blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4189295

EP4189295 - METHOD TO CONTROL A CIRCULATION PUMP, IN PARTICULAR A HEATING PUMP [Right-click to bookmark this link]
Former [2023/23]METHOD FOR CONTROLLING A CIRCULATION PUMP, IN PARTICULAR A HEATING PUMP
[2024/15]
StatusThe patent has been granted
Status updated on  26.07.2024
Database last updated on 21.08.2024
FormerGrant of patent is intended
Status updated on  21.03.2024
FormerRequest for examination was made
Status updated on  05.05.2023
FormerThe international publication has been made
Status updated on  04.02.2022
Formerunknown
Status updated on  30.07.2021
Most recent event   Tooltip26.07.2024(Expected) grantpublished on 28.08.2024 [2024/35]
Applicant(s)For all designated states
KSB SE & Co. KGaA
Johann-Klein-Straße 9
67227 Frankenthal / DE
[2023/23]
Inventor(s)01 / ECKL, Martin
67227 Frankenthal / DE
02 / MÜLLER, Benedikt
67227 Frankenthal / DE
 [2023/23]
Application number, filing date21743458.812.07.2021
[2023/23]
WO2021EP69311
Priority number, dateDE20201012002229.07.2020         Original published format: DE102020120022
[2023/23]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2022023006
Date:03.02.2022
Language:DE
[2022/05]
Type: A1 Application with search report 
No.:EP4189295
Date:07.06.2023
Language:DE
The application published by WIPO in one of the EPO official languages on 03.02.2022 takes the place of the publication of the European patent application.
[2023/23]
Type: B1 Patent specification
No.:EP4189295
Date:28.08.2024
Language:DE
[2024/35]
Search report(s)International search report - published on:EP03.02.2022
ClassificationIPC:F24D19/10, F04D15/00
[2023/23]
CPC:
F04D15/0066 (EP); F04D15/0088 (EP); F05D2270/301 (EP);
F05D2270/701 (EP); F24D19/1012 (EP); Y02B30/70 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/23]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN ZUR REGELUNG EINER UMWÄLZPUMPE, INSBESONDERE HEIZUNGSPUMPE[2023/23]
English:METHOD TO CONTROL A CIRCULATION PUMP, IN PARTICULAR A HEATING PUMP[2024/15]
French:PROCÉDÉ DE CONTRÔLE D'UNE POMPE DE CIRCULATION, EN PARTICULIER D'UNE POMPE DE CHAUFFAGE[2024/15]
Former [2023/23]METHOD FOR CONTROLLING A CIRCULATION PUMP, IN PARTICULAR A HEATING PUMP
Former [2023/23]PROCÉDÉ DE RÉGULATION D'UNE POMPE DE CIRCULATION, EN PARTICULIER D'UNE POMPE DE CHAUFFAGE
Entry into regional phase03.01.2023National basic fee paid 
03.01.2023Designation fee(s) paid 
03.01.2023Examination fee paid 
Examination procedure03.01.2023Examination requested  [2023/23]
03.01.2023Date on which the examining division has become responsible
22.08.2023Amendment by applicant (claims and/or description)
22.03.2024Communication of intention to grant the patent
18.07.2024Fee for grant paid
18.07.2024Fee for publishing/printing paid
18.07.2024Receipt of the translation of the claim(s)
Fees paidRenewal fee
20.07.2023Renewal fee patent year 03
24.07.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]DE10163987  (GRUNDFOS AS [DK]) [A] 1-12 * paragraphs [0009] , [0 14] , [0 23] - [0025] - [0 33] - [0035] - [0 48] - [0051]; figures 1-4 *;
 [A]DE102017203474  (KSB SE & CO KGAA [DE]) [A] 1-3* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.