EP4109514 - INTEGRATED CIRCUIT STRUCTURES HAVING METAL GATES WITH TAPERED PLUGS [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 30.06.2023 Database last updated on 02.11.2024 | |
Former | The application has been published Status updated on 25.11.2022 | Most recent event Tooltip | 01.06.2024 | New entry: Renewal fee paid | Applicant(s) | For all designated states Intel Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | [2022/52] | Inventor(s) | 01 /
HASAN, Mohammad Aloha, 97006 / US | 02 /
GUHA, Biswajeet Hillsboro, 97124 / US | 03 /
GOLONZKA, Oleg Beaverton, 97007 / US | 04 /
GULER, Leonard P. Hillsboro, 97124 / US | 05 /
SHOER, Leah 97008, Beaverton / US | 06 /
OUELLETTE, Daniel Portland, 97229 / US | 07 /
FRANCO NAVARRO, Pedro Portland, 97217 / US | 08 /
GHANI, Tahir Portland, 97229 / US | [2022/52] | Representative(s) | 2SPL Patentanwälte PartG mbB Landaubogen 3 81373 München / DE | [2022/52] | Application number, filing date | 22178905.0 | 14.06.2022 | [2022/52] | Priority number, date | US202117359320 | 25.06.2021 Original published format: US202117359320 | [2022/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4109514 | Date: | 28.12.2022 | Language: | EN | [2022/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.10.2022 | Classification | IPC: | H01L21/8234, H01L21/8238, H01L29/66 | [2022/52] | CPC: |
H01L21/823431 (EP);
H01L27/0924 (US);
H01L21/823481 (EP);
H01L21/823821 (EP);
H01L27/0886 (EP);
H01L29/0649 (US);
H01L29/0673 (EP);
H01L29/42392 (EP);
H01L29/66439 (EP);
H01L29/66545 (EP);
H01L29/66795 (EP);
H01L29/775 (EP);
H01L29/7851 (US);
H01L29/78696 (EP);
B82Y10/00 (EP);
H01L21/823437 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/31] |
Former [2022/52] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | INTEGRIERTE SCHALTUNGSSTRUKTUREN, DIE METALLISCHE GATES MIT KEGELFÖRMIGEN STECKERN AUFWEISEN | [2022/52] | English: | INTEGRATED CIRCUIT STRUCTURES HAVING METAL GATES WITH TAPERED PLUGS | [2022/52] | French: | STRUCTURES DE CIRCUIT INTÉGRÉ DOTÉES DE GRILLES MÉTALLIQUES AVEC DES BOUCHONS CONIQUES | [2022/52] | Examination procedure | 20.06.2023 | Amendment by applicant (claims and/or description) | 28.06.2023 | Examination requested [2023/31] | 28.06.2023 | Date on which the examining division has become responsible | Fees paid | Renewal fee | 30.05.2024 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [IA]US2014252486 (LIN JR-JUNG [TW], et al) [I] 1,2,4-7,9,10 * figures 1-6 * * paragraph [0013] - paragraph [0034] *[A] 3,8,11-15; | [XY]US2015228647 (CHANG CHE-CHENG [TW], et al) [X] 1-10 * figures 1-10 * * paragraph [0019] - paragraph [0056] * [Y] 11-15; | [XA]US2016336320 (LIN CHIH-HAN [TW]) [X] 1-3,5-8,10 * figures 1-12 * * paragraph [0009] - paragraph [0057] * [A] 4,9,11-15; | [XA]US2017222055 (CHANG CHE-CHENG [TW], et al) [X] 1-3,5-8,10 * figures 1-9 * * paragraph [0011] - paragraph [0030] * [A] 4,9,11-15; | [XA]US2018174925 (CHANG CHE-CHENG [TW], et al) [X] 1-3,6-8 * figures 1,2 * * paragraph [0012] - paragraph [0071] * [A] 4,5,9-15; | [Y]US2020098878 (GULER LEONARD P [US], et al) [Y] 11-15 * figures 10A, 11 * * paragraph [0092] - paragraph [0127] * |