EP4053774 - CROSS-CHANNEL NETWORK SECURITY SYSTEM WITH TIERED ADAPTIVE MITIGATION OPERATIONS [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 11.08.2023 Database last updated on 04.11.2024 | |
Former | Request for examination was made Status updated on 10.03.2023 | ||
Former | The application has been published Status updated on 05.08.2022 | Most recent event Tooltip | 23.09.2024 | New entry: Reply to examination report | Applicant(s) | For all designated states Bank of America Corporation NC1-028-29-04, One Bank of America Center 150 N. College Street Charlotte, North Carolina 28255 / US | [2022/36] | Inventor(s) | 01 /
CARROLL, Michael Joseph Charlotte, 28255 / US | 02 /
BASHORE, Jeffrey Brian Charlotte, 28255 / US | 03 /
FILLIBEN, Joel Charlotte, 28255 / US | 04 /
KIM, Andrew DongHo Charlotte, 28255 / US | 05 /
REDDY KOTHA, Akhilendra Charlotte, 28255 / US | 06 /
KOTLO, Pavan Kumar Reddy Charlotte, 28255 / US | 07 /
MORRIS Jr., Ronnie Joe Charlotte, 28255 / US | 08 /
SATIJA, Dharmender Kumar Charlotte, 28255 / US | 09 /
SHIH, Michael Charlotte, 28255 / US | 10 /
SIMS, Scott Anderson Charlotte, 28255 / US | 11 /
WIDMANN, Craig D Charlotte, 28255 / US | [2022/36] | Representative(s) | Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | [2022/36] | Application number, filing date | 22159983.0 | 03.03.2022 | [2022/36] | Priority number, date | US202117191377 | 03.03.2021 Original published format: US202117191377 | [2022/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4053774 | Date: | 07.09.2022 | Language: | EN | [2022/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.07.2022 | Classification | IPC: | G06Q20/40, H04L9/40 | [2022/36] | CPC: |
G06Q20/4016 (EP);
H04L63/1466 (EP,US);
G06Q20/405 (EP);
H04L63/105 (US);
H04L63/1416 (EP,US);
H04L63/1425 (EP,US);
H04L63/20 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/15] |
Former [2022/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | KANALÜBERGREIFENDES NETZWERKSICHERHEITSSYSTEM MIT ABGESTUFTEN ADAPTIVEN ABSCHWÄCHUNGSOPERATIONEN | [2022/36] | English: | CROSS-CHANNEL NETWORK SECURITY SYSTEM WITH TIERED ADAPTIVE MITIGATION OPERATIONS | [2022/36] | French: | SYSTÈME DE SÉCURITÉ DE RÉSEAU INTER-CANAL AVEC OPÉRATIONS D'ATTÉNUATION ADAPTATIVE À PLUSIEURS NIVEAUX | [2022/36] | Examination procedure | 07.03.2023 | Amendment by applicant (claims and/or description) | 07.03.2023 | Examination requested [2023/15] | 07.03.2023 | Date on which the examining division has become responsible | 11.08.2023 | Despatch of a communication from the examining division (Time limit: M04) | 18.12.2023 | Reply to a communication from the examining division | 05.06.2024 | Despatch of a communication from the examining division (Time limit: M04) | 20.09.2024 | Reply to a communication from the examining division | Fees paid | Renewal fee | 20.03.2024 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [YA]US2017195366 (JONES-MCFADDEN ALICIA C [US], et al); | [A]US9749308 (JONES-MCFADDEN ALICIA C [US], et al); | [XYI]US2019132328 (SIMS SCOTT ANDERSON [US], et al); | [Y]US2019251565 (MULLANEY CRAIG M [US], et al) |