blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4222994

EP4222994 - METHODS FOR CONFIGURING A USER APPARATUS, NEGOTIATING WITH A NETWORK ENTITY, AND MANAGING A CONNECTION, AND ASSOCIATED DEVICES [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  07.07.2023
Database last updated on 06.11.2024
FormerThe international publication has been made
Status updated on  08.04.2022
Formerunknown
Status updated on  09.11.2021
Most recent event   Tooltip19.09.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Orange
111, quai du Président Roosevelt
92130 Issy-les-Moulineaux / FR
[2024/01]
Former [2023/32]For all designated states
Orange
111, quai du Président Roosevelt
92130 Issy-les-Moulineaux / FR
Inventor(s)01 / BOUCADAIR, Mohamed
92326 Châtillon Cedex / FR
02 / JACQUENET, Christian
92326 Châtillon Cedex / FR
 [2023/32]
Application number, filing date21798076.227.09.2021
[2023/32]
WO2021FR51663
Priority number, dateFR2020000992029.09.2020         Original published format: FR 2009920
[2023/32]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2022069825
Date:07.04.2022
Language:FR
[2022/14]
Type: A1 Application with search report 
No.:EP4222994
Date:09.08.2023
Language:FR
The application published by WIPO in one of the EPO official languages on 07.04.2022 takes the place of the publication of the European patent application.
[2023/32]
Search report(s)International search report - published on:EP07.04.2022
ClassificationIPC:H04W12/03, H04W12/37
[2023/32]
CPC:
H04L63/205 (EP); H04W12/033 (KR); H04W12/37 (EP,US);
H04L63/166 (EP); H04W12/03 (EP,US); H04W12/037 (KR);
H04W12/08 (KR,US); H04W76/12 (KR,US); H04W92/04 (KR);
H04L63/0428 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/32]
TitleGerman:VERFAHREN ZUR KONFIGURATION EINER BENUTZERVORRICHTUNG, VERHANDLUNG MIT EINER NETZWERKEINHEIT UND VERWALTUNG EINER VERBINDUNG SOWIE ZUGEHÖRIGE VORRICHTUNGEN[2023/32]
English:METHODS FOR CONFIGURING A USER APPARATUS, NEGOTIATING WITH A NETWORK ENTITY, AND MANAGING A CONNECTION, AND ASSOCIATED DEVICES[2023/32]
French:PROCEDES DE CONFIGURATION D'UN EQUIPEMENT UTILISATEUR, DE NEGOCIATION AVEC UNE ENTITE DU RESEAU, ET DE GESTION D'UNE CONNEXION, ET DISPOSITIFS ASSOCIES[2023/32]
Entry into regional phase14.04.2023National basic fee paid 
14.04.2023Designation fee(s) paid 
14.04.2023Examination fee paid 
Examination procedure14.04.2023Examination requested  [2023/32]
14.04.2023Date on which the examining division has become responsible
15.11.2023Amendment by applicant (claims and/or description)
Fees paidRenewal fee
20.09.2023Renewal fee patent year 03
19.09.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on Access Traffic Steering, Switch and Splitting support in the 5G system architecture Phase 2 (Release 17)", (20200909), 3GPP DRAFT; 23700-93-100, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_sa/WG2_Arch/Latest_SA2_Specs/Latest_draft_S2_Specs/23700-93-100.zip 23700-93-100.docx, (20200909), XP051933330 [X] 1-21 * page 23, paragraph 6.1.6 * * page 52 - page 56 *
 [XI]  - BANKS MICROSOFT CORPORATION N, "QUIC Disable Encryption; draft-banks-quic-disable-encryption-00.txt", (20200811), pages 1 - 5, QUIC DISABLE ENCRYPTION; DRAFT-BANKS-QUIC-DISABLE-ENCRYPTION-00.TXT; INTERNET-DRAFT: NETWORK WORKING GROUP, INTERNET ENGINEERING TASK FORCE, IETF; STANDARDWORKINGDRAFT, INTERNET SOCIETY (ISOC) 4, RUE, URL: https://tools.ietf.org/html/draft-banks-quic-disable-encryption-00, (20200811), XP015141079 [X] 1-8 * the whole document * [I] 9-21
 [X]  - HUAWEI ET AL, "KI #2, Sol #8: Update QUIC solution to solve ENs", vol. SA WG2, no. e-meeting; 20200819 - 20200901, (20200902), 3GPP DRAFT; S2-2006287, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_sa/WG2_Arch/TSGS2_140e_Electronic/Docs/S2-2006287.zip S2-2006287 - Revision of S2-2005473 - KI #2, Sol #8 - Update QUIC solution to solve ENs-r05.docx, (20200902), XP051928821 [X] 1-21 * the whole document *
by applicant   - 3GPP TS 25.323
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.