EP4103463 - MOORING SYSTEM AND METHOD [Right-click to bookmark this link] | Status | Grant of patent is intended Status updated on 04.11.2024 Database last updated on 02.11.2024 | |
Former | Examination is in progress Status updated on 23.02.2024 | ||
Former | Request for examination was made Status updated on 18.11.2022 | ||
Former | The international publication has been made Status updated on 20.08.2021 | ||
Former | unknown Status updated on 22.02.2021 | Most recent event Tooltip | 04.11.2024 | New entry: Communication of intention to grant a patent | Applicant(s) | For all designated states Orbital Marine Power Limited Innovation Centre Orkney Hatston Pier Road Kirkwall Orkney KW15 1ZL / GB | [2022/51] | Inventor(s) | 01 /
MILLER, Calum Orbital Marine Power Limited Innovation Centre Orkney Hatston Pier Road Kirkwall Orkney KW15 1ZL / GB | 02 /
CLOUSTON, David Orbital Marine Power Limited Innovation Centre Orkney Hatston Pier Road Kirkwall Orkney KW15 1ZL / GB | 03 /
HUGON, Thomas Orbital Marine Power Limited Innovation Centre Orkney Hatston Pier Road Kirkwall Orkney KW15 1ZL / GB | 04 /
ANNAL, William Orbital Marine Power Limited Innovation Centre Orkney Hatston Pier Road Kirkwall Orkney KW15 1ZL / GB | [2022/51] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [2022/51] | Application number, filing date | 21704907.1 | 04.02.2021 | [2022/51] | WO2021GB50240 | Priority number, date | GB20200001866 | 11.02.2020 Original published format: GB 202001866 | [2022/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2021160992 | Date: | 19.08.2021 | Language: | EN | [2021/33] | Type: | A1 Application with search report | No.: | EP4103463 | Date: | 21.12.2022 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.08.2021 takes the place of the publication of the European patent application. | [2022/51] | Search report(s) | International search report - published on: | EP | 19.08.2021 | Classification | IPC: | B63B21/04, B63B21/20, B63B21/50 | [2022/51] | CPC: |
B63B21/50 (EP,US);
B63B21/04 (EP,GB,US);
B63B21/00 (GB);
B63B21/20 (EP);
B63B2021/004 (US);
B63B2021/203 (US);
Y02E10/30 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/51] | Title | German: | VERANKERUNGSSYSTEM UND -VERFAHREN | [2022/51] | English: | MOORING SYSTEM AND METHOD | [2022/51] | French: | PROCÉDÉ ET SYSTÈME D'AMARRAGE | [2022/51] | Entry into regional phase | 31.08.2022 | National basic fee paid | 31.08.2022 | Designation fee(s) paid | 31.08.2022 | Examination fee paid | Examination procedure | 31.08.2022 | Examination requested [2022/51] | 31.08.2022 | Date on which the examining division has become responsible | 14.03.2023 | Amendment by applicant (claims and/or description) | 22.02.2024 | Despatch of a communication from the examining division (Time limit: M04) | 06.06.2024 | Reply to a communication from the examining division | 05.11.2024 | Communication of intention to grant the patent | Fees paid | Renewal fee | 31.08.2022 | Renewal fee patent year 03 | 07.12.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [X]JPS60240594 (NIPPON STEEL CORP); | [X]WO2018197882 (FLINTSTONE TECH LTD [GB]); | [XI]WO2019078725 (APL TECH AS [NO]) | by applicant | EP1882106 | EP2800685 | WO2018115806 |