EP4199290 - NETWORK CONSTRAINT ENERGY MANAGEMENT SYSTEM FOR ELECTRIC VEHICLE DEPOT CHARGING AND SCHEDULING [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 19.05.2023 Database last updated on 13.11.2024 | Most recent event Tooltip | 24.04.2024 | New entry: Renewal fee paid | Applicant(s) | For all designated states Hitachi Energy Ltd Brown-Boveri-Strasse 5 8050 Zürich / CH | [2023/50] |
Former [2023/25] | For all designated states Hitachi Energy Switzerland AG Bruggerstrasse 72 5400 Baden / CH | Inventor(s) | 01 /
HAFIZ, Faeza 27502 Apex / US | 02 /
ISHCHENKO, Dmitry Cary, 27518 / US | [2024/10] |
Former [2023/25] | 01 /
HAFIZ, Faeza Raleigh, 27606 / US | ||
02 /
ISHCHENKO, Dmitry Cary, 27518 / US | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstraße 3 81675 München / DE | [2023/25] | Application number, filing date | 22166823.9 | 05.04.2022 | [2023/25] | Priority number, date | US202117551502 | 15.12.2021 Original published format: US202117551502 | [2023/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4199290 | Date: | 21.06.2023 | Language: | EN | [2023/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.09.2022 | Classification | IPC: | H02J3/14, B60L53/63, H02J3/38, H02J7/00 | [2023/25] | CPC: |
H02J7/0013 (EP);
B60L53/64 (US);
B60L53/50 (EP);
B60L53/51 (EP);
B60L53/52 (EP);
B60L53/53 (EP);
B60L53/54 (EP);
B60L53/63 (EP,US);
B60L53/65 (US);
B60L53/67 (EP);
H02J3/14 (EP);
H02J3/381 (EP);
B60L2240/80 (EP);
B60L2260/42 (EP);
B60L2260/50 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2024/05] |
Former [2023/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | NETZWERKBESCHRÄNKUNGSENERGIEVERWALTUNGSSYSTEM ZUM LADEN UND PLANEN EINES ELEKTOFAHRZEUGDEPOTS | [2023/25] | English: | NETWORK CONSTRAINT ENERGY MANAGEMENT SYSTEM FOR ELECTRIC VEHICLE DEPOT CHARGING AND SCHEDULING | [2023/25] | French: | SYSTÈME DE GESTION DE L'ÉNERGIE PAR CONTRAINTES DE RÉSEAU POUR LA CHARGE ET LA PROGRAMMATION DE DÉPÔTS DE VÉHICULES ÉLECTRIQUES | [2023/25] | Examination procedure | 06.04.2022 | Examination requested [2023/25] | 21.12.2023 | Amendment by applicant (claims and/or description) | 21.12.2023 | Date on which the examining division has become responsible | Fees paid | Renewal fee | 24.04.2024 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XYI]US2013257372 (CHEN WEI-PENG [US], et al); | [Y]US2021046839 (LOGVINOV OLEG [US], et al) |