blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4148840

EP4148840 - SYSTEMS AND METHODS TO MEASURE OR CONTROL FUEL CELL STACK EXCESS HYDROGEN FLOW [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  22.09.2023
Database last updated on 06.11.2024
FormerThe application has been published
Status updated on  10.02.2023
Most recent event   Tooltip28.09.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Cummins, Inc.
500 Jackson Street
Columbus, Indiana 47201 / US
For all designated states
Hydrogenics Corporation
220 Admiral Boulevard
Mississauga, ON L5T 2N6 / CA
[2023/11]
Inventor(s)01 / Ancimer, Richard J.
Toronto, M6S 3R7 / CA
02 / Forte, Paolo
Maple, L6A 2S9 / CA
03 / Tripathi, Sumit
Columbus, 47201 / US
04 / Van Den Bosch, Frank
Toronto, M8Z 2J4 / CA
05 / Teene, Eero
Hamilton, L9C 3Y6 / CA
 [2023/11]
Representative(s)Bryer, Pamela Ruth
Marks & Clerk LLP
40 Torphichen Street
Edinburgh EH3 8JB / GB
[2023/11]
Application number, filing date22194695.708.09.2022
[2023/11]
Priority number, dateUS202163242931P10.09.2021         Original published format: US 202163242931 P
[2023/11]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4148840
Date:15.03.2023
Language:EN
[2023/11]
Search report(s)(Supplementary) European search report - dispatched on:EP08.02.2023
ClassificationIPC:H01M8/04089, H01M8/0432, H01M8/0438, H01M8/04492, H01M8/04791
[2023/11]
CPC:
H01M8/04089 (EP); H01M8/04753 (US); H01M8/04097 (EP);
H01M8/0432 (US); H01M8/04328 (EP); H01M8/0438 (US);
H01M8/04388 (EP); H01M8/045 (EP); H01M8/04776 (US);
H01M8/04805 (EP); H01M8/247 (US); Y02E60/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/43]
Former [2023/11]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:SYSTEME UND VERFAHREN ZUR MESSUNG ODER STEUERUNG VON ÜBERSCHÜSSIGEM WASSERSTOFFSTROM VON BRENNSTOFFZELLENSTAPELN[2023/11]
English:SYSTEMS AND METHODS TO MEASURE OR CONTROL FUEL CELL STACK EXCESS HYDROGEN FLOW[2023/11]
French:SYSTÈMES ET PROCÉDÉS POUR MESURER OU CONTRÔLER LE DÉBIT D'HYDROGÈNE EN EXCÈS D'UN EMPILEMENT DE PILES À COMBUSTIBLE[2023/11]
Examination procedure15.09.2023Amendment by applicant (claims and/or description)
15.09.2023Examination requested  [2023/43]
15.09.2023Date on which the examining division has become responsible
Fees paidRenewal fee
27.09.2024Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]DE102007004590  (DAIMLER AG [DE], et al) [A] 1-15* the whole document *;
 [XI]US2009208789  (JANARTHANAM SURIYAPRAKASH AYYANGAR [US], et al) [X] 1,15 * the whole document * [I] 1-15;
 [XI]EP3249728  (GEN ELECTRIC [US]) [X] 1,15 * the whole document * [I] 1-15;
 [A]US2019237784  (RAMA PRATAP [GB], et al) [A] 1-15 * the whole document *;
 [XI]US2019245221  (SCOTTO MARK V [US], et al) [X] 1,15 * the whole document * [I] 1-15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.