| EP4080018 - VANE ARC SEGMENT WITH FLANGE HAVING STEP AND METHOD OF FABRICATING A VANE ARC SEGMENT [Right-click to bookmark this link] | |||
| Former [2022/43] | VANE ARC SEGMENT WITH FLANGE HAVING STEP | ||
| [2023/50] | Status | No opposition filed within time limit Status updated on 14.03.2025 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 05.04.2024 | ||
| Former | Grant of patent is intended Status updated on 27.11.2023 | ||
| Former | Request for examination was made Status updated on 28.04.2023 | ||
| Former | The application has been published Status updated on 23.09.2022 | Most recent event Tooltip | 17.10.2025 | Lapse of the patent in a contracting state New state(s): MC | published on 19.11.2025 [2025/47] | Applicant(s) | For all designated states RTX Corporation 10 Farm Springs Road Farmington, CT 06032 / US | [2023/44] |
| Former [2022/43] | For all designated states Raytheon Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | Inventor(s) | 01 /
SOBANSKI, Jon E. Glastonbury, 06033 / US | 02 /
WHITE, III, Robert A. Meriden, 06450 / US | [2022/43] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
| Former [2022/43] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 22164217.6 | 24.03.2022 | [2022/43] | Priority number, date | US202117212233 | 25.03.2021 Original published format: US202117212233 | [2022/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4080018 | Date: | 26.10.2022 | Language: | EN | [2022/43] | Type: | B1 Patent specification | No.: | EP4080018 | Date: | 08.05.2024 | Language: | EN | [2024/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.09.2022 | Classification | IPC: | F01D9/04, F01D25/24, F01D5/28, F01D5/30, F01D11/00 | [2022/43] | CPC: |
F01D9/042 (EP);
F01D5/147 (US);
F01D11/005 (EP);
F01D25/246 (EP);
F01D5/282 (EP);
F01D5/284 (EP);
F01D5/288 (EP);
F01D5/3084 (EP);
F02C7/00 (US);
F05D2220/32 (US);
F05D2230/31 (US);
F05D2230/90 (US);
F05D2240/128 (EP);
F05D2240/24 (US);
F05D2240/30 (US);
F05D2240/55 (US);
F05D2240/80 (EP);
F05D2260/30 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/22] |
| Former [2022/43] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SCHAUFELBOGENSEGMENT MIT FLANSCH MIT STUFE UND VERFAHREN ZUR HERSTELLUNG EINES SCHAUFELBOGENSEGMENTS | [2023/47] | English: | VANE ARC SEGMENT WITH FLANGE HAVING STEP AND METHOD OF FABRICATING A VANE ARC SEGMENT | [2023/50] | French: | SEGMENT D'ARC D'AUBE AVEC BRIDE À ÉCHELON ET PROCÉDÉ DE FABRICATION D'UN SEGMENT D'AUBE | [2023/47] |
| Former [2022/43] | SCHAUFELBOGENSEGMENT MIT FLANSCH MIT STUFE | ||
| Former [2022/43] | VANE ARC SEGMENT WITH FLANGE HAVING STEP | ||
| Former [2022/43] | SEGMENT D'ARC D'AUBE AVEC BRIDE À ÉCHELON | Examination procedure | 26.04.2023 | Amendment by applicant (claims and/or description) | 26.04.2023 | Examination requested [2023/22] | 26.04.2023 | Date on which the examining division has become responsible | 28.11.2023 | Communication of intention to grant the patent | 27.03.2024 | Fee for grant paid | 27.03.2024 | Fee for publishing/printing paid | 27.03.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 11.02.2025 | No opposition filed within time limit [2025/16] | Fees paid | Renewal fee | 20.03.2024 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 08.05.2024 | BG | 08.05.2024 | CZ | 08.05.2024 | DK | 08.05.2024 | EE | 08.05.2024 | ES | 08.05.2024 | FI | 08.05.2024 | HR | 08.05.2024 | IT | 08.05.2024 | LV | 08.05.2024 | MC | 08.05.2024 | NL | 08.05.2024 | PL | 08.05.2024 | RO | 08.05.2024 | SE | 08.05.2024 | SI | 08.05.2024 | SK | 08.05.2024 | SM | 08.05.2024 | NO | 08.08.2024 | RS | 08.08.2024 | GR | 09.08.2024 | IS | 08.09.2024 | PT | 09.09.2024 | [2025/47] |
| Former [2025/42] | AT | 08.05.2024 | |
| BG | 08.05.2024 | ||
| CZ | 08.05.2024 | ||
| DK | 08.05.2024 | ||
| EE | 08.05.2024 | ||
| ES | 08.05.2024 | ||
| FI | 08.05.2024 | ||
| HR | 08.05.2024 | ||
| IT | 08.05.2024 | ||
| LV | 08.05.2024 | ||
| NL | 08.05.2024 | ||
| PL | 08.05.2024 | ||
| RO | 08.05.2024 | ||
| SE | 08.05.2024 | ||
| SI | 08.05.2024 | ||
| SK | 08.05.2024 | ||
| SM | 08.05.2024 | ||
| NO | 08.08.2024 | ||
| RS | 08.08.2024 | ||
| GR | 09.08.2024 | ||
| IS | 08.09.2024 | ||
| PT | 09.09.2024 | ||
| Former [2025/23] | AT | 08.05.2024 | |
| BG | 08.05.2024 | ||
| CZ | 08.05.2024 | ||
| DK | 08.05.2024 | ||
| EE | 08.05.2024 | ||
| ES | 08.05.2024 | ||
| FI | 08.05.2024 | ||
| HR | 08.05.2024 | ||
| IT | 08.05.2024 | ||
| LV | 08.05.2024 | ||
| NL | 08.05.2024 | ||
| PL | 08.05.2024 | ||
| RO | 08.05.2024 | ||
| SI | 08.05.2024 | ||
| SK | 08.05.2024 | ||
| SM | 08.05.2024 | ||
| NO | 08.08.2024 | ||
| RS | 08.08.2024 | ||
| GR | 09.08.2024 | ||
| IS | 08.09.2024 | ||
| PT | 09.09.2024 | ||
| Former [2025/11] | AT | 08.05.2024 | |
| BG | 08.05.2024 | ||
| CZ | 08.05.2024 | ||
| DK | 08.05.2024 | ||
| EE | 08.05.2024 | ||
| ES | 08.05.2024 | ||
| FI | 08.05.2024 | ||
| HR | 08.05.2024 | ||
| IT | 08.05.2024 | ||
| LV | 08.05.2024 | ||
| NL | 08.05.2024 | ||
| PL | 08.05.2024 | ||
| RO | 08.05.2024 | ||
| SK | 08.05.2024 | ||
| SM | 08.05.2024 | ||
| NO | 08.08.2024 | ||
| RS | 08.08.2024 | ||
| GR | 09.08.2024 | ||
| IS | 08.09.2024 | ||
| PT | 09.09.2024 | ||
| Former [2025/09] | AT | 08.05.2024 | |
| BG | 08.05.2024 | ||
| DK | 08.05.2024 | ||
| EE | 08.05.2024 | ||
| ES | 08.05.2024 | ||
| FI | 08.05.2024 | ||
| HR | 08.05.2024 | ||
| LV | 08.05.2024 | ||
| NL | 08.05.2024 | ||
| PL | 08.05.2024 | ||
| NO | 08.08.2024 | ||
| RS | 08.08.2024 | ||
| GR | 09.08.2024 | ||
| IS | 08.09.2024 | ||
| PT | 09.09.2024 | ||
| Former [2025/08] | AT | 08.05.2024 | |
| BG | 08.05.2024 | ||
| DK | 08.05.2024 | ||
| ES | 08.05.2024 | ||
| FI | 08.05.2024 | ||
| HR | 08.05.2024 | ||
| LV | 08.05.2024 | ||
| NL | 08.05.2024 | ||
| PL | 08.05.2024 | ||
| NO | 08.08.2024 | ||
| RS | 08.08.2024 | ||
| GR | 09.08.2024 | ||
| IS | 08.09.2024 | ||
| PT | 09.09.2024 | ||
| Former [2024/50] | AT | 08.05.2024 | |
| BG | 08.05.2024 | ||
| ES | 08.05.2024 | ||
| FI | 08.05.2024 | ||
| HR | 08.05.2024 | ||
| LV | 08.05.2024 | ||
| NL | 08.05.2024 | ||
| PL | 08.05.2024 | ||
| NO | 08.08.2024 | ||
| RS | 08.08.2024 | ||
| GR | 09.08.2024 | ||
| IS | 08.09.2024 | ||
| PT | 09.09.2024 | ||
| Former [2024/48] | AT | 08.05.2024 | |
| BG | 08.05.2024 | ||
| ES | 08.05.2024 | ||
| FI | 08.05.2024 | ||
| HR | 08.05.2024 | ||
| NL | 08.05.2024 | ||
| NO | 08.08.2024 | ||
| GR | 09.08.2024 | ||
| IS | 08.09.2024 | ||
| PT | 09.09.2024 | Documents cited: | Search | [XI] EP3121379 (GEN ELECTRIC et al.) [X] 1-5,8 * paragraphs [0003] - [0007] - [0024] , [0025] , [0031] , [0036] , [0039] , [0042]; figures 1-14 *[I] 6,7,9-11 | [A] EP2662529 (SIEMENS AG et al.) [A] 1,5-7,11 * paragraphs [0017] , [0020] , [0022] , [0041] , [0048] - [0050]; figures 1,2 * |