Extract from the Register of European Patents

EP About this file: EP4272880

EP4272880 - STRESS RELIEVING FOR CONTINUOUS FLOW ENGINE COMPONENTS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  06.09.2024
Database last updated on 11.04.2026
FormerThe application has been published
Status updated on  06.10.2023
Most recent event   Tooltip06.09.2024Application deemed to be withdrawnpublished on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Siemens Energy Global GmbH & Co. KG
Otto-Hahn-Ring 6
81739 München / DE
[2023/45]
Inventor(s)01 / Avdovic, Pajazit
60209 Norrköping / SE
 [2023/45]
Application number, filing date22171997.406.05.2022
[2023/45]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4272880
Date:08.11.2023
Language:EN
[2023/45]
Search report(s)(Supplementary) European search report - dispatched on:EP07.10.2022
ClassificationIPC:B08B1/04, B08B7/02, B08B9/027, B22F5/00, B22F5/04, B22F10/66, B22F10/68, B33Y40/20, C21D1/30, C21D10/00, C22F3/00, F01D5/00, // B22F10/28
[2023/45]
CPC:
B22F10/68 (EP); B08B7/02 (EP); B22F10/66 (EP);
B22F5/009 (EP); B22F5/04 (EP); B29C64/30 (EP);
B33Y40/20 (EP); C21D10/00 (EP); C22F3/00 (EP);
B22F10/28 (EP); B22F2999/00 (EP); B29C64/35 (EP);
F05D2260/941 (EP); Y02P10/25 (EP) (-)
C-Set:
B22F2999/00, B22F10/68, B22F10/66, B22F2202/01 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/45]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:SPANNUNGSENTLASTUNG FÜR KONTINUIERLICH DURCHSTRÖMTE MOTORKOMPONENTEN[2023/45]
English:STRESS RELIEVING FOR CONTINUOUS FLOW ENGINE COMPONENTS[2023/45]
French:SOULAGEMENT DE CONTRAINTE POUR COMPOSANTS DE MOTEUR À ÉCOULEMENT CONTINU[2023/45]
Examination procedure09.05.2024Application deemed to be withdrawn, date of legal effect  [2024/41]
03.06.2024Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2024/41]
Fees paidPenalty fee
Additional fee for renewal fee
31.05.202403   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[IAY] CN111283191  (NANJING CHENGUANG GROUP CO LTD et al.) [I] 1,2,10,11 * claim 8 * * paragraphs [0002] , [00 4] , [0 16] , [0 17] *[A] 8,9,12 [Y] 3-7,13
 [IAY] CN112322888  (UNIV SHENYANG TECHNOLOGY et al.) [I] 1,10,11 * claims 1, 2 * * paragraph [0002] *[A] 2,8,9,12 [Y] 3-7,13
 [XAYI] CN109604593  (INST METAL RESEARCH CAS et al.) [X] 12 * claim 1 * * examples 1-4 *[A] 3-7,9 [Y] 8,13 [I] 1,2,10,11
 [XAYI] US2018193887  (POURCHER BENOÎT et al.) [X] 12 * paragraphs [0001] , [ 128] - [0132] * * figures 8, 9 *[A] 3-7,9 [Y] 8,13 [I] 1,2,10,11
 [YA] JPH02305930  (METARETSUKUSU KENKYUSHO KK et al.) [Y] 3-7,13 * claims 1, 2, 4 *[A] 1,2,8-12
 [YA] CN105170988  (UNIV SOUTH CHINA TECH et al.) [Y] 8 * claim 9 * * figure 1 *[A] 1-7,9-13
 [XA] US2018333803  (RULE DAVID et al.) [X] 9 * claims 11, 12 * * paragraph [0034] *[A] 1-8,10-13
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.