023
RS25.10.2023
NO25.01.2024
GR26.01.2024
IS25.02.2024
Former [2024/20]GR26.01.2024
IS25.02.2024
Documents cited:Search[XI] GB1466015  (AOYAMA Y et al.)
 [XI] US4789768  (TOBITA HIDEAKI et al.)
 [X] JPH0938780  (AICHI KIKO KK et al.)
by applicantWO2007074561
 US6825436
 KR101200541
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.