blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4067593

EP4067593 - DEVICE FOR THE SUBSEQUENT THERMAL INSULATION, FORCE-TRANSMITTING CONNECTION OF A SECOND LOAD-BEARING BUILDING ELEMENT TO A FIRST LOAD-BEARING CONSTRUCTION ELEMENT AND CONSTRUCTION WITH SUCH A DEVICE [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  26.01.2024
Database last updated on 14.09.2024
FormerGrant of patent is intended
Status updated on  09.11.2023
FormerRequest for examination was made
Status updated on  24.03.2023
FormerThe application has been published
Status updated on  02.09.2022
Most recent event   Tooltip08.08.2024Lapse of the patent in a contracting state
New state(s): LV, PT
published on 11.09.2024  [2024/37]
Applicant(s)For all designated states
Leviat GmbH
Liebigstraße 14
40764 Langenfeld / DE
[2022/40]
Inventor(s)01 / Heidolf, Thorsten
99425 Weimar / DE
02 / Hollerbuhl, Lutz
06526 Sangerhausen / DE
03 / Keller, Tina
06268 Querfurt / DE
 [2022/40]
Representative(s)Reinhardt, Annette, et al
Patentanwälte
Dipl.Ing. W. Jackisch & Partner mbB
Menzelstraße 40
70192 Stuttgart / DE
[2022/40]
Application number, filing date22163162.521.03.2022
[2022/40]
Priority number, dateDE202120101776U01.04.2021         Original published format: DE 202021101776 U
[2022/40]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP4067593
Date:05.10.2022
Language:DE
[2022/40]
Type: B1 Patent specification 
No.:EP4067593
Date:28.02.2024
Language:DE
[2024/09]
Search report(s)(Supplementary) European search report - dispatched on:EP29.08.2022
ClassificationIPC:E04B1/00
[2022/40]
CPC:
E04B1/0038 (EP,US); E04B1/78 (US); E04B5/16 (US);
E04B2001/7679 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/17]
Former [2022/40]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:EINRICHTUNG ZUR NACHTRÄGLICHEN THERMISCH ISOLIERENDEN, KRAFTÜBERTRAGENDEN ANBINDUNG EINES ZWEITEN LASTAUFNEHMENDEN BAUWERKSTEILS AN EIN ERSTES LASTAUFNEHMENDES BAUWERKSTEIL UND BAUWERK MIT EINER SOLCHEN EINRICHTUNG[2022/40]
English:DEVICE FOR THE SUBSEQUENT THERMAL INSULATION, FORCE-TRANSMITTING CONNECTION OF A SECOND LOAD-BEARING BUILDING ELEMENT TO A FIRST LOAD-BEARING CONSTRUCTION ELEMENT AND CONSTRUCTION WITH SUCH A DEVICE[2022/40]
French:DISPOSITIF DE LIAISON ULTÉRIEURE À ISOLATION THERMIQUE ET À TRANSFERT DE FORCE D'UNE SECONDE PARTIE D'OUVRAGE SUPPORTANT LA CHARGE À UNE PREMIÈRE PARTIE D'OUVRAGE SUPPORTANT LA CHARGE ET OUVRAGE DOTÉ D'UN TEL DISPOSITIF[2022/40]
Examination procedure23.03.2023Amendment by applicant (claims and/or description)
23.03.2023Examination requested  [2023/17]
23.03.2023Date on which the examining division has become responsible
10.11.2023Communication of intention to grant the patent
18.01.2024Fee for grant paid
18.01.2024Fee for publishing/printing paid
18.01.2024Receipt of the translation of the claim(s)
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipBG28.02.2024
ES28.02.2024
HR28.02.2024
LT28.02.2024
LV28.02.2024
RS28.05.2024
GR29.05.2024
IS28.06.2024
PT28.06.2024
[2024/37]
Former [2024/35]BG28.02.2024
ES28.02.2024
HR28.02.2024
LT28.02.2024
RS28.05.2024
GR29.05.2024
IS28.06.2024
Former [2024/33]LT28.02.2024
IS28.06.2024
Former [2024/32]IS28.06.2024
Documents cited:Search[X]KR101462801B  (CHEONGWON CHEMICAL CO LTD [KR]);
 [X]GB2567685  (INSULA LTD [GB]);
 [XI]EP3613910  (IBALKON DARIUSZ GLAZA [PL])
by applicantWO2017086777
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.