blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4221927

EP4221927 - METHOD FOR PRODUCING LOAD-INDICATING CONNECTION COMPONENTS, AND CORRESPONDING LOAD-INDICATING CONNECTION COMPONENT [Right-click to bookmark this link]
StatusGrant of patent is intended
Status updated on  06.05.2024
Database last updated on 13.07.2024
FormerRequest for examination was made
Status updated on  07.07.2023
FormerThe international publication has been made
Status updated on  08.04.2022
Formerunknown
Status updated on  19.10.2021
Most recent event   Tooltip06.05.2024New entry: Communication of intention to grant a patent 
Applicant(s)For all designated states
Intellifast GmbH
Siemensstraße 18
67346 Speyer / DE
[2023/32]
Inventor(s)01 / HÖRING, Gert
76815 Karlsruhe / DE
 [2023/32]
Representative(s)Paustian, Othmar
Boeters & Lieck
Patentanwälte
Oberanger 32
80331 München / DE
[2023/32]
Application number, filing date21786126.928.09.2021
[2023/32]
WO2021EP76590
Priority number, dateDE20201012570701.10.2020         Original published format: DE102020125707
[2023/32]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2022069443
Date:07.04.2022
Language:DE
[2022/14]
Type: A1 Application with search report 
No.:EP4221927
Date:09.08.2023
Language:DE
The application published by WIPO in one of the EPO official languages on 07.04.2022 takes the place of the publication of the European patent application.
[2023/32]
Search report(s)International search report - published on:EP07.04.2022
ClassificationIPC:B23K1/00, B23K1/20, B23K20/16, F16B31/02, G01L5/24, B23K101/20
[2023/32]
CPC:
B23K1/0008 (EP,KR); B23K20/165 (EP,KR,US); B23K1/0006 (EP,KR,US);
B23K1/20 (EP,KR); G01L5/24 (EP,KR,US); B23K2101/20 (EP,KR);
F16B2031/022 (EP,KR); H10N30/875 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/32]
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON LASTENANZEIGENDEN VERBINDUNGSBAUTEILEN UND ENTSPRECHENDES LASTANZEIGENDES VERBINDUNGSBAUTEIL[2023/32]
English:METHOD FOR PRODUCING LOAD-INDICATING CONNECTION COMPONENTS, AND CORRESPONDING LOAD-INDICATING CONNECTION COMPONENT[2023/32]
French:PROCÉDÉ DE PRODUCTION DE COMPOSANTS DE LIAISON INDICATEURS DE CHARGE, ET COMPOSANT DE LIAISON INDICATEUR DE CHARGE[2023/32]
Entry into regional phase07.04.2023National basic fee paid 
07.04.2023Designation fee(s) paid 
07.04.2023Examination fee paid 
Examination procedure07.04.2023Examination requested  [2023/32]
07.04.2023Date on which the examining division has become responsible
07.11.2023Amendment by applicant (claims and/or description)
07.05.2024Communication of intention to grant the patent
Fees paidRenewal fee
22.09.2023Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]EP2010883  (INTELLIFAST GMBH [DE]) [A] 1,13* abstract *;
 [Y]DE102013109879  (FRAUNHOFER GES FORSCHUNG [DE]) [Y] 1-13 * paragraphs [0018] , [0061]; figure - *;
 [A]US2017010167  (THAM ANH TUAN [DE], et al) [A] 1-13 * paragraphs [0003] , [0004] , [0015] *;
 [Y]CN111504542  (CHENGDU SCIENCE AND TECH DEVELOPMENT CENTER CHINA ACADEMY OF ENGINEERING PHYSICS) [Y] 1-13 * paragraph [0070]; figure - *
by applicantEP0915524
 EP2010883
 WO2010085942
 WO2010096439
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.