blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4044228

EP4044228 - POWER STRUCTURE, PREPARATION METHOD, AND DEVICE [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  27.06.2024
Database last updated on 31.08.2024
FormerGrant of patent is intended
Status updated on  13.03.2024
FormerExamination is in progress
Status updated on  27.07.2023
FormerRequest for examination was made
Status updated on  16.12.2022
FormerThe application has been published
Status updated on  15.07.2022
Most recent event   Tooltip27.06.2024(Expected) grantpublished on 31.07.2024  [2024/31]
Applicant(s)For all designated states
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Administration Building
Bantian, Longgang District
Shenzhen, Guangdong 518129, P.R. / CN
[2022/33]
Inventor(s)01 / ZHANG, Kai
Shenzhen, 518129 / CN
02 / XU, Jiahui
Shenzhen, 518129 / CN
03 / CHEN, Baiyou
Shenzhen, 518129 / CN
04 / YAO, Weiwei
Shenzhen, 518129 / CN
 [2022/33]
Representative(s)Gill Jennings & Every LLP
The Broadgate Tower
20 Primrose Street
London EC2A 2ES / GB
[2022/33]
Application number, filing date22154721.902.02.2022
[2022/33]
Priority number, dateCN20211018404910.02.2021         Original published format: CN202110184049
[2022/33]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4044228
Date:17.08.2022
Language:EN
[2022/33]
Type: B1 Patent specification 
No.:EP4044228
Date:31.07.2024
Language:EN
[2024/31]
Search report(s)(Supplementary) European search report - dispatched on:EP11.07.2022
ClassificationIPC:H01L25/16, H01L25/11, H01L23/538, H01L23/498, H01L23/373
[2024/14]
CPC:
H01L23/5385 (EP,US); H01L25/16 (EP,CN); H01L25/162 (US);
H01L23/3121 (US); H01L23/3672 (CN); H01L23/3735 (EP,US);
H01L23/49811 (EP,US); H01L25/50 (CN); H01L2224/48227 (EP);
H01L2224/48229 (EP); H01L25/117 (EP) (-)
Former IPC [2022/33]H01L23/498, H01L23/538, H01L25/07, H01L23/373
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/03]
Former [2022/33]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:LEISTUNGSSTRUKTUR, HERSTELLUNGSVERFAHREN UND VORRICHTUNG[2022/33]
English:POWER STRUCTURE, PREPARATION METHOD, AND DEVICE[2022/33]
French:STRUCTURE D'ALIMENTATION, PROCÉDÉ DE PRÉPARATION ET DISPOSITIF[2022/33]
Examination procedure08.12.2022Amendment by applicant (claims and/or description)
08.12.2022Examination requested  [2023/03]
08.12.2022Date on which the examining division has become responsible
26.07.2023Despatch of a communication from the examining division (Time limit: M04)
30.11.2023Reply to a communication from the examining division
14.03.2024Communication of intention to grant the patent
21.06.2024Fee for grant paid
21.06.2024Fee for publishing/printing paid
21.06.2024Receipt of the translation of the claim(s)
Fees paidRenewal fee
29.02.2024Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US2012068332  (PARK DONGSAM [KR], et al);
 [X]US2019043847  (LEE YUN TAE [KR], et al);
 [XI]US2019088621  (YANG DEOKKYUNG [KR], et al);
 [X]US2020058695  (HSIEH YU-TE [TW])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.