EP4149203 - CORE NETWORK NODE FOR SESSION MANAGEMENT, CORE NETWORK NODE FOR MOBILITY MANAGEMENT, AND METHOD INVOLVING SAME [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 10.02.2023 Database last updated on 18.11.2024 | |
Former | The international publication has been made Status updated on 22.04.2022 | Most recent event Tooltip | 28.08.2024 | New entry: Renewal fee paid | Applicant(s) | For all designated states NEC Corporation 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2023/11] | Inventor(s) | 01 /
TAMURA Toshiyuki Tokyo 108-8001 / JP | 02 /
TAKAKURA Tsuyoshi Tokyo 110-0012 / JP | [2023/11] | Representative(s) | MacDougall, Alan John Shaw, et al Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [2023/11] | Application number, filing date | 21879759.5 | 26.08.2021 | [2023/11] | WO2021JP31366 | Priority number, date | JP20200174588 | 16.10.2020 Original published format: JP 2020174588 | [2023/11] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2022080017 | Date: | 21.04.2022 | Language: | JA | [2022/16] | Type: | A1 Application with search report | No.: | EP4149203 | Date: | 15.03.2023 | Language: | EN | [2023/11] | Search report(s) | International search report - published on: | JP | 21.04.2022 | (Supplementary) European search report - dispatched on: | EP | 08.11.2023 | Classification | IPC: | H04W76/32, H04W76/22, H04W24/02, // H04W88/14, H04W48/18 | [2023/49] | CPC: |
H04W24/02 (EP);
H04W48/04 (US);
H04L41/40 (US);
H04W76/22 (EP);
H04W76/32 (EP);
H04W76/34 (US);
H04W88/14 (EP)
(-)
|
Former IPC [2023/11] | H04W76/20, H04W76/30, H04W48/18, H04W88/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/11] | Title | German: | KERNNETZWERKKNOTEN ZUR SITZUNGSVERWALTUNG, KERNNETZWERKKNOTEN ZUR MOBILITÄTSVERWALTUNG UND VERFAHREN DAMIT | [2023/11] | English: | CORE NETWORK NODE FOR SESSION MANAGEMENT, CORE NETWORK NODE FOR MOBILITY MANAGEMENT, AND METHOD INVOLVING SAME | [2023/11] | French: | NOEUD DE RÉSEAU CENTRAL POUR LA GESTION DE SESSION, NOEUD DE RÉSEAU CENTRAL POUR LA GESTION DE MOBILITÉ, ET PROCÉDÉ IMPLIQUANT CEUX-CI | [2023/11] | Entry into regional phase | 08.12.2022 | Translation filed | 08.12.2022 | National basic fee paid | 08.12.2022 | Search fee paid | 08.12.2022 | Designation fee(s) paid | 08.12.2022 | Examination fee paid | Examination procedure | 08.12.2022 | Examination requested [2023/11] | 24.05.2024 | Amendment by applicant (claims and/or description) | 24.05.2024 | Date on which the examining division has become responsible | Fees paid | Renewal fee | 25.08.2023 | Renewal fee patent year 03 | 27.08.2024 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI]WO2019160390 (LG ELECTRONICS INC [KR]) [X] 1,2,6,7,10-15 * paragraphs [1] - [23], [40] - [45], [69] - [136], [159] - [379], [382], [383]; figures 1-12 * [I] 3-5,8,9; | [XI]US2019335392 (QIAO WEIHUA [US], et al) [X] 1,2,6,7,10-15 * paragraphs [0033], [0137] - [0477]; figures 1-30 * [I] 3-5,8,9; | [XPI]WO2021092312 (QUALCOMM INC [US]) [XP] 1,2,6,7,10-15 * paragraphs [0002] - [0050], [0062] - [0241], [0289] - [0291]; figures 1-24 *[I] 3-5,8,9; | [XI] - LG ELECTRONICS, "KI#7, New Sol: RAN configuration based UE steering during PDU session establishment", vol. SA WG2, no. e-meeting ;20200819 - 20200901, (20200813), 3GPP DRAFT; S2-2005283, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_sa/WG2_Arch/TSGS2_140e_Electronic/Docs/S2-2005283.zip S2-2005283_pCR_Fin.doc, (20200813), XP052462832 [X] 1,2,6,7,10-15 * sections 1, 2 * [I] 3-5,8,9 | [XDI] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; System architecture for the 5G System (5GS); Stage 2 (Release 16)", (20200924), 3GPP DRAFT; 23501-G60, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/3guInternal/3GPP_ultimate_versions_to_be_transposed/sentToDpc/23501-g60.zip 23501-g60.docx, (20200924), XP052297827 [XD] 1,2,6,7,10-15 * sections 5.15, 5.19 * [I] 3-5,8,9 | International search | [A]US2020322857 (PARK SANGMIN [KR], et al) [A] 1-28* paragraphs [0328]-[0333] *; | [YA] - NEC, "KI#6 Sol#27: Solution #27 clarification update", 3GPP Draft; S2-2007726, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , (20201002), vol. SA WG2, no. E (e-meeting); 20201012 - 20201023, XP051938756 [Y] 17-22 * in particular, section 6.27.3.2 * [A] 1-16, 23-28 | [YA] - LG Electronics Inc., "WID on Study on Network Slice-aware Network Selection", 3GPP Draft; S1-201029, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , (20200206), vol. SA WG1, no. 20200210 - 20200214, XP051846916 [Y] 17-22 * in particular, section 4 * [A] 1-16, 23-28 | [A] - Ericsson, "KI#4 - Solution #2, Clarification on EN to check with SA5, and alignment with eNS_ph2", 3GPP Draft; S2-2007117, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , (20201002), vol. SA WG2, no. e-meeting; 20201012 - 20201023, XP051938174 [A] 1-28 * pp. 8-10, 13-15 * | [A] - Spirent Comm., AT&T, Convida Wireless, Sandvine, "KI #9, Solution Completion and Procedures: Dispersion Analytic Output Provided by NWDAF", 3GPP Draft; S2-2006977, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , (20201002), vol. SA WG2, no. Elbonia; 20201012 - 20201023, XP051939007 [A] 1-28 * in particular, section 6.30.5 * | [A] - NEC, Apple, "KI#2 Sol#10: Updates to Solution #10 Max number of PDU Sessions per Network Slice control", 3GPP Draft; S2-2003625, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , (20200522), vol. SA WG2, no. Electronic, Elbonia; 20200601 - 20200612, XP051889683 [A] 1-28 * in particular, section 6.10.3.1 * | by applicant | JP2020174588 |