blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4152013

EP4152013 - INPUT/OUTPUT (IO) MODULE POWER SUPPLY WITH ONLINE LOAD TEST CAPABILITY [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  29.09.2023
Database last updated on 31.08.2024
FormerThe application has been published
Status updated on  17.02.2023
Most recent event   Tooltip15.03.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Rockwell Automation Technologies, Inc.
1 Allen-Bradley Drive
Mayfield Heights, OH 44124-6188 / US
[2023/12]
Inventor(s)01 / O'Connell, John R.
Mayfield Heights / US
02 / Hopsecger, Edward C.
Mayfield Heights / US
 [2023/12]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2023/12]
Application number, filing date22189913.111.08.2022
[2023/12]
Priority number, dateUS20211741065924.08.2021         Original published format: US202117410659
[2023/12]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4152013
Date:22.03.2023
Language:EN
[2023/12]
Search report(s)(Supplementary) European search report - dispatched on:EP20.02.2023
ClassificationIPC:G01R19/00, G01R19/25, H02H5/04, H03K17/082
[2023/12]
CPC:
G01R19/0092 (EP); G01R31/40 (US); G01R19/2513 (EP);
G05B23/0235 (EP); H02M1/0009 (US); H02M1/08 (US);
H02M3/155 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/44]
Former [2023/12]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:STROMVERSORGUNG FÜR EINGANGS- UND AUSGANGSMODULE (IO) MIT ONLINE-LASTTESTFÄHIGKEIT[2023/12]
English:INPUT/OUTPUT (IO) MODULE POWER SUPPLY WITH ONLINE LOAD TEST CAPABILITY[2023/12]
French:ALIMENTATION DE MODULE D'ENTRÉE/SORTIE (IO) AVEC CAPACITÉ DE TEST DE CHARGE EN LIGNE[2023/12]
Examination procedure22.09.2023Amendment by applicant (claims and/or description)
22.09.2023Examination requested  [2023/44]
22.09.2023Date on which the examining division has become responsible
Fees paidRenewal fee
15.03.2024Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US4520416  (KARASH KARL [US]) [A] 1-15 * column 2, line 31 - column 4, line 41; figures 1-2 *;
 [A]JPH06120787  (MITSUBISHI ELECTRIC CORP) [A] 1-15 * paragraphs [0032] - [0040]; figure 1 *;
 [A]EP0985987  (MEGGITT MOBREY LIMITED [GB]) [A] 1-15* paragraphs [0002] - [0008] - [0017] - [0023]; figure 1 *;
 [XI]US6411119  (FELDTKELLER MARTIN [DE]) [X] 1,9,10 * column 4, line 7 - column 5, line 61; figure 2 * [I] 2-8,11-15;
 [A]DE102004034451  (SIEMENS AG [DE]) [A] 1-15 * paragraphs [0015] - [0027]; figures 1-3 *;
 [A]US2009267582  (PRODIC ALEKSANDAR [CA], et al) [A] 1-15 * paragraphs [0018] - [0032]; figures 1, 3 *;
 [A]US2021148968  (WELLS JAMES [GB], et al) [A] 1-15 * paragraphs [0123] - [0134] - [0 55] - [0063]; figures 1, 8 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.