EP4062101 - METHOD OF FABRICATION OF COMPOUND LIGHT-GUIDE OPTICAL ELEMENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.10.2024 Database last updated on 24.01.2025 | |
Former | The patent has been granted Status updated on 27.10.2023 | ||
Former | Grant of patent is intended Status updated on 18.09.2023 | ||
Former | Request for examination was made Status updated on 26.08.2022 | ||
Former | The international publication has been made Status updated on 03.12.2021 | Most recent event Tooltip | 17.01.2025 | Lapse of the patent in a contracting state New state(s): LU | published on 19.02.2025 [2025/08] | Applicant(s) | For all designated states Lumus Ltd. 8 Pinhas Sapir Street 7403631 Ness Ziona / IL | [2022/39] | Inventor(s) | 01 /
GRABARNIK, Shimon Rehovot / IL | 02 /
EISENFELD, Tsion Ashkelon / IL | [2022/39] | Representative(s) | Kancelaria Eupatent.pl Sp. z.o.o Ul. Kilinskiego 185 90-348 Lodz / PL | [2022/39] | Application number, filing date | 21814246.1 | 24.05.2021 | [2022/39] | WO2021IL50610 | Priority number, date | US202063029500P | 24.05.2020 Original published format: US 202063029500 P | [2022/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2021240515 | Date: | 02.12.2021 | Language: | EN | [2021/48] | Type: | A1 Application with search report | No.: | EP4062101 | Date: | 28.09.2022 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.12.2021 takes the place of the publication of the European patent application. | [2022/39] | Type: | B1 Patent specification | No.: | EP4062101 | Date: | 29.11.2023 | Language: | EN | [2023/48] | Search report(s) | International search report - published on: | IL | 02.12.2021 | (Supplementary) European search report - dispatched on: | EP | 09.05.2023 | Classification | IPC: | F21V8/00, G02B27/00, G02B27/01 | [2022/39] | CPC: |
G02B17/006 (EP,IL);
G02B6/0065 (IL,KR,US);
B29D11/00721 (IL,KR,US);
G02B27/0081 (EP,IL);
G02B27/0172 (EP,IL);
G02B6/0035 (IL,KR,US);
G02B2027/0125 (EP,IL)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON ZUSAMMENGESETZTEN OPTISCHEN LICHTLEITERELEMENTEN | [2022/39] | English: | METHOD OF FABRICATION OF COMPOUND LIGHT-GUIDE OPTICAL ELEMENTS | [2022/39] | French: | PROCÉDÉ DE FABRICATION D'ÉLÉMENTS OPTIQUES À GUIDE DE LUMIÈRE COMPOSÉ | [2022/39] | Entry into regional phase | 22.06.2022 | National basic fee paid | 22.06.2022 | Search fee paid | 22.06.2022 | Designation fee(s) paid | 22.06.2022 | Examination fee paid | Examination procedure | 22.06.2022 | Examination requested [2022/39] | 06.06.2023 | Date on which the examining division has become responsible | 19.09.2023 | Communication of intention to grant the patent | 20.10.2023 | Receipt of the translation of the claim(s) | 25.10.2023 | Fee for grant paid | 25.10.2023 | Fee for publishing/printing paid | Divisional application(s) | EP23212825.6 / EP4325277 | Opposition(s) | 30.08.2024 | No opposition filed within time limit [2024/45] | Fees paid | Renewal fee | 12.03.2023 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 29.11.2023 | DK | 29.11.2023 | EE | 29.11.2023 | ES | 29.11.2023 | HR | 29.11.2023 | LT | 29.11.2023 | LV | 29.11.2023 | MC | 29.11.2023 | PL | 29.11.2023 | RO | 29.11.2023 | RS | 29.11.2023 | SI | 29.11.2023 | SK | 29.11.2023 | SM | 29.11.2023 | BG | 29.02.2024 | NO | 29.02.2024 | GR | 01.03.2024 | IS | 29.03.2024 | PT | 01.04.2024 | LU | 24.05.2024 | [2025/08] |
Former [2025/07] | CZ | 29.11.2023 | |
DK | 29.11.2023 | ||
EE | 29.11.2023 | ||
ES | 29.11.2023 | ||
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
MC | 29.11.2023 | ||
PL | 29.11.2023 | ||
RO | 29.11.2023 | ||
RS | 29.11.2023 | ||
SI | 29.11.2023 | ||
SK | 29.11.2023 | ||
SM | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
PT | 01.04.2024 | ||
Former [2024/50] | CZ | 29.11.2023 | |
DK | 29.11.2023 | ||
EE | 29.11.2023 | ||
ES | 29.11.2023 | ||
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
PL | 29.11.2023 | ||
RO | 29.11.2023 | ||
RS | 29.11.2023 | ||
SI | 29.11.2023 | ||
SK | 29.11.2023 | ||
SM | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
PT | 01.04.2024 | ||
Former [2024/36] | CZ | 29.11.2023 | |
DK | 29.11.2023 | ||
EE | 29.11.2023 | ||
ES | 29.11.2023 | ||
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
PL | 29.11.2023 | ||
RO | 29.11.2023 | ||
RS | 29.11.2023 | ||
SK | 29.11.2023 | ||
SM | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
PT | 01.04.2024 | ||
Former [2024/35] | CZ | 29.11.2023 | |
DK | 29.11.2023 | ||
EE | 29.11.2023 | ||
ES | 29.11.2023 | ||
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
PL | 29.11.2023 | ||
RO | 29.11.2023 | ||
RS | 29.11.2023 | ||
SM | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
Former [2024/33] | DK | 29.11.2023 | |
ES | 29.11.2023 | ||
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
PL | 29.11.2023 | ||
RS | 29.11.2023 | ||
SM | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
Former [2024/27] | ES | 29.11.2023 | |
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
PL | 29.11.2023 | ||
RS | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
Former [2024/21] | LT | 29.11.2023 | |
BG | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
Former [2024/20] | GR | 01.03.2024 | |
IS | 29.03.2024 | Documents cited: | Search | [A]WO2016103263 (LUMUS LTD [IL]); | [A]WO2020049542 (LUMUS LTD [IL]) | International search | [DA]WO2016103263 (LUMUS LTD [IL]); | [A]US2018292599 (OFIR YUVAL [IL], et al); | [A]DE202019101599U (LUMUS LTD [IL]); | [A]US2019227215 (DANZIGER YOCHAY [IL], et al); | [A]US2019293838 (HABA BELGACEM [US], et al); | [DA]WO2020049542 (LUMUS LTD [IL]) |