blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4144115

EP4144115 - METHOD AND APPARATUS FOR ENHANCED RESUME PROTECTION [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  27.03.2024
Database last updated on 14.09.2024
FormerRequest for examination was made
Status updated on  03.02.2023
FormerThe international publication has been made
Status updated on  11.02.2022
Most recent event   Tooltip26.08.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si, Gyeonggi-do 16677 / KR
[2023/13]
Former [2023/10]For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si
Gyeonggi-do 16677 / KR
Inventor(s)01 / AGIWAL, Anil
Suwon-si, Gyeonggi-do 16677 / KR
02 / KIM, Soenghun
Suwon-si, Gyeonggi-do 16677 / KR
 [2023/10]
Representative(s)Gulde & Partner
Patent- und Rechtsanwaltskanzlei mbB
Wallstraße 58/59
10179 Berlin / DE
[2023/10]
Application number, filing date21854405.403.08.2021
[2023/10]
WO2021KR10182
Priority number, dateKR2020009691603.08.2020         Original published format: KR 20200096916
[2023/10]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2022030972
Date:10.02.2022
Language:EN
[2022/06]
Type: A1 Application with search report 
No.:EP4144115
Date:08.03.2023
Language:EN
The application published by WIPO in one of the EPO official languages on 10.02.2022 takes the place of the publication of the European patent application.
[2023/10]
Search report(s)International search report - published on:KR10.02.2022
(Supplementary) European search report - dispatched on:EP04.10.2023
ClassificationIPC:H04W74/08, // H04W76/27
[2023/44]
CPC:
H04W74/0833 (EP,KR); H04W76/19 (US); H04W12/04 (KR);
H04W28/0278 (KR); H04W72/1268 (KR,US); H04W74/0841 (US);
H04W76/11 (KR); H04W76/27 (EP); Y02D30/70 (EP) (-)
Former IPC [2023/10]H04W12/10, H04W12/04, H04W76/19, H04W76/11, H04W76/27
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/10]
TitleGerman:VERFAHREN UND VORRICHTUNG FÜR VERBESSERTEN WIEDERAUFNAHMESCHUTZ[2023/10]
English:METHOD AND APPARATUS FOR ENHANCED RESUME PROTECTION[2023/10]
French:PROCÉDÉ ET APPAREIL POUR PROTECTION DE REPRISE RENFORCÉE[2023/10]
Entry into regional phase02.12.2022National basic fee paid 
02.12.2022Search fee paid 
02.12.2022Designation fee(s) paid 
02.12.2022Examination fee paid 
Examination procedure02.12.2022Examination requested  [2023/10]
01.02.2024Amendment by applicant (claims and/or description)
01.02.2024Date on which the examining division has become responsible
26.03.2024Despatch of a communication from the examining division (Time limit: M04)
26.07.2024Reply to a communication from the examining division
Fees paidRenewal fee
24.08.2023Renewal fee patent year 03
25.08.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US2020137564  (LIU HUICHUN [CN], et al) [A] 3,6,7,10,13-15 * paragraph [0057] * * paragraph [0083] - paragraph [0119] *;
 [Y]  - SAMSUNG, "Overall procedure for data transfer in inactive state", vol. RAN WG2, no. Reno, USA; 20161114 - 20161118, (20161113), 3GPP DRAFT; R2-168051, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20161113), XP051177750 [Y] 1-15 * paragraph [02.1] - paragraph [02.2]; figure 2b *
 [Y]  - ZTE, "Consideration on early data transmission in eFeMTC", vol. RAN WG2, no. Berlin, Germany; 20170821 - 20170825, (20170820), 3GPP DRAFT; R2-1708380 CONSIDERATION ON EARLY DATA TRANSMISSION IN EFEMTC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170820), XP051318252 [Y] 1-15 * paragraph [2.3.3]; figure 6 *
 [Y]  - HUAWEI ET AL, "Data transmission in inactive state, option A vs. option B", vol. RAN WG2, no. Athens, Greece; 20170213 - 20170217, (20170220), 3GPP DRAFT; R2-1702058, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_97/Docs/, (20170220), XP051237185 [Y] 1-15 * paragraph [2.1.3]; figure 3 *
 [A]  - QUALCOMM INCORPORATED, "UL early data transmission", vol. RAN WG2, no. Berlin, Germany; 20170821 - 20170825, (20170820), 3GPP DRAFT; R2-1708239 UL EARLY DATA TRANSMISSION-EMTC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170820), XP051318141 [A] 1,4,8,11 * paragraph [4.2.2]; figure 5 *
International search[A]KR20200028781  (SAMSUNG ELECTRONICS CO LTD [KR], et al) [A] 1-15* paragraphs [0007]-[0021]; and claims 1-20 *;
 [Y]US2020214043  (PARK SUNG JUN [KR], et al) [Y] 1-15 * paragraphs [0070]-[0084]; and claims 10-31 *;
 [Y]CN111385071  (TELECOMMUNICATIONS TECH RES INST CO LTD) [Y] 4-7,11-15 * paragraphs [0004]-[0077]; and claims 1-38 *;
 [Y]  - Qualcomm Incorporated, Samsung, CATT, Huawei, Hisilicon, "shortResumeMAC-I calculation", 3GPP Draft; S3-201263, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , (20200501), vol. SA WG3, no. Online Meeting ;20200511 - 20200515, XP051879902 [Y] 1-15 * section 6.8.2.1.3 *
 [A]  - "3 Generation Partnership Project; Technical Specification Group Services and System Aspects; Security architecture and procedures for 5G system (Release 16)", 3GPP Standard; Technical Specification; 3GPP TS 33.501, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , (20200710), vol. SA WG3, no. V16.3.0, pages 1 - 248, XP051924931 [A] 1-15 * section 6.8.2.1.3 *
by applicantUS2020137564
    - EFEMTC. HUAWE1 et al., "Data transmission in inactive state, option A vs. option B", 3GPP DRAFT; R2-1702058, 3RD GENERATION
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.