EP4328129 - AIRCRAFT WALL ASSEMBLY [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 22.08.2024 Database last updated on 19.10.2024 | |
Former | The application has been published Status updated on 26.01.2024 | Most recent event Tooltip | 22.08.2024 | The date on which the examining division becomes responsible, has been established | 22.08.2024 | Request for examination filed | published on 25.09.2024 [2024/39] | 22.08.2024 | Change - designated states | published on 25.09.2024 [2024/39] | Applicant(s) | For all designated states B/E Aerospace (UK) Limited Nissen House, Building 830 Leighton Buzzard, Bedfordshire LU7 4TB / GB | [2024/09] | Inventor(s) | 01 /
CHYLINSKI, Rafal Hubert Milton Keynes / GB | 02 /
PITTS, Thomas Hanslope / GB | 03 /
PATIL, Swapnil Aylesbury / GB | [2024/09] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2024/09] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 22191800.6 | 23.08.2022 | [2024/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4328129 | Date: | 28.02.2024 | Language: | EN | [2024/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.02.2023 | Classification | IPC: | B64C1/10, B64D7/00, B64D45/00, F41H5/04 | [2024/09] | CPC: |
F41H5/013 (EP);
F41H5/007 (US);
B64C1/10 (EP);
B64D7/00 (EP,US);
B64F5/10 (US);
B64D45/0015 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2024/39] |
Former [2024/09] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | FLUGZEUGWANDANORDNUNG | [2024/09] | English: | AIRCRAFT WALL ASSEMBLY | [2024/09] | French: | ENSEMBLE PAROI D'AÉRONEF | [2024/09] | Examination procedure | 16.08.2024 | Amendment by applicant (claims and/or description) | 16.08.2024 | Examination requested [2024/39] | 16.08.2024 | Date on which the examining division has become responsible | Fees paid | Renewal fee | 15.03.2024 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI]US2003114064 (FU ROBERT CHIPIN [US], et al) [X] 1-7,10,12-15 * figures 1-2; claim 1 * [I] 8,9,11; | [A]EP3296194 (AIRBUS OPERATIONS SL [ES]) [A] 1-15* figures 1-2 *; | [XI]WO2021144383 (FOKKER AEROSTRUCTURES BV [NL]) [X] 1-7,10,12-15 * page 11, lines 5-7; figures 1,3 * * page 13, line 5 - page 16, line 25 * [I] 8,9,11 |