blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4096050

EP4096050 - PLANT FOR THE PRODUCTION OF ELECTRICAL ENERGY AND METHOD FOR OPERATING SAID PLANT [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  02.06.2023
Database last updated on 30.10.2024
FormerThe application has been published
Status updated on  28.10.2022
Most recent event   Tooltip30.03.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
ANSALDO ENERGIA S.p.A.
Via Nicola Lorenzi 8
16152 Genova / IT
[2022/48]
Inventor(s)01 / Repetto, Enrico
16152 Genova / IT
02 / Giacchino, Alessandro
16152 Genova / IT
 [2022/48]
Representative(s)Studio Torta S.p.A., et al
Corso Magenta, 56
20123 Milano / IT
[N/P]
Former [2022/48]Andreotti, Erika, et al
Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
Application number, filing date21425027.624.05.2021
[2022/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4096050
Date:30.11.2022
Language:EN
[2022/48]
Search report(s)(Supplementary) European search report - dispatched on:EP23.11.2021
ClassificationIPC:H02J3/46, H02J3/28
[2022/48]
CPC:
H02J3/28 (EP,US); H02J3/46 (EP); H02J3/466 (US);
G06Q50/06 (US); H02J2300/22 (US); H02J2300/28 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/27]
Former [2022/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:ANLAGE FÜR DIE PRODUKTION VON ELEKTRISCHER ENERGIE UND VERFAHREN ZUM BETRIEB DER ANLAGE[2022/48]
English:PLANT FOR THE PRODUCTION OF ELECTRICAL ENERGY AND METHOD FOR OPERATING SAID PLANT[2022/48]
French:INSTALLATION DE PRODUCTION D'ÉNERGIE ÉLECTRIQUE ET PROCÉDÉ DE FONCTIONNEMENT DE LADITE INSTALLATION[2022/48]
Examination procedure30.05.2023Amendment by applicant (claims and/or description)
30.05.2023Examination requested  [2023/27]
30.05.2023Date on which the examining division has become responsible
Fees paidRenewal fee
24.11.2023Renewal fee patent year 03
29.03.2024Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
31.05.202303   M06   Fee paid on   24.11.2023
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US2016072291  (GOLDMAN ARNOLD J [IL]);
 [X]WO2019120396  (VESTAS WIND SYS AS [DK]);
 [XI]WO2020057702  (VESTAS WIND SYS AS [DK])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.