blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4097465

EP4097465 - AUTOMATED COMPLIANCE MEASUREMENT AND CONTROL FOR LANDFILL GAS EXTRACTION SYSTEMS [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  16.02.2024
Database last updated on 02.11.2024
FormerRequest for examination was made
Status updated on  04.11.2022
FormerThe international publication has been made
Status updated on  06.08.2021
Formerunknown
Status updated on  22.02.2021
Most recent event   Tooltip29.07.2024New entry: Reply to examination report 
Applicant(s)For all designated states
Loci Controls, Inc.
14 Kendrick Road Suite 2
Wareham, MA 02571 / US
[2022/49]
Inventor(s)01 / QUIGLEY, Peter
32 Long Point Lane
Duxbury, MA 02332 / US
02 / MARTIN, Ian
31 Berkshire Ave
Sharon, MA 02067 / US
03 / ROWBOTTOM, Jack
52 Ocean View Avenue
Swansea, MA 02777 / US
04 / NEFF, Nicole
North Potomac, Maryland 20878 / US
 [2022/49]
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastraße 30
81925 München / DE
[2022/49]
Application number, filing date21705025.119.01.2021
[2022/49]
WO2021US13850
Priority number, dateUS202062967147P29.01.2020         Original published format: US 202062967147 P
[2022/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021154523
Date:05.08.2021
Language:EN
[2021/31]
Type: A1 Application with search report 
No.:EP4097465
Date:07.12.2022
Language:EN
The application published by WIPO in one of the EPO official languages on 05.08.2021 takes the place of the publication of the European patent application.
[2022/49]
Search report(s)International search report - published on:EP05.08.2021
ClassificationIPC:G01N33/00, B09B1/00, C10L3/08, E21B43/12
[2022/49]
CPC:
G01N33/0063 (EP); B09B1/006 (EP,US); B09C1/005 (EP);
G01N33/0068 (EP); Y02E50/30 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/49]
TitleGerman:AUTOMATISCHE NACHGIEBIGKEITSMESSUNG UND -STEUERUNG FÜR DEPONIEGASENTNAHMESYSTEME[2022/49]
English:AUTOMATED COMPLIANCE MEASUREMENT AND CONTROL FOR LANDFILL GAS EXTRACTION SYSTEMS[2022/49]
French:MESURE ET COMMANDE DE CONFORMITÉ AUTOMATISÉES POUR DES SYSTÈMES D'EXTRACTION DE GAZ D'ENFOUISSEMENT[2022/49]
Entry into regional phase01.08.2022National basic fee paid 
01.08.2022Designation fee(s) paid 
01.08.2022Examination fee paid 
Examination procedure01.08.2022Examination requested  [2022/49]
01.08.2022Date on which the examining division has become responsible
06.04.2023Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
16.06.2023Amendment by applicant (claims and/or description)
15.02.2024Despatch of a communication from the examining division (Time limit: M06)
29.07.2024Reply to a communication from the examining division
Request for further processing for:16.06.2023Request for further processing filed
16.06.2023Full payment received (date of receipt of payment)
Request granted
26.06.2023Decision despatched
Fees paidRenewal fee
27.01.2023Renewal fee patent year 03
29.01.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XI]US2001005812  (BROOKSHIRE RONALD L [US], et al) [X] 1-6,8,13,16,29-31,63,72-78,80,101-103,135,144 * abstract * * paragraph [0047] * [I] 7,9-12,14,15,17-28,32-35,40,41,56-62,65-71,79,81-100,104-107,112,113,128-134,137-143;
 [XI]WO2018194650  (LOCI CONTROLS INC [US]) [X] 1,36,37,73,108,109 * figures 12,14 * * pages 32,57 *[I] 38,39,110,111
by applicantUS10029290
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.